GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico1 from ANNEX 02 to NCR/FM/INFN/RM2/ cm/tile 4.24 m/layer.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
MPPC update including plastic connector T2K experiment collaboration meeting 2007/4/18 (Wed) S.Gomi T.Nakaya M.Yokoyama ( Kyoto University ) T.Nakadaira.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
1 BFEM Trigger Diagnostics Mar 12, 2002 Tsunefumi Mizuno Note: For reference, this document includes some works already reported (pages 2-5 and 7). The.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Procedure for MCM rework on tray MID 070
GLAST Large Area Telescope:
First Look at Housekeeping Data
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
News on second coordinate readout
GLAST Large Area Telescope:
Noise analysis of the 1m3 DHCal test beam
SuperB SVT Definition of sensor design and z-side connection scheme
Preproduction Status & Results
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
Radiation Laboratory Meeting
Radiant Technologies, Inc. March 29, 2018
FNAL Production Experience
GLAST Large Area Telescope:
Outline Analysis of some real data taken with the GLAST minitower (cosmic rays only). Offline analysis software used. Full Monte Carlo simulation using.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
The encapsulation problem of the LAT heavy trays
Koji Ueno National Taiwan U.
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico2 Description and reference documentation Description –3 different ladders belonging to 2 tower A trays showed signal strips interrupted at half their length –this could be inferred from noise measurements (compatible with half strip capacitance) and CR hitmap occupancy –trays could not be inspected as they were already assembled into tower A Root cause –from comparison with measurements taken during acceptance test at G&A and after thermal cycle we could identify thermal cycle as the origin of the break Reference NCR List –INFN/PI_318 (Tray Heavy 020) –INFN/PI_319 (Tray Bottom 003)

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico3 Acceptance tests at G&A Findings –top plots: noise profiles show no disconnected or interrupted channels –bottom plots: CR hitmaps are uniformly efficient Reference documentation –Bottom 03 tested on 11/26/2004 ( EGSE session GA-alpha-105) –Heavy 020 front tested on 11/24/2004 (EGSE session GA-alpha-89) Bottom 03 Heavy 20 Front

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico4 Post thermal cycle tests Performed on stack of trays for bottom03 (11/28 - EGSE session INFN/PI-beta-15): –Noise profile shows a group of channels with lower noise. these channels were not detected as threshold for disconnected channels is ENC strip < 500 e - and they are just about above that threshold –CR hitmaps shows a less than 100% efficient region correspondingly Heavy 20 Front was not tested before tower assembly for a mistake: –After a standard flow-chart thermal cycle (4 cycles) a HV short was found on ladder 0 of back side (signal bonds touching ladder edge - NCR INFN/PI-303) –The tray was immediately brought to G&A (11/29) for repair without testing front side –The repaired back side was tested OK at G&A –The tray came back to INFN (11/29) and went to a second thermal cycle (2 cycles) but only the repaired side (back) was tested afterwards (11/30), in parallel to the start of tower assembly, and assuming that the front side had been tested before Bottom 03

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico5 Tower A findings Bottom 03Heavy 20 Front Mid 82 Back Tower 1 st test (11/26/ INFN/PI-gamma-9) clearly revealed the problem – Mid 82 shown for reference as a good layer

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico6 Offline analysis confirm the problem 2D scatter plot X0 vs Y0: dead channels are inefficient all along strip length broken wire bonds along ladder are efficient for part of strip length 1D CR hitmap Y0 (Bottom 03) ~30 strips half dead ~ some strips broken at ¼ length? 1D CR hitmap X0 Few dead channels

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico7 Offline analysis confirm the problem 2D scatter plot X4 vs Y4: Break again at half strip length 1D CR hitmap Y4 (Heavy 20 Front) ~1.5 ladders half dead 1D CR hitmap X4 Few dead channels

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico8 Offline analysis from tower 0 Went back to tower 0 data –The only tray showing interrupted strips had very few live channels (NCR INFN/PI-92) –The problem was there already

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico9 Conclusions and Proposed dispositions Conclusions –Wirebonds connecting different SSDs inside a ladder broke in 4 ladders attached to 3 different trays of stiff type (heavy and bottom) –Break tend to appear at the centre of tray –Root cause is very likely the same effect that broke wirebonds between strips and FE and led us to remove encapsulation –We cannot remove encapsulation on ladders Proposed dispositions (for both NCRs) –use trays as they are for tower A: there was no availability of spare trays of heavy or bottom type, therefore trays were assembled into tower A to keep up with the schedule –Review temperature ranges for thermal cycles and thermal- vacuum tests: Proposed range is -20C - +50C Qualification program on tower0 trays

GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico10 Tower A first 100 events Despite this issue, Tower A was assembled and test in a week and it’s a good tower!