European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Ongoing & Planned BDS work Deepa Angal-Kalinin ASTeC Daresbury Laboratory (CCLRC)
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows LCUK Meeting, Oxford 29/01/04 UK LC-ABD Collaboration UK Beam Delivery System Plans Philip Burrows Queen Mary, University of London.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
2 nd EuroTeV Scientific Workshop, Orsay 16 th May 2006 WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, CCLRC Daresbury Laboratory.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
2 nd EuroTeV Annual Meeting, Daresbury 9 th January 2007 WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, CCLRC Daresbury Laboratory.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Introdcution to Workpackage/Activity Reflection D. Schulte.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
Freddy Poirier ILC project Meeting Integrated Luminosity Performance Study on the ILC – WP6 (A snapshot of the European LC workshop at Daresbury) Freddy.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
ESGARD OMIA Sept EUROdrive and LED Motivation Work Packages Partners & resources.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
Thomas Schoerner-Sadenius DESY Hamburg, Germany
What Should We Do?.
CLIC Study Aim Conceptual design report in 2010
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
CLIC-ILC BDS & MDI work.
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CLIC damping rings working plan towards the CDR
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory

D. Angal-KalininEUROTeV Kickoff Meeting, DESY WP2 : Beam Delivery System Overall Goals The work package aims to contribute to the Beam Delivery System design challenges of the ILC. Decision on BDIR configuration for the ILC will decide critical design choices. The work will be done in close collaboration with ILPS and DIAG work packages to reach the luminosity performance goal. The regional groups will work together to provide the required designs, prototypes & beam tests to decide the design choices. Expertise from other regions and their participation will need some flexibility in this work package.

D. Angal-KalininEUROTeV Kickoff Meeting, DESY Beam Delivery System IP LINAC GeV Collimation Final Focus Extraction IP

D. Angal-KalininEUROTeV Kickoff Meeting, DESY EUROTeV WP2 : BDS Overview WP2 : BDS BDSLDCRABRFFFBKSWMDSCFD Tasks cover critical design choices for the BDS BDS Lattice Design Crab cavity RF system Design Fast Feedback System Design Spoiler Wakefields & Mechanical Design Super- conducting Final Doublet R&D CCLRC CEA CERN CCLRC ULANC QMUL CCLRC CCLRC CERN TEMF UMAN ULANC CEA

D. Angal-KalininEUROTeV Kickoff Meeting, DESY BDSLD – BDS Lattice Design Contact person : D.Angal-Kalinin (CCLRC) ILC BDS lattice will evolve after BDIR configuration will be decided. Earlier experience on NLC/JLC, TESLA & CLIC BDS designs will help to design the new BDS layout in best possible way. Complete lattice design for chosen BDIR configuration for two IRs Impact of lattice design on collimation efficiency Extraction scheme (head-on or small crossing angle) Design of extraction lines for both IRs Exploration of potential non-linear collimation system Deliverables BDS lattice designs with two IRs. Extraction line designs for two IRs and Fast extraction line Close collaboration with ILPS and DIAG workpackages.

D. Angal-KalininEUROTeV Kickoff Meeting, DESY CRABRF – Crab Cavity RF System Design Task contact person : A. Dexter (ULANC) Atleast one IR will need crab cavity: Details after deciding the BDIR model. Specifications, phase stability for electronics, prototypes, beam tests? Parameters of crab cavities Design of crab cavities Low power validation tests on a prototype cavity RF system model for phase stability performance Klystron design and performance studies Design of high power prototype Deliverables Prototypes of crab cavities (Dec’05, Sep’06) Low Power RF source (June’06) Phase control system (June’06) Phase testing of crab cavities (April’07) Final report on SC crab cavity system (Dec’07)

D. Angal-KalininEUROTeV Kickoff Meeting, DESY FFBK – Fast Feedback System Design Task contact person : P.Burrows (QMUL) Digital feedback systems for the long SCRF bunch train. Sensitivity to backgrounds, EMI, radiation damage. Feedback is critical for delivering luminosity  must be robust! Design & fabrication of BPMs, kickers and amplifiers for nm-level IP feedback Experimental set up in the beamline for stabilisation of long bunch train Design and development of intra-train beam-beam deflection system Deliverables Prototypes of BPMs and kickers for nanometer level feedback and their tests (Dec’05) Experimental verification of feedback (June’06) Prototype of intra-train beam-beam deflection scan system (Sep’07)

D. Angal-KalininEUROTeV Kickoff Meeting, DESY SWMD – Spoiler Wakefields and Mechanical Design Task contact person : N. Watson (CCLRC/Birmingham ) Simulation code to correctly simulate geometric/resistive wake fields of spoilers, spoiler designs, material damage, validation of simulations against measurements. Specifications of spoilers Material Damage studies Cold test measurements set up Fabrication of spoiler prototypes Development of wake field simulation codes Spoiler beam tests at SLAC test facility Deliverables Cold test prototype (Dec’06) ECHO: 3-D wakefield package (Dec’07) Optimal spoiler design (Dec’07)

D. Angal-KalininEUROTeV Kickoff Meeting, DESY SCFD – Super conducting Final Doublet Task contact person :O.Napoly (CEA) High gradient superconducting quadrupoles for final focus – performance, mechanical stability and effect of external field of 2T parallel to its axis. SC final doublet test station Solenoid installation Experiment of high-field s/c quadrupole in a 2T external solenoid Deliverable Demonstration of feasibility for LC final doublet (June’06)

D. Angal-KalininEUROTeV Kickoff Meeting, DESY BDS Manpower InstitutePerson Months CCLRC242 CEA69 CERN34.8 QMUL72 TEMF/TU72 ULANC130 UMAN42 Total (EU requested 179.4)

D. Angal-KalininEUROTeV Kickoff Meeting, DESY Time Schedule First lattice design decks will be available within months. The time line for this task will need to fit within the ILC CDR time line. The prototypes of crab cavity and RF system : First version of report : after 24 months. IP feedback, final phase nm-level feedback performance analysis : after 30 months. Report specifying spoiler requirements : 15 months & Optimised spoiler design report : after 36 months ECHO-3D for ILPS WP available after 30 months. Final Superconducting doublet recommendations : available after 17 months.

D. Angal-KalininEUROTeV Kickoff Meeting, DESY Beam Delivery System – Global contest Discussion on the critical CDR choices in ILC BDIR WP: Crossing angle (IR1/IR2) L* (IR1/IR2) Final doublet technology (IR1/IR2) Collimation choices (IR1/IR2) Beam stabilisation Issues Instrumentation choices Machine Protection Issues Positron source/Undulator location Risk Mitigation Detector layout Detector VXD inner radius (IR1/IR2) EUROTeV- BDS & other WPs cover most of these topics. Exact contribution will depend upon the international global effort. EUROTeV will contribute to the design choices for BDS for the ILC within international collaborations.

D. Angal-KalininEUROTeV Kickoff Meeting, DESY The work package aims to participate in the global design effort for the ILC. Main contributions to the ILC will include : BDS lattice design Spoiler designs - simulations, cold and beam tests Crab cavity RF design and prototypes Fast IP feedback – BPMs, kickers prototypes, beam tests Demonstration of super conducting final doublet Participants of this WP will: Participate in the global discussion to decide the new BDIR configuration for the ILC. Provide prototypes with beam tests for some of the critical components. Coordinate EUROTeV BDS activities in an international collaboration. Summary