Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Liquid Hydrogen Absorber
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
Feb. 9, 2002 Mucool FNAL LH2 Absorber R & D Mary Anne Cummings NIU Illinois Consortium for Accelerator Research (IIT, NIU, UC, UIUC), U Miss Oxford U.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
The issue: A non-standard thin window design  No closed form expression for maximum stress vs. volume pressure  FEA (finite element analysis): geometry.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Μ-beam Absorber 1Absorber 2Absorber 3RF 1RF 2 Vacuum LH2 Warm window Windows in MICE: Option 1 (as currently designed) ISIS Safety officer’s comment: If.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Patrick Thornton, SNS/FPE June 9, 2008
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
M. A. C. C. NFMCC UCLA Jan 31, 2007 LH2 Absorber Status Mary Anne Cummings NFMCC UCLA January 31, 2007 Muons, Inc.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
LH2 Absorber Review 1.R&D Motivation 2.Windows (absorber and vacuum) 3.Absorber manifold designs and flow tests 4.System integration 5.Near term plans.
LH2 Absorber Program and Plans Mary Anne Cummings MUTAC Review FNAL Jan 14, 2003.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Apr MUTAC 2005 LH2 Absorber Window R & D Program Mary Anne Cummings MUTAC Review LBL April 26, 2005.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
MICE Detector Integration A. Bross Mice Video Meeting August 27, 2003.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
NPDG Liquid Hydrogen Target: Design and Safety Features
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
MICE Meeting at RAL, Oct-23, 2005
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Linac Test Area Instrumentation
Experimental equipment Edgar L. Black February 17, 2019
Linac Test Area Instrumentation
Presentation transcript:

Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003

What details? 1.Windows (absorber and vacuum) 2.TPG high voltage concerns (and other electrical concerns) 3.Off-center options 4.Installation scenario 5.Testing procedure

Window requirements FNAL Requirements (vacuum): 1.Burst test 5 vacuum windows at room temp. to demonstrate a burst pressure of at least 75 psid for all samples. (pressure exerted on interior side of vacuum volume). 2.Non-destructive tests at room temperature: a.External pressure to 25 psid to demonstrate no failures: no creeping, yielding, elastic collapse/buckling or rupture b.Other absorber vacuum jacket testing to ensure its integrity FNAL Requirements (absorber) 1.Room temp test: pressurize to burst ~ 4 X MAWP (25 psi 2. Cryo test: a) pressure to below elastic limit to confirm consistency with FEA results b) pressure to burst (cryo temp – LN2) ~ 5 X MAWP from ASME: UG 101 II.C.3.b.(i) Plus non-destructive certification  New review required if the windows are welded!!

H2 VAC LH2 Instrumentation

Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals 1.Scenario (2) is the configuration that would be consistent with a safe TPG detector installation. 2.All electronics will have to conform to European safety standards w.r.t. flammable gas. 3.RF & Vacuum windows considered a “hazard/safe” barrier. 4.“Gas-purged” box necessary for non- instrinsically safe electronics within 15 ft. radius of hydrogen (FNAL code) Current conclusion: not a problem – yet!

Off center solid absorber issue Off center absorber position: > what is the change in   0 -   1 /   0 ? < 20% if the absorber had no longitudinal extent

Schedule and assembly Assembly: –Windows manufacture/testing NIU/FNAL –KEK fabricate the absorber heat exchanger associated piping connections and absorber vacuum chamber – NIU/IIT fabricate outer containment vessel, supports, windows for vacuum and absorber, –LBNL/Oxford provide the focussing coils with coils support structures. –Absorber assembly/testing at FNAL –Coil assembly and absorber integration at RAL

Testing procedure 1.Window tested separately 2.Windows tested on absorber (leak checks) 3.Field measurements of coils 4.Purging and filling cycle 5.Instrumentation check and stability monitoring