Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 1 Introduction Heinz-Dieter.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Workshop Introduction Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Physics April 29, 2004 Heinz-Dieter Nuhn, SLAC / SSRL Facility Advisory Committee Meeting Undulator Physics Diagnostics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Bingxin Yang High resolution effective K September 22-23, 2004 High-Resolution Effective K Measurements Using Spontaneous.
John Arthur November 14, 2005 Summary Discussion John Arthur SLAC LCLS Beam-Based Undulator K Measurement Workshop.
Undulator Physics Update – October 27, 2005 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Physics Update Heinz-Dieter Nuhn, SLAC.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Undulator Commissioning September 22, 2004 Heinz-Dieter Nuhn, SLAC / SSRL LCLS Commissioning Workshop Undulator / FEL Commissioning.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Undulator Overview FEL Performance Assessment
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Bingxin Yang Large aperture spectrum Beam-based undulator measurement workshop, Nov. 14, 2005 Undulator Effective-K Measurements.
Undulator Physics Update October 12, 2004 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics Update.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
“Pinhole Measurement” Approach to K Measurements using Spontaneous Radiation November 14, 2005 J. Welch, R. Bionta, S. Reiche.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Wrap-up 20 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Spontaneous Radiation at LCLS Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
Undulator Specifications Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Bingxin Yang Undulator / FEL October 12, 2004 Undulator / FEL Diagnostics Bingxin Yang Argonne National Lab.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
James Welch August 27,2009 FEL 2009 Undulator K-Parameter Measurements at LCLS J. Welch, SLAC National Accelerator Laboratory Contributors:
Undulator parameters choice/wish based on a simplified XFEL cost model Jürgen Pfingstner 29 st of July 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
LCLS-II Physics Meeting, May 08, 2013 LCLS-II Undulator Tolerances Heinz-Dieter Nuhn LCLS-II Undulator Physics Manager May 8, 2013.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Thermal emittance measurement Gun Spectrometer
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Overview Pre-Beam Checkouts
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
High Level Physics Applications for LCLS Commissioning
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
FEE Diagnostics and Commissioning
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Final Break Length Choice AC Conductivity Wakefields
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Breakout Session SC3 – Undulator
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
LCLS Lehman Review February 7-9, 2005
Presentation transcript:

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 1 Introduction Heinz-Dieter Nuhn, SLAC / LCLS November 14, 2005 Need for Beam Based Undulator K Measurements Review of Beam Based K Measurement Discussions LCLS Undulator Diagnostics Baseline Components LCLS FEL Commissioning Milestones Workshop Objective and Agenda Charge to the Workshop Need for Beam Based Undulator K Measurements Review of Beam Based K Measurement Discussions LCLS Undulator Diagnostics Baseline Components LCLS FEL Commissioning Milestones Workshop Objective and Agenda Charge to the Workshop

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 2 Linac Coherent Light Source Near Hall Far Hall Undulator

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 3

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 4 Undulator Type planar hybrid Magnet Material NdFeB Wiggle Planehorizontal Gap6.8mm Period Length30.0 ± 0.05mm Effective On-Axis Field1.249T Standard Effective K3.500 ± 0.015% Range of Effective Undulator Parameter K (3.480) Accumulated Segment Phase Error Tolerance 10degrees (at any point along segment) Module Length3.40m Number of Modules33 Undulator Magnet Length112.2m Standard Break Lengths cm Nominal Total Device Length m Quadrupole Magnet Technology EMQ Nominal Quadrupole Magnet Length 7cm Integrated Quadrupole Gradient 3.0T Undulator Type planar hybrid Magnet Material NdFeB Wiggle Planehorizontal Gap6.8mm Period Length30.0 ± 0.05mm Effective On-Axis Field1.249T Standard Effective K3.500 ± 0.015% Range of Effective Undulator Parameter K (3.480) Accumulated Segment Phase Error Tolerance 10degrees (at any point along segment) Module Length3.40m Number of Modules33 Undulator Magnet Length112.2m Standard Break Lengths cm Nominal Total Device Length m Quadrupole Magnet Technology EMQ Nominal Quadrupole Magnet Length 7cm Integrated Quadrupole Gradient 3.0T Summary of Nominal Undulator Parameters

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 5 Undulator Segment Prototype

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 6 Undulator Pole Canting Canting comes from wedged spacers 4.5 mrad cant angle Gap can be adjusted by lateral displacement of wedges 1 mm shift means 4.5 microns in gap, or 8.2 Gauss B eff adjusted to desired value

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 7 Using Undulator Roll-Away and K Adjustment Function Neutral; K=3.5000;  x=+0.0 mm SpontTp; K=3.4929;  x=+3.0 mmRollAway; K=0.0000;  x=+100 mm PowerTp; K=3.4804;  x=+8.5 mm Horizontal position of undulator segment can be remotely controlled correct K eff on beam axis This adjustment range goes from fraction of a percent to a complete field turn-off. Horizontal position of undulator segment can be remotely controlled correct K eff on beam axis This adjustment range goes from fraction of a percent to a complete field turn-off. Beam Axis

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 8 Measurement of Spontaneous Radiation Using Rollout Undulator Segments can be removed by remote control from the end of the undulator. They will not effect radiation produced by earlier segments.

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 9 Effects Influencing K eff Undulator Segment Tuning Undulator Temperature Transverse Segment Position Segment Fiducialization and Alignment Electron Beam Trajectory Environmental Field in Undulator Hall Radiation Damage Effects Influencing K eff Undulator Segment Tuning Undulator Temperature Transverse Segment Position Segment Fiducialization and Alignment Electron Beam Trajectory Environmental Field in Undulator Hall Radiation Damage Insufficient Knowledge of Actual K Seen by Electrons Need for Beam Based Undulator K Measurements See Tolerance Budget on next Slide

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 10 Segment Detuning Sub-Budget Parameter p i Typical Value rms dev.  p i Note K MMF ±0.015 % uniform KK °C °C -1 Thermal Coefficient TT 0 °C0.32 °C±0.56 °C uniform without compensation KK mm mm -1 Canting Coefficient xx 1.5 mm0.05 mmHorizontal Positioning

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 11 January 2004 Z. Huang Sven Reiche September 2004: LCLS Diagnostics and Commissioning Workshop High-Resolution Effective K Measurements Using Spontaneous Undulator RadiationHigh-Resolution Effective K Measurements Using Spontaneous Undulator Radiation, Bingxin Yang October 2004: LCLS Week Undulator / FEL DiagnosticsUndulator / FEL Diagnostics, Bingxin Yang January 2005: LCLS FEL Physics Meeting Simulation Results for 200-pC ("chargito") SASE performance with AC WakeSimulation Results for 200-pC ("chargito") SASE performance with AC Wake, Jim Welch April 2005 ICFA Commissioning Workshop at Zeuthen (Work Package 6) Measurement of Undulator Segment K_effective using Spontaneous Radiation in the Near Hall of the LCLSMeasurement of Undulator Segment K_effective using Spontaneous Radiation in the Near Hall of the LCLS, Jim Welch High resolution undulator measurements using angle-integrated spontaneous spectra, High resolution undulator measurements using angle-integrated spontaneous spectra, Bingxin Yang 0measurements.pdf July 2005 LCLS Week: K-Measurement Strategies discussion presented by Jim Welch and Bingxin Yang October 2005 FAC Meeting X-Ray DiagnosticX-Ray Diagnostic, Richard Bionta January 2004 Z. Huang Sven Reiche September 2004: LCLS Diagnostics and Commissioning Workshop High-Resolution Effective K Measurements Using Spontaneous Undulator RadiationHigh-Resolution Effective K Measurements Using Spontaneous Undulator Radiation, Bingxin Yang October 2004: LCLS Week Undulator / FEL DiagnosticsUndulator / FEL Diagnostics, Bingxin Yang January 2005: LCLS FEL Physics Meeting Simulation Results for 200-pC ("chargito") SASE performance with AC WakeSimulation Results for 200-pC ("chargito") SASE performance with AC Wake, Jim Welch April 2005 ICFA Commissioning Workshop at Zeuthen (Work Package 6) Measurement of Undulator Segment K_effective using Spontaneous Radiation in the Near Hall of the LCLSMeasurement of Undulator Segment K_effective using Spontaneous Radiation in the Near Hall of the LCLS, Jim Welch High resolution undulator measurements using angle-integrated spontaneous spectra, High resolution undulator measurements using angle-integrated spontaneous spectra, Bingxin Yang 0measurements.pdf July 2005 LCLS Week: K-Measurement Strategies discussion presented by Jim Welch and Bingxin Yang October 2005 FAC Meeting X-Ray DiagnosticX-Ray Diagnostic, Richard Bionta Discussions of Beam Based K Measurements Based on Spontaneous Undulator Radiation

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 12 Diagnostics presently being developed to Characterize Electron Beam and X-Ray Properties include Electron Beam Diagnostics in the Linac-To-Undulator (LTU) Beamline Electron Beam and X-Ray Diagnostics in the Undulator Electron Beam Diagnostics after the Undulator (Dump Line) X-Ray Diagnostics in the Front End Enclosure (FEE) Diagnostics presently being developed to Characterize Electron Beam and X-Ray Properties include Electron Beam Diagnostics in the Linac-To-Undulator (LTU) Beamline Electron Beam and X-Ray Diagnostics in the Undulator Electron Beam Diagnostics after the Undulator (Dump Line) X-Ray Diagnostics in the Front End Enclosure (FEE) Review of Existing LCLS Baseline Diagnostics

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 13 Control of Electron Beam Properties before Entrance into the Undulator LTU Electron Beam Diagnostics

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 14 4 wires  , ,  (+ collimators) 1 OTR  slice- , ,  abort dump OTR  slice E-spread (0.02%) x1x1x1x1 x2x2x2x2 2 BPMs  energy jitter relative energy centroid resolution: 0.003% (5-  m BPMs) LTU Courtesy of Paul Emma

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 15 Control of Electron Beam Trajectory inside the Undulator X-Ray Beam Diagnostics

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 16 Short Break Section Components Courtesy of Dean Walters Quadrupole Undulator Segment Cherenkov Detector Undulator Segment RF Cavity BPM Beam Finder Wire

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 17 Long Break Section Components Quadrupole Undulator Segment Cherenkov Detector Undulator Segment Diagnostics Tank Beam Finder Wire RF Cavity BPM Courtesy of Dean Walters

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 18 Electron Beam Diagnostics after Undulator After Undulator Electron Beam Diagnostics

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 19 1 OTR  energy-spread (0.001%) 1 BPM  energy-jitter (0.003%) Dump-Line Courtesy of Paul Emma

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 20 Measurement of X-Ray Beam Properties in FEE Diagnostics in the Front End Enclosure

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 21 FEE Layout Fast close valve Slit Ion Chamber Diagnostics Package Gas Attenuator Solid Attenuator SiC Mirror 1 Be Mirrors 2 & 3 SiC Mirror 2 Collimator 1 Diagnostics Package Courtesy of Richard Bionta

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 22 Desired Spontaneous Measurements f(x,y, 1 )Spatial distribution around 1 1 1st harmonic Photon wavelength   1st harmonic wavelength spread Beam direction uTotal energy / pulse  u,  1 Temporal variation in beam parameters Courtesy of Richard Bionta

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 23 FEE Cartoon Solid Attenuator Gas Attenuator High-Energy Slit Start of Experimental Hutches 5 mm diameter collimators Muon Shield FEL Offset mirror system Total Energy Calorimeter WFOV Direct Imager Spectrometer / Indirect Imager mirror Windowless Ion Chamber e-e- Diagnostic Package Spectrometer camera Courtesy of Richard Bionta

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 24 Redundant Commissioning Instrumentation InstrumentPurposeAdjustmentCalibration and Physics risks Direct ImagerSP f(x,y), look for FEL, measure FEL u, f(x,y), x,y ND filter, Attenuators Scintillator linearity, Attenuator linearity and background Indirect ImagerMeasure FEL u, f(x,y), spectral imaging of SP and FEL harmonics, attenuator calibration Mirror AngleMirror reflectivity, damage Total EnergyFEL uAttenuatorsEnergy to Heat, damage Ion ChamberFEL u, x,y,x',y'PressureSignal strength SpectrometersFEL, SP spectraAttenuatorsResolution, damage Courtesy of Richard Bionta

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 25 MS3BO_040: Front End Beneficial Occupancy (9/5/2007) MS3BO_030: Undulator Facility Beneficial Occupancy (12/3/2007) MS3_XT040: Solid Attenuator Installation Complete (12/14/2007) MS3_XT045: Gas Attenuator Installation Complete (12/14/2007) MS3_XT080: Start Front End Enclosure Commissioning (3/4/2008) MS3_LN015: Start Linac-to-Undulator (LTU) Commissioning (5/12/2008) MS3_XT066: Start Near Experimental Hall Checkout (6/12/2008) MS3_UN020: Undulator System Installation Complete (7/18/2008) MS3_UN025: Start Undulator Commissioning (1 st Light) (7/24/2008) MS3BO_040: Front End Beneficial Occupancy (9/5/2007) MS3BO_030: Undulator Facility Beneficial Occupancy (12/3/2007) MS3_XT040: Solid Attenuator Installation Complete (12/14/2007) MS3_XT045: Gas Attenuator Installation Complete (12/14/2007) MS3_XT080: Start Front End Enclosure Commissioning (3/4/2008) MS3_LN015: Start Linac-to-Undulator (LTU) Commissioning (5/12/2008) MS3_XT066: Start Near Experimental Hall Checkout (6/12/2008) MS3_UN020: Undulator System Installation Complete (7/18/2008) MS3_UN025: Start Undulator Commissioning (1 st Light) (7/24/2008) LCLS FEL Commissioning Milestones Diagnostics needed around July 2008

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 26 Define a strategy for using spontaneous undulator radiation to measure the K value of every individual LCLS Undulator Segment after installation in the Undulator Hall. To reach the objective, the physics and technologies necessary need to be identified. Workshop discussions will include Usable spectral features of spontaneous radiation Strategies for beam-based K measurements Specifications for suitable instruments Scheduling issues Three Work Packages have been defined and assigned to three different groups. Work described by these Work Packages has been carried out in preparation of the workshop and will be presented and discussed at the workshop. Define a strategy for using spontaneous undulator radiation to measure the K value of every individual LCLS Undulator Segment after installation in the Undulator Hall. To reach the objective, the physics and technologies necessary need to be identified. Workshop discussions will include Usable spectral features of spontaneous radiation Strategies for beam-based K measurements Specifications for suitable instruments Scheduling issues Three Work Packages have been defined and assigned to three different groups. Work described by these Work Packages has been carried out in preparation of the workshop and will be presented and discussed at the workshop. Workshop Objective

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 27 Workshop Agenda

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 28 Group: B. Yang, R. Dejus Task: Examine robustness of angle-integrated measurements of undulator spectrum. Consider effects of errors in beam alignment, undulator magnet structure, straightness of vacuum pipe, alignment of spectrometer, etc. Consider effects of location of undulator segment being tested. Determine what are realistic values for the precision with which the value of K can be determined for an undulator segment at the beginning, middle, and end of the undulator. This task explores the use of the high-energy edge of the fundamental spectral peak (the third harmonic may also be considered) of a single undulator to measure its K parameter. The measuring spectrometer will be located in the LCLS FEE, roughly 100 m downstream from the final undulator segment. Realistic values for the angular acceptance of the measurement (limited by beam-pipe apertures, or apertures at the measuring point) should be considered. Group: B. Yang, R. Dejus Task: Examine robustness of angle-integrated measurements of undulator spectrum. Consider effects of errors in beam alignment, undulator magnet structure, straightness of vacuum pipe, alignment of spectrometer, etc. Consider effects of location of undulator segment being tested. Determine what are realistic values for the precision with which the value of K can be determined for an undulator segment at the beginning, middle, and end of the undulator. This task explores the use of the high-energy edge of the fundamental spectral peak (the third harmonic may also be considered) of a single undulator to measure its K parameter. The measuring spectrometer will be located in the LCLS FEE, roughly 100 m downstream from the final undulator segment. Realistic values for the angular acceptance of the measurement (limited by beam-pipe apertures, or apertures at the measuring point) should be considered. Work Package 1: Angle Integrated Measurement

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 29 Group: J. Welch, R. Bionta, S. Reiche Task: Examine robustness of pinhole measurements of undulator spectrum. Consider effects of errors in beam alignment, undulator magnet structure, straightness of vacuum pipe, alignment of pinhole and spectrometer, etc. Consider effects of location of undulator segment being tested. Determine what are realistic values for the precision with which the value of K can be determined for an undulator segment at the beginning, middle, and end of the undulator. This task explores the use of the fundamental spectral peak (the third harmonic may also be considered) of a single undulator, as seen through a small angular aperture, to measure its K parameter. The measuring spectrometer will be located in the LCLS FEE, roughly 100 m downstream from the final undulator segment. Realistic values for the angular acceptance of the measurement should be determined, and the effects of misalignment of the aperture or undulator axis should be carefully considered. Group: J. Welch, R. Bionta, S. Reiche Task: Examine robustness of pinhole measurements of undulator spectrum. Consider effects of errors in beam alignment, undulator magnet structure, straightness of vacuum pipe, alignment of pinhole and spectrometer, etc. Consider effects of location of undulator segment being tested. Determine what are realistic values for the precision with which the value of K can be determined for an undulator segment at the beginning, middle, and end of the undulator. This task explores the use of the fundamental spectral peak (the third harmonic may also be considered) of a single undulator, as seen through a small angular aperture, to measure its K parameter. The measuring spectrometer will be located in the LCLS FEE, roughly 100 m downstream from the final undulator segment. Realistic values for the angular acceptance of the measurement should be determined, and the effects of misalignment of the aperture or undulator axis should be carefully considered. Work Package 2: Pinhole Measurement

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 30 Group: J. Hastings, et al. Task: Assume that a single shot spectral measurement is needed for an LCLS spontaneous undulator pulse. What are the best options for doing the measurement? What spectral resolution can be obtained using these methods? What are the effects of beam jitter, spectrometer misalignment, etc? This task explores the design and performance of x-ray spectrometers capable of providing centroid or edge position with high resolution, on a single-shot of radiation from a single LCLS undulator. The spectrometer will most likely be located in the LCLS FEE, about 100 m downstream from the final undulator segment. Group: J. Hastings, et al. Task: Assume that a single shot spectral measurement is needed for an LCLS spontaneous undulator pulse. What are the best options for doing the measurement? What spectral resolution can be obtained using these methods? What are the effects of beam jitter, spectrometer misalignment, etc? This task explores the design and performance of x-ray spectrometers capable of providing centroid or edge position with high resolution, on a single-shot of radiation from a single LCLS undulator. The spectrometer will most likely be located in the LCLS FEE, about 100 m downstream from the final undulator segment. Work Package 3: Single-Shot Spectral Measurement

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 31 Characterize the spectral features of spontaneous synchrotron radiation that are usable for beam-based K-measurements. Identify the most appropriate strategy for beam-based K- measurements. Specify suitable instruments for the identified beam-based K- measurement strategy. List expected performance parameters such as resolution of K measurement as function of beam charge, and segment location as well as expected tolerances to trajectory and energy jitter. List any open questions regarding the feasibility of the most appropriate strategy. List the R&D activities, if any, needed before the design of a measurement system can be completed and manufacturing/procurement can start. Characterize the spectral features of spontaneous synchrotron radiation that are usable for beam-based K-measurements. Identify the most appropriate strategy for beam-based K- measurements. Specify suitable instruments for the identified beam-based K- measurement strategy. List expected performance parameters such as resolution of K measurement as function of beam charge, and segment location as well as expected tolerances to trajectory and energy jitter. List any open questions regarding the feasibility of the most appropriate strategy. List the R&D activities, if any, needed before the design of a measurement system can be completed and manufacturing/procurement can start. Workshop Charge

Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 32 End of Presentation