1 Access Network Services for Service ProvidersP1042 EURESCOM P1042 Access Network Services for Service Providers A brief overview of the results.

Slides:



Advertisements
Similar presentations
1 Introducing the Specifications of the Metro Ethernet Forum.
Advertisements

1 Introducing the Specifications of the Metro Ethernet Forum MEF 17 Service OAM Framework and Requirements February 2008.
Study: Trustmarks Provision in Europe Luca Alessandro Remotti Intrasoft International.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
WORKSHOP ON SATELLITES IN IP & MULTIMEDIA Geneva, 9-11 December 2002 Contribution of Mr. Ahmed Toumi Director General & CEO International Telecommunications.
Ch. 10 Circuit Switching and Packet Switching
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Planning, optimization and regulatory issues
Slide 1 Access to Bandwidth: Proposals for Action Ilsa Godlovitch Regulatory Policy Directorate
LLU and Broadband Regulation in France July 2005 Autorité de Régulation des Communications Electroniques et des Postes.
LOCAL LOOP UNBUNDLING IN HUNGARY Local Loop Conference, 5th July 2005, Bucharest Sandor Szilágyi National Communications Authority, Budapest.
Thank you.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
Data Communications Circuit Switching. Switching Networks Long distance transmission is typically done over a network of switched nodes Nodes not concerned.
EE 4272Spring, 2003 Chapter 9: Circuit Switching Switching Networks Circuit-Switching Networks Circuit-Switching Concept  Space-Division Switching  Time-Division.
1 © 2004, Cisco Systems, Inc. All rights reserved. WAN Technologies Based on CCNA 4 v3.1 Slides Compiled & modified by C. Pham.
-1- Entrance of Cable TV Service Provider into Broadband Internet Service Market : Service Bundling and Role of Access Charge By Jae-Hyeon Ahn, Jungsuk.
Business Data Communications & Networking
Amount and cost of losses June 11 th Florence School of Regulation Jose Luis Mata.
Inter-Operator TMN & OSS Workshop Prague, March Technical Development and Support for European ATM Service Introduction John Boyles, PL.
Development of BB markets Access markets (M4 & M5) and remedies applied Linda Paršova 10 TH BALTIC ELECTRONIC COMMUNICATIONS AND POSTAL SERVICES REGULATORS’
1 Introducing the Specifications of the Metro Ethernet Forum.
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
Route Planning and Evaluation
1 Wide Area Network. 2 What is a WAN? A wide area network (WAN ) is a data communications network that covers a relatively broad geographic area and that.
Regional GDP Workshop. Purpose of the Project October Regional GDP Workshop Regional GDP Scope Annual Current price (nominal) GDP By region.
TRIBAN Workshop Bern, November 1998 Access network evolution: the European perspective Umberto Ferrero CSELT P614 Project Leader.
Turkish Power System Overview March 2012
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
Policy Committee Meeting Fiscal Year 2004 Budget Considerations: Dark Fiber November 13, 2002.
Property of TERA Consultants CONSULTANTS T E R A IDATE– Workshop Lessons from Tunis (22 November 2005) TERA Consultants 32 rue des Jeûneurs PARIS.
The Public Network Chapter 4. Objectives In this chapter, you will learn to: Explain, in general terms, the structure of the public telephone network.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
Liberalization of Telecommunications in Europe Pál Belényesi 27 October 2006 Verona.
SAM for Virtualizatio n Presenter Name. Virtualization: a key priority for business decision makers Technavio forecasts that the global virtualization.
LLU Update Elizabeth Wilks-Wood Compliance Directorate.
COMP514 – ADSL.
William Stallings Data and Computer Communications Chapter 9 Circuit Switching.
Local Loop Unbundling PRESENTATION TO THE PORTFOLIO COMMITTEE 6 th JUNE 2007.
Monitoring and Measurement System in EuQoS project dr Andrzej Beben Telecommunication Network Technology Group Warsaw University.
Internet Policy Day 3 - Workshop Session No. 5 The impact of telecomms regulation Prepared for CTO by Link Centre, Witwatersrand University, South Africa.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Services in a Converged WAN Accessing the WAN – Chapter 1.
GSM – formerly: Groupe Spéciale Mobile (founded 1982) – now: Global System for Mobile Communication – Pan-European standard (ETSI, European Telecommunications.
What Is ISDN?.
ETP European Telecommunications Platform Presented by: Ernst Weiss Former Chairman ETP E T P.
Slide 1 Access to Bandwidth The Way Forward Peter Walker Director, Technology OFTEL
A CADEMY OF T ELECOM M ANAGEMENT Center for Tele-Information ATM Knowledge Series Telecom Infrastructure & the Digital Divide: a European Perspective by.
Chapter 12 The Network Development Life Cycle
OPF FOCUS GROUP The Provision of Co-location Facilities and Process Greg Mook 1 September 1999 OPF Co-location Focus Group.
21 June 2011 NGA Network Principles & Planning Tom Fulford-Brown, Business Development Manager, Geo.
Access To Bandwidth Option 2 Product Definition Discussion Discussion is without prejudice to BT’s position with respect to Option 2.
1 OVERVIEW OF TISP WORK: Analysis of Policies and Regulations Carrier Selection and Pre-selection Indicators of the Assessment of Telecommunications.
Telecom Unclassified Fault Prioritisation Telecom, Auckland 30 th October 2007 Telecom Wholesale Industry Consultation Seminar.
 Introduction to Wide Area Networks 2 nd semester
Local loop Unbundling Dr. ZOUAKIA Rochdi ANRT. Presentation outline Definition of Unbundling local loop (LLU) Importance of LLU Types of LLU : Description.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Defining ONAP APIs With BSS/OSS
Liberalisation and regulation in the telecommunication sector: Theory and empirical evidence Week 3 The European Regulatory Framework for the Telecommunication.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Sub-Loop Extension Service (SLES)
Independent Telecommunications Consultant
Wide Area Network.
William Stallings Data and Computer Communications
KCOM HEY Wholesale FibreLine Services
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
INSPIRE Maintenance and Implementation expert Group
Integration of Variable Generation Task Force (IVGTF): Status
Good Morning 1/17/2019.
SOUTH AFRICAN INSURANCE ASSOCIATION
ONAP Architecture Principle Review
Presentation transcript:

1 Access Network Services for Service ProvidersP1042 EURESCOM P1042 Access Network Services for Service Providers A brief overview of the results

2 P1042Access Network Services for Service Providers The Problem Regulations for local loop unbundling ETP Standards bodies National Regulators EU Access Network Service Providers IMPACTS !!

3 P1042Access Network Services for Service Providers The scope of the Study Network Solutions overview Analysis of UALL products Business Models for UALL Role of the ULL Group within ETP Impact of UALL on OSS OAM processes concerning UALL Economic Issues Full unbundling Shared access High speed bitstream access UALL Unbundled Access to the Local Loop ETPEuropean telecommunication Platform OSSOperations Support Systems Deliverables 1 and 2

4 P1042Access Network Services for Service Providers The Findings Network Solutions UALL products Business Models for UALL The ULL Group within ETP OSS related issues OAM processes related issues Economic issues and costing principles Recommendations to EURESCOM shareholders Recommendations for further study

5 P1042Access Network Services for Service Providers Network Solutions Option 1: Full unbundled Local Loop EU Unbundled Local Loop New local loop to provide high speed xDSL Access

6 P1042Access Network Services for Service Providers Network Solutions Option 2: Shared Local Access to the Local Loop Shared Access use of 'Splitter'

7 P1042Access Network Services for Service Providers Network Solutions Option 3: High-speed bit stream access

8 P1042Access Network Services for Service Providers UALL Components

9 P1042Access Network Services for Service Providers UALL products Circuit provisioning related Metallic Path Facility (MPF) Share Access (High Frequency Path) using Splitter(SPT) Tie Cable Connecting Service - MDF Side (TI-CON-MDF) Tie Cable Connecting Service - HDF Side (TI-CON-HDF) Bitstream Service Plan and Build related Local Access Provider Exchange Area Data (EAD) LAC(OLO) Collocation Facility Plan & Build (OLO-ERM) Hand-over Distribution Frame (HDF) Internal Tie Cable (TIE-I), External Tie Cable (TIE-E) Local Access Provider Egress (Backhaul) Set-up Service (APE) Local Access Provider– Digital Private Circuit OLO Operator External Tie Cable Pull Through Service (PTS) Capacity forecast and reservation Service (CAPFOR) Addition to xDSL Terminal Recommended Equipment List (ATREL) Operational Site Visit Local Access Provider Line Characteristic Estimate (LCDE) Spectrum Plan Policing & Enforcement (SPECTRUM) Line test - In service (LT-IS)

10 P1042Access Network Services for Service Providers Business Models for UALL

11 P1042Access Network Services for Service Providers The ULL Group within ETP Phase I finalised in June 2000 Focus: Full unbundling (Splitters & Bit stream not addressed) Collocation Industry best practise Industry policy recommendation (www. etp-online.org)

12 P1042Access Network Services for Service Providers OSS related issues Role based Business Model Processes between roles Role of Cable Manager is important

13 P1042Access Network Services for Service Providers OAM processes related issues Process Lifecycle: Provisioning processes are complex Flow diagrams in annexes to Deliverable 1 Automation essential (practical & cost driven) E-commerce technologies recommended

14 P1042Access Network Services for Service Providers Economic issues and costing principles Economic issues: Making Access a business in it own right ? Separation of Access into a business / trading division ? The role of automated OSS interfaces Alternative technologies for access to bandwidth and the demand for ULL ? The future of ULL…? Costing principles: Cost accounting methodologies and charging principles LLU specific set up and running costs Allocating costs and definition of different unbundling charges Rational for assigning costs to Connection and/or Rental charges Fault and repair costs/prices Geographical average

15 P1042Access Network Services for Service Providers Recommendations to EURESCOM shareholders Introduction of the EU requirements for unbundled access to the Local Loop has significant business impacts Structuring the access as its own business is possible Alternative access technologies for bandwidth exist but only few of them are capable of decreasing the importance and the demand for ULL in the short run The ULL cost principles assumptions have considerable variation across Europe Historical cost models unlikely to be applicable in ULL The ULL impacts to OSS are substantial Considerable cost savings possible with automated transaction tools

16 P1042Access Network Services for Service Providers Recommendations for further study Define ULL processes in more detail Define automated OSS interfaces for ULL services Define XML e-commerce interfaces support for both B2B and e-commerce Hub models Work with ETSI More substantial economic cost modelling of ULL Review the P614 and P901 studies to take account of the significant development and set-up costs of OSS for ULL