Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.

Slides:



Advertisements
Similar presentations
Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
Advertisements

Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Recent Result of TOF Monitor System Qian LIU. Outline  Ref-PMT  Barrel TOF  End cap TOF.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
TOF monitor system Qian LIU. Outline TOF Monitor system introduction (briefly) Arithmetic of TOF Monitor system analysis program How to run the program.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
Surface Area Nets & Rectangular Prisms. Rectangular Prisms Made of 6 sides Top & Bottom Front & Back Left & Right.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
Recent results Marc & Qian. Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Welcome to MM305 Unit 6 Seminar Larry Musolino
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Rev Server blade enclosure overview Power backplane Signal backplane Management module Reset Bottom.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Plans for this week MWPC: wire stretching today
Ultracorr® Installation Process
DCS: Temperature Probes
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
DCS: Temperature Probes
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
IFR detector mechanics
Maki KUROSAWA VTX Group 2014 Feb 20
Han Jifeng BESIII MUON GROUP IHEP, CAS
TTC Fiber Distribution
Presentation transcript:

Recently Report LIU Qian

Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move the moon box at all. If we want to do the alignment, we’d better not to move the moon box too.

The coiled tube is tied on the rack Since the coiled tube is fat and strong, we leave this half to protect the fibers. Soft tape is used to protect the fibers Marc: We’ve received 6 C-clamps. They’ve been put on.

MTP connecters are all connected (east side) Upper box Bottom box

Distribution box (west) are installed We didn’t connect the west bundles to distribution box yet. (Will be done in this week) West upper box

EC TOF fibers are all installed Sorry I didn’t take a camera when we finished the EC TOF installation. I’ll show the picture tomorrow. Yesterday all 48 EC TOF and fibers are all installed. The fiber is installed when the TOF is been installing. The extra-length of fibers will be “over-under-coiled” when they remove this support It is said they’ll move the east EC to barrel tomorrow, then they’ll remove the support.

The USTC DAQ situation 1.Yesterday they connected all signal cables. 2. Today they are doing the self test, but not finished yet. 3. They’ve installed the monitor board which can control our UH module and moon box. Tomorrow they’ll check their low- voltage and high-voltage first, then try to pulse the laser and read out the signal.

Next step Connect all fibers except the west endcap fibers. (West endcap is not finished yet) Find out why the Q resolution is so large using the USTC DAQ. (We’ve discussed this with USTC people, they said they’ve tried to read a stable signal, the resolution is good.) Analysis the data.

Thanks! LIU Qian