Loran-C Receiver Team Deathstar: Christopher Birschbach Matthew Hayman Matthew Anderson Christina Corner Erin Mowbray October 5, 2004 ECEN 4610 Capstone.

Slides:



Advertisements
Similar presentations
MC68HC11 System Overview. System block diagram (A8 version)
Advertisements

What is Arduino?  Arduino is a ATMEL 168 micro-controller kit designed specially for small projects  User friendly IDE(Integrated Development Environment)
A-Team Home Central Control Unit Kevin Cooke Peter Larson Ben Verstegen Andreas Rugloski Aden Abdillahi.
DARSI 2 CDR Adrienne Baile Preston Schipper Matt Hulse Project Overview Components: Design Status Administrative Data Acquisition & Real-time System Integration.
Autonomous Sensor and Control Platform Rover Tae Lee Josh Reitsema Scott Zhong Mike Chao Mark Winter.
Problems Encountered - Up to Midterm State Machine Transitions Much Too Fast - Solved by Decreasing Clock (LED Circuit) Difficult to Test LED (Column)
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
Loran-C Receiver Team Deathstar September 7, 2004 Capstone Fall 2004.
Capstone Fall 2005 GFX-One Guitar Processor Team Carpal Tunnel September 8, 2005.
“THE LOCATOR” R. F. LOCATION SYSTEM MIKE GOULD KARA MCMILLIN MARCUS PEARLMAN CHRIS SINKEY JACOB WILTGEN TEAM ZISSOU presents….
Team Monte Cristo Joseph Carrafa Sharon Clark Scott Hassett Alex Mason The Deep Fried Game Station.
PDR – GPS Rover Travis Gruber Matthew Kennedy Marcin Skirucha Phill Treddenick.
Globex Proprietary Competition Sensitive Ubiquitous - MP3 Player Ian BrattJohn Pratt Eric LeeWei-Shin Wang David Lindstone ECEN 4573 Capstone Lab Spring.
Solar Car Data Collection System Matt Boyden Rene Dupuis Ryan Lavallee 4/23/08.
A.R. Hertneky J.W. O’Brien J.T. Shin C.S. Wessels Laser Controller One (LC1)
Ping Project Justin Knowles Kurt Lorhammer Brian Smith Andrew Tank ECEN 4610.
Characterization Presentation Spring 2006 Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Design and Development of High Performance PC Based Logic Analyzer MSc Project by Rab Nawaz Advisor: Dr. Shahid Masud.
Preliminary Design Review Jan 31, 2006 Brianna Bethel Robert Havlik Jessica Lowry Alex Silva.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
Team Monte Cristo Joseph Carrafa Sharon Clark Scott Hassett Alex Mason The Deep Fried Game Station.
1 Color Discriminating Tracking System Lloyd Rochester Sam Duncan Ben Schulz Fernando Valentiner.
Capstone Fall 2005 GFX-One Guitar Processor Team Carpal Tunnel October 6 th 2005.
2004 CAPSTONE CDR Team SAFE Members Anders Fornberg Alejandro Henriquez Shannon Lahr Aaron Lyons Sean Groves Shannon.
ECEN 4610 Capstone Laboratory Spring 2010 PokerTech Erik Morrisey | Electrical Engineering Chris Weigel | Electrical Engineering Ho Yun Chan | Electrical.
EEG Machine By The All-American Boys Featuring Slo- Mo Motaz Alturayef Shawn Arni Adam Bierman Jon Ohman.
BeHāv Student Behavior Feedback System. Overview Team What is BeHav In Action Features Design Risks Time-Line.
Capstone CDR Fall 2005 Team Doki Doki: Paintball Gun IR Sensing and Tracking Team Members: Matt Freeman James Kirby Juan Rivera.
Aztec PC Scope Preliminary Design Review Fall 2006 Michael MasonJed Brown Andrew YoungsJosh Price.
Team Lifted: Critical Design Review Andrew Cober Dan Crowe Sujan Gautam Anthony Schubert Ryan Yeash.
Jeff Burch Simon Dakermanjian Mazen Arakji Jonah Kadish Derek Smith
Coordinate Based Tracking System
(Voice Activated Home Control System). Project Summary Control any IR activated device –Via voice command Learnable –Learn IR Code –Learn Voice Command.
LED Light Show Critical Design Review Team Lit Michael Hatt Scott Butler Kristin Haeusler Brock Smith.
Aztec PC Oscilloscope Michael Mason Jed Brown Josh Price Andrew Youngs.
Michael Davies Andrew Mountain Dan Hoang Daniel Brink Michael Davies Andrew Mountain Dan Hoang Daniel Brink Power Distribution Control Unit.
Tracking Rover Team Rubber Ducky Alex Chi Joshua Rubin Alexander Starick Ryan Ramos.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag May 2, 2000 Senior Project Final Presentation.
ASPPRATECH.
Capstone PDR Fall 2005 Paintball Gun IR Sensing and Tracking Team Doki Doki: Matt Freeman (EE) James Kirby (ECE) Juan Rivera (EE)
Watt Watch Hassan Alabudib Yirui Huang Peng Chen Kamal Sabi Marisol Lozano Roman.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
Critical Design Review 27 February 2007 Black Box Car System (BBCS) ctrl + z: Benjamin Baker, Lisa Furnish, Chris Klepac, Benjamin Mauser, Zachary Miers.
BeH ā v Student Behavior FeedbackSystem. Overview Team BeHāV Overview Schematic Parts Software Hub Timeline Budget.
Objectives How Microcontroller works
Jeffrey Hepworth Erik Mauer Brendan Murphy David Rodriguez VEND Team VEND‘etta’
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
Project O.N.O.S.E. Optical Noxious Odor Sensing Electronics Capstone Critical Design Review Fall 2003.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Team Dominate(d?) The Machine.
Fall CS-EE 480 Lillevik480f04-l1 University of Portland School of Engineering Project Swift Fox Design Review 21 Jan 2005 Peter Brunke Andrew Robinson.
HYDRIL SUBSEA CONTROL MODULE FOR OIL WELL BLOW-OUT PREVENTER (BOPs) Team 3B Matt Hewitt – Project Manager Devin Welch – Configuration Manager Paul Jaramillo.
CS-EE 481 Spring Swift-Fox Founder’s Day, 2005 University of Portland School of Engineering Imagine the ability to view and record Up to five different.
CDR- Digital Audio Recorder/Player Brian Cowdrey Mike Ingoldby Gaurav Raje Jeff Swetnam.
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Andrew Russell Sponsor: Nigel Thompson, RT Logic Advisor: Dr. William.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Scott Russell Sponsor: Nigel Thompson Advisor: Dr. William Harrison.
Home Area Networking for the Smart Grid Erik Cates David Green Daniel Han Justin Michela ECE 4007 Koblasz/Maxwell Fall 2010 In Conjunction With: Unmesh.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
The Design of an Electronic Bicycle Monitor (EBM) Team P118: Gary Berglund Andrew Gardner Emrys Maier Ammar Mohammad.
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Scott Russell Sponsor: Nigel Thompson.
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
ECEN 4610 Capstone University of Colorado Boulder, CO January 29, 2009 School of Rock PDR Cheyenne Aberle Drew Veldhuizen Swain Brooks Dan Reed.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
The Surveyor By: Randy Direen, David Cox, Ali Abali, Leonardo Carrasco, Lisa Prince Preliminary Design Review January 25, 2005.
BATCH MEMBERS R.ABHISHEK-08N41A0401 K.DHEERAJ REDDY-08N41A0412 S.RAJENDRA REDDY-08N41A0458 JYOTHISHMATHI COLLEGE OF ENGINEERING AND TECHNOLOGY,TURKAPALLY.
RF Range detection and alert system team 26
Presentation transcript:

Loran-C Receiver Team Deathstar: Christopher Birschbach Matthew Hayman Matthew Anderson Christina Corner Erin Mowbray October 5, 2004 ECEN 4610 Capstone CDR

Agenda Budget Budget System Diagram System Diagram Subsystem Functionality Subsystem Functionality –Hardware/Schematics –Parts List –Software Design Progress since PDR Progress since PDR Future Goals and Deadlines Future Goals and Deadlines –Milestone 1 –Milestone 2 –Expo Division of Labor Division of Labor Questions/Comments Questions/Comments

Budget ItemDescription Estimated Price Processor$ LCD Display $75.00 Additional memory $50.00 A to D converter $50.00 Antenna Assembly $ Receiver Enclosure $ Printed Circuit Board $ FPGA Xilinx FPGA Evaluation Kit $ Filters 3 Butterworth (8th order) 3 Butterworth (8th order)$75.00 RS-232 Interface $25.00 Support Electronics Resistors, Caps, switches, sockets, cables $ Power Supply $ Student Designed User Manual Weighted Paper, Binding, Printing Costs $ Final Project Display Printed Poster for Engineering Expo $ Loran C User Handbook $25.00 Misc. (Ink Cartridges, Repair parts, reference manuals) $ TOTAL:$1,750.00

Block Diagram

Outline of Approach The system will consist of the following subsystems: The system will consist of the following subsystems: –Antenna Receiver –Analog-to-digital converter –Motorola 68HC11 processor –Memory –FPGA –Serial Interface –PC –Power

Antenna/Receiver AM Antenna 8th Order Butterworth Filter (MAX274B) (This portion of the project will continue when the filters from Maxim arrive.)

Signal Processing Unit Part List Parts ListPart Number Motorola Processor68HC11 FlashAT29C256 Bi-directional drivers74HC245 Latch74HC373 Schmitt trigger inverter74HC14 Xilinix FPGAXCS10 FPGA EPROMXC18V256 RAMHM V regulator78M33 5V regulator7805 A/D ConverterAD7828 RS-232 AdapterMAX233 TTL AND gate74LS08 8 MHz clockCO6050

Processor Schematic

FPGA Design Chip select Chip select State machine State machine Counter Counter

FPGA Schematic

FPGA – Chip Select

Software Design FPGA: FPGA: –Input Digital Loran-C signal Digital Loran-C signal –Output Counter Data Counter Data Processor: Processor: –Input Counter Data Counter Data –Output Time delays Time delays PC: PC: –Input Time delays Time delays –Output Latitudinal and Longitudinal coordinates Latitudinal and Longitudinal coordinates

Software Design Initial Test Code Initial Test Code

Software Design

Progress since PDR Schematic Design Schematic Design Initial Wire wrapped board completed Initial Wire wrapped board completed Basic Processor Functionality Basic Processor Functionality Basic FPGA Functionality Basic FPGA Functionality Basic RAM Functionality Basic RAM Functionality

Project Timeline

Future Deadlines Milestone 1 – 10/26 Milestone 1 – 10/26 Milestone 2 – 11/16 Milestone 2 – 11/16 Open-Lab Expo – 12/9 Open-Lab Expo – 12/9

Milestone 1 Date: October 26 th Date: October 26 th Parts completed: Parts completed: –Completed Wiring on Vector Board –Antenna/Filtering –Clean signal –Sampling by A/D converter completed –Order first PCB

Milestone 2 Date: November 16 th Date: November 16 th Parts Completed: Parts Completed: –Functioning PCB –State machine on FPGA working –Communication between the Processing Unit and Antenna/Receiver.

Capstone Expo Working Loran-C Receiver Working Loran-C Receiver –Functionality between all 3 Subsystems: Antenna/Receiver, Processing Unit, & PC –Working Serial Interface Interface

Extra Features These will be added if time permits at the end of the semester. These will be added if time permits at the end of the semester. –Portable Power Supply –LCD Display

Division of Labor Matt A Matt A –Power –Memory interface –Microprocessor Programming Chris B Chris B –PC programming –Microprocessor programming –User’s Manual Christy C Christy C –Antenna/Filtering –Verilog Design –User’s Manual Matt H Matt H –Antenna/Filtering –PCB –Microprocessor Programming –PC programming Erin M Erin M –Verilog Design –User’s Manual –PC interface

Questions/Comments