A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.

Slides:



Advertisements
Similar presentations
1 WHY WE NEED AN ICAP MARKET IN NEW ENGLAND Presentation By: Dr. Richard A. Rosen Tellus Institute Boston, MA To: Massachusetts Electric Restructuring.
Advertisements

ENERGY MARKET REFORM: Gas Transportation & Distribution Issues Presentation to GTE 2 nd Annual Conference by Gerald Doucet Secretary General, World Energy.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Fundamentals of Markets © 2011 D. Kirschen and the University of Washington 1.
1 MondayTuesdayWednesdayThursdayFriday January February March April May
© 2011 D. Kirschen and the University of Washington 1 Participating in Electricity Markets.
Robert G. Ethier, Ph.D. Director, Market Monitoring May 4, 2005 ISO New England State of the Market Report 2004.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Congestion Pricing: Competitive Locational Prices of Power Stoft (2002)
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
November 2001 CHRISTENSENASSOCIATES RTP as a Demand Response Program – How Much Load Response Can You Expect? Peak Load Management Alliance Fall Conference.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Time-Varying Retail Electricity Prices: Theory and Practice by Severin Borenstein.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Comments on “A Capacity Market that Makes Sense” James Bushnell University of California Energy Institute.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
California Electricity Opportunity turned into Risk Risk turned into Challenge Challenge turned into Crisis Crisis turned into Blight.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Supply Decisions.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
Types of Market Structure in the Construction Industry
Market design and market power in wholesale electricy markets Guido Cervigni IEFE-Bocconi University, Milan CEEM – Summer School on Economics of electricity.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
The Marketplace: Supply. Review What is a Market? What things must a government provide for a market to work? Why?
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
1 Colombia Capacity Auction Peter Cramton (with many ideas from Steven Stoft) 9 June 2006.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
WHY CAPACITY OBLIGATIONS AND CAPACITY MARKETS? Paul L. Joskow June 3, 2005.
Power System Economics Daniel Kirschen. Money © 2012 D. Kirschen & University of Washington1.
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Structuring Electricity Markets Lester B. Lave Electricity Industry Center Carnegie Mellon University January 10, 2008.
Chapter 15 McGraw-Hill/IrwinCopyright © 2010 The McGraw-Hill Companies, Inc. All rights reserved.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
1March 24, 2000California PX Demand Responsiveness Workshop Christensen Associates Lessons from California The Role of Demand Response Energy Markets in.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
Chapter 6 Prices as Signals. Reaching Equilibrium The point where supply and demand come together is called the equilibrium It is the point of balance.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
By: Serenity Hughes ECONOMICS 101.  The markets for many important products are dominated by a small number of very large firms. IMPERFECT COMPETITION.
Capital. Chapter Outline ©2015 McGraw-Hill Education. All Rights Reserved. 2 Financial Capital And Real Capital The Demand For Real Capital The Relationship.
Chapter 6 Prices and Decision Making
Prices and Decision Making. Price The monetary value of a product as established by supply and demand Signals: –High prices: producers to produce more.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
Electricity Market Game Review 13ELP044&644 CREST, Loughborough University.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
CAPITAL McGraw-Hill/Irwin
Flexible Forward Contracts for Renewable Energy Generators
Rate-of-Return Regulation
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Generation Expansion Daniel Kirschen
Long-term Capacity Market
Long-Run Outcomes in Perfect Competition
Locational ICAP in New England
Why the Electricity Markets Do Not Work
Firms in Competitive Markets
ECONOMICS : CHAPTER 5-- SUPPLY
Planning Reserve Margin
Presentation transcript:

A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005

Why a capacity market at all?

3 Other industries don’t have one Quantity Supply Demand Price Inframarginal rent P* Short run Long run E(Rent) = Fixed cost

4 Why capacity market at all? Market failure –Absence of demand response –Supplier market power especially in load pockets Regulatory response –Prices are capped at $1000/MWh ($250 in California) –Supply offers are “mitigated” if much over MC (PJM: MC + 10% in load pockets) Result –Generators cannot cover FC from energy revenues

5 Traditional ICAP Market Quantity True supply Demand Price = $0 Competitive price

6 Traditional ICAP Market Quantity True supply Demand $999 Bid supply Price = $0 Competitive price Profit from exercise of market power

7 Traditional ICAP Market Pays based on “availability” Available if you say you are, and there is no compelling evidence otherwise Result –“Dog” plant gets large capacity payment Slow start Extremely high marginal cost Never called (even in crisis) Always appears available Does not contribute to reliability

8 VOLL pricing: administrative price spike Price Quantity Carrying costs paid by –Infra-marginal rents –Price spikes when short Big enough price spikes  reliability Infra-marginal + spikes  right generation mix Problems –$15,000 price spikes due to weather / outages too risky –Spike payments too sensitive to over/under capacity –Too tempting for the exercise of market power Base Shoulder Variable Cost Infra-marginal rents Peakers: old / new

9 A Better Solution: Replace price spikes with LICAP Eliminate the bad aspects of price spikes Retain the good aspects

10 Price Capacity Replace price spike with LICAP Price-Spike Revenue Curves Note extreme sensitivity to capacity level Weather / outage risk, year-to-year fluctuation 2  EBCC EBCC Target Capacity EBCC = expected benchmark carrying cost (annualized fixed cost of frame unit) LICAP Demand Curve

11 Four essential features Eliminate market power in LICAP market Eliminate incentive to create real-time shortages Reward the reliable Calibrate demand curve for desired reliability

12 Price Capacity Demand Clearing Price 1. Eliminate market power in LICAP market Supply offered Criterion Target Actual EBCC 2  EBCC LICAP market clearing Suppliers bid as they wish Clearing price determined by actual capacity EBCC = expected benchmark carrying cost (annualized fixed cost of frame unit)

13 2. Avoid incentive for real-time shortages LICAP payment = LICAP Price – “Peak Energy Rent” “Peak Energy Rent” = actual inframarginal energy rents of efficient benchmark peaker –No incentive for supply to create real-time shortages –Avoids controversy of estimating energy rents –Reduced risk for suppliers and load –Prevents supply from using threat of shortages to negotiate more favorable long-term contracts –Removes administrative shortage price from efficient long-term contracts

14 3. Reward the reliable Availability means “during shortage hours” If 90% available during shortages, get 90% of full LICAP price –Shortage hours = insufficient operating reserves –Available = providing energy or reserves in shortage hours Slow-start offline resources are deemed “unavailable,” because these resources could not capture price spike Prevents high-cost inflexible resources from collecting LICAP Load should not pay for “capacity” that cannot produce during a shortage—that capacity does not contribute to reliability Availability smoothed to reduce risk

15 4. Calibrate for desired reliability

16 Conclusion: It makes sense Economic LICAP has these advantages: –Addresses market power (spot energy and LICAP) –Reduces profit risk  lower cost –Incentive for efficient generation mix

17