GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.

Slides:



Advertisements
Similar presentations
3. Technical Documentation
Advertisements

Configuration Management
GP2013 (R2) New features in GP2013 (R2). New Ribbon for windows Edit List is the Print button on the right without the paper background Action pane can.
Accessing and Using the e-Book Collection from EBSCOhost ® When an arrow appears, click to proceed to the next slide at your own pace. To go back, click.
Performing an educational supervisor report. Step by Step guide By Dr Kim Emerson January 2013.
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT ProjectAll Hands Meeting – May 11, 2005 R. Claus 1 GLAST Large Area Telescope: LAT All Hands Meeting I&T/Online May 11, 2005 Ric Claus I&T/Online.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays The GLAT GUI monitoring.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Slide 1 FastFacts Feature Presentation 12/16/2014 To dial in, use this phone number and participant code… Phone number: Participant code:
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Getting the Most Out of Blue Mountain RAM
SDLC Project Brady Goyn, Doug Reeves Planning Analyze Design
Objectives  Understand the purpose of the superuser account  Outline the key features of the Linux desktops  Navigate through the menus  Getting help.
Event Viewer Was of getting to event viewer Go to –Start –Control Panel, –Administrative Tools –Event Viewer Go to –Start.
Naviance & Common Application
Ch 11 Managing System Reliability and Availability 1.
VIA Visitor Internet Access at the Baylor University Libraries.
Recovery-Oriented Computing User Study Training Materials October 2003.
Welcome to Keyboarding Pro DELUXE ® Get Started Get Started Create Your Student Record Create Your Student Record The Main Menu The Main Menu Send Files.
1 Software Development Configuration management. \ 2 Software Configuration  Items that comprise all information produced as part of the software development.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Credit Hours Agenda IntroductionProblem Statement Objectives Project PlanMethodology Work Breakdown Structure Requirements and specificationSoftware Requirements.
Requirements and Estimation Process From a CMM Level 5 Organization Alan Prosser.
Learningcomputer.com SQL Server 2008 – Administration, Maintenance and Job Automation.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
System Analysis (Part 3) System Control and Review System Maintenance.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
SCMnet Troubleshooting Tips Tips for resolving common Agile to Oracle transfer issues Cass Smith Business Systems Analyst Symmetricom
Systems Development Life Cycle: Mean Motocross Machines By: Cortney Robertson Paul Garcia.
Deploying Software with Group Policy Chapter Twelve.
Configuring and Troubleshooting Identity and Access Solutions with Windows Server® 2008 Active Directory®
Chapter 9: Networking with Unix and Linux. Objectives: Describe the origins and history of the UNIX operating system Identify similarities and differences.
Tips and Tricks in Sundial  May 2005.
Bug Or Feature Submitting Support Requests and Development Ideas.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
My MCC Service Portal Welcome to presentation of new MCC.com.sg.
1 © 2004 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Seminar Using the Cisco Technical Support Website.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
June 23–24, 2016 Hyatt Regency Boston Harbor User Group Meeting and Conference Special Introduction to the New User Interface/Experience Rachael LeBlanc,
Configuration Management
Configuration Management
Software Project Configuration Management
Configuration Management
The Role of the State Administrator
GLAST Large Area Telescope
DevOps: Azure Monitoring & Authoring Updates for Operations Manager 2012 SP1
JavaScript Form Validation
GLAST Large Area Telescope:
GLAST Large Area Telescope
Presentation transcript:

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook Release Alicia T. Kavelaars Online Engineer SLAC Gamma-ray Large Area Space Telescope

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 2 Agenda We will cover: –E-Logbook New Features –E-Logbook Fixed Problems –E-Logbook Documentation –E-Logbook V&V –Next release: Outstanding Issues –E-Logbook Website

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 3 E-Logbook New Features –All I&T requirements described in LAT-MD have been implemented. –New Logs: EGSE Log FSW Log Configuration Log –FHW. –FSW (added feature). –EGSE Validation (added feature). Configuration Request Log. –New design of Shift Log: faster, more user friendly. Activity Report (added feature). Error flag for runs (added feature).

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 4 E-Logbook New Features New Features: –New EGSE Log Added EGSE Type to take into account four types of EGSE: –SIMPLE, GASU, WORKSTATION, SERVER.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 5 E-Logbook New Features New Features: –A N/A validation date can now be entered for those components which never need to be revalidated, for example software components.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 6 E-Logbook New Features New Features: –FSW Log Following Requirements in LAT-MD-04601

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 7 E-Logbook New Features New Features: –Configuration Log Requirements in LAT-MD Requirements were for FHW, Implemented as well for FSW and EGSE. Snapshot of the System that shows current state of selected type of components. Nice feature: IF any of the EGSE components are expired or about to expire validation, a flag in the Main window is raised and the Configuration Log can be accessed to revalidate records.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 8 E-Logbook New Features New Features: –Configuration Log vs. Component Report: The difference between the configuration log and the component report is: –The configuration log shows the LAST RECORD for ALL components any given time: it shows the current state of the system. –The Component Report shows ALL RECORDS for a given component: it shows the history of the component throughout the I&T effort.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 9 E-Logbook New Features New Features: –Configuration Log vs. Component Report: ≠

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 10 E-Logbook New Features New Features: –Configuration Request Log Requirements in LAT-MD Lists all Configuration Log requests for either the FHW, FSW or the EGSE components. Accessible from the Main Window.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 11 E-Logbook New Features New Features: –Shift Log New Activity Tables that are sort able, with copy and paste capability. New Activity Report If the runs have errors they will be red flagged.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 12 E-Logbook New Features New Features: –Activity Report Shows ALL activities for a given Shift. Refreshes if a new Shift is selected. Accessible from the Shift Log window.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 13 E-Logbook Fixed Problems Fixed Problems –Shift Log Shift Handover –Users are asked to choose to make an entry between selected shift or synchronized shift. Make sure Shifters sign in –If a user tries to make an entry on a shift he has not signed to, he/she will be prompted to do so. Fixed slowdown when browsing Shifts. Runs with errors are listed in red and with “/E” after event count. –EGSE Log: Improved design to take into account not only hardware EGSE (such as Test Stands, GASU Stands) but also software EGSE (such as Workstations and Servers).

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 14 E-Logbook Fixed Problems Fixed Problems (CONT.) –MMR Log: Can log materials that do not expire. –FHW Log: Improved design includes all info in one table instead of four. –Fixed JIRA Issues: Release Notes for E-Logbook 3.3.0

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 15 E-Logbook Documentation and V&V Documentation: –LAT-PS released. –E-Logbook Tutorial. –E-Logbook Website. V&V: –Full Test of E-Logbook on 03/30/05 passed. –Test Report for E-Logbook signed off by QA and I&T Manager.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 16 Next E-Logbook Release Next Release: Outstanding Issues –Print Procedures for EGSE, FSW, Configuration Logs,… –Analysis tools. –User Questionnaire to receive feedback about E-Logbook. –New bug fixes/JIRA issues’ fixes.

GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 17 E-Logbook Website –