FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Fabric Prepreg Material Control Industry Review.

Slides:



Advertisements
Similar presentations
BOS Supplier Mangement
Advertisements

Overview of Portfolio Optimization By Tim Washington September 14 th, 2011.
Integrating CMC Review & Inspection Industry Recommendations Joe Anisko April 24, 2003.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
The statements contained herein are based on good faith assumptions and provided for general information purposes only. These statements do not constitute.
AT- FAA / NASA WORKSHOP ON KEY CHARACTERISTICS FOR COMPOSITE MATERIAL CONTROL Cirrus Design Industry Review August 6 th, /02.
Mary PacherFAA Workshop – Chicago September 16-18, 2003 Comments: Liquid Resin Molding Specifications Guidelines clearly indicate the critical importance.
FAA Workshop on Key Characteristics for Advanced Material Control
FAA Workshop on Key Characteristics for Composite Material Control
Fundamentals of Information Systems, Second Edition
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
Iterative development and The Unified process
Welcome to Travel Incorporated’s Concur ‘Experienced User’ Webinar.
Production Systems Chapter 9.
FAA/NASA Workshop on Key Characteristic's for Composite Material Control Chicago, IL Cytec Engineered Materials August 6th 2002.
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
Supply Chain Management
Project Plan Development
Federal Aviation Administration General Aviation’s Technology Transition Presented to: SETP Flight Test Workshop By: FAA Small Airplane Directorate Lowell.
Chapter 19 OPERATIONS AND VALUE CHAIN MANAGEMENT © 2003 Pearson Education Canada Inc.19.1.
Enterprise Architecture
Welcome ISO9001:2000 Foundation Workshop.
Strategic Initiatives for Implementing Competitive Advantage Great products—Innovative products Doesn’t matter---Bad processes—no perceived value 1) You.
Getting Smarter with Information An Information Agenda Approach
ISO 9001:2015 Revision overview - General users
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
CONSTRUCTION & THE FOOD INDUSTRY The Insurance Industry View Steve Exwood & Jon Miller.
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
Achieving and Demonstrating “Quality-by-Design” with Respect to Drug Release/dissolution Performance for Conventional or Immediate Release Solid Oral Dosage.
Software Project Management
Opportunities in Food Production “Success is 20% skill 80% concentrated power of will” – Mike Shinoda.
GWS SMS INTRODUCTION MSM Manual. 3. MISSION STATEMENT AND CORE VALUES OF THE COMPANY  MISSION  Our Mission is to provide expertise in the fields of.
Business Area Update APNIC 27 Manila, Philippines Richard Brown.
Strategic Planning Strategic planning follows "the five question logic” ("Who are we? Where are we now? Where do we want to be? How do we get there? How.
Basic Impact Evaluation Course Poverty Analysis Initiative (C102) Poverty Analysis Initiative (C102) World Bank Institute Attacking Poverty Program.
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Supply Chain Performance COSC 643 Sungchul Hong. Competitive and Supply Chain Strategies A company’s competitive strategy defines the set of customer.
Some Thoughts on Shared Databases Stephen Ward SW Composites Taos, NM.
BSCCo Business Strategy 2013/14: Timetable and Process Victoria Moxham.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
New DFE Statutory Guidance and OFSTED Changes statutory-guidancewww.education.gov.uk/aboutdfe/statutory/g /sure-start-
Introducing Project Management Update December 2011.
Challenge Questions How good is our delivery of key processes?
Identifying and recruiting patients for clinical trials in the future: a pharma perspective Rob Thwaites EC/EFPIA Workshop on ” Primary and secondary use.
Final Writing Project Imaginative Story. Grading Rubric Focus and Coherence – 1 Focus (storyline) is unclear or weak. The story is not logical and the.
1 DATABASE TECHNOLOGIES (Part 2) BUS Abdou Illia, Fall 2015 (September 9, 2015)
30 SECOND RULE Clear your mind of all distractions. Focus on your flight. Remember at least one thing you learned at the safety seminar.
CUSTOM FABRICATORS INC. Presentation By, Aparna Asha V Deepthi J Sridhar P.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
CUSTOM FABRICATORS.INC CASE PRESENTATION By Radha Shalini Srikanth Vanaja.
Chapter 3 – The Process Approach 1 Process Approach Auditing 28-Oct-2009 VARIATION RISK PERFORMANCE WASTE PROCESS MEASUREMENT AND OBJECTIVE DEPLOYMENT.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
Food and Beverage Operational Controls
ISO Certification Consultancy Information regarding various International management systems and certification consultancy offered by Punyam Management.
QUALITY ASSURANCE.
Strategic Initiatives for Implementing Competitive Advantage
Presentation to TRAN Committee
VeNí Service-focused Approach
Automating Profitable Growth™
Projects, Assignments, and other Assessments
American National Standards Institute
Define Your IT Strategy
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Federal Aviation Administration General Aviation’s Technology Transition Presented to: SETP Flight Test Workshop By: FAA Small Airplane Directorate Lowell.
Presentation transcript:

FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Fabric Prepreg Material Control Industry Review

FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Cirrus Priorities Increase Customer Value Increase Quality Reduce Cost Continually Enhancing Customer Value Remains Cirrus’ Primary Focus If we can deliver the highest quality aircraft available in class, at reasonable cost, incorporating best available safety technology, we will change the entire GA industry.

FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Material Control Process - Effect on Cirrus Priorities and Goals? Fabricating 2 Ship Sets Per Day Requires: Smooth process with low variability. Robust process  high quality parts produced efficiently. Junk in  junk out. Manufacturing Impact Composite Part Fabrication is a Cirrus Core Technology. Material Control is Critical to Reaching Company Goals. New Product Development Impact Effective Product Development Requires: 1.Mature certification process – clear understanding of requirements. 2.Logical, low risk, and timely material testing and approval.

FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Positive Aspects Overall, the guidelines and detailed definitions are welcomed. Fulfills the purpose of a “standard”. Sets equal expectations and high standards for all parties involved. Believe industry standard and continuous database monitoring will help improve quality, lower variability.

FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Problem Areas / Concerns Current system leaves end-user trying to put together a puzzle without all the pieces  Want to ensure that transfers of responsibility provide a cohesive path of material control from raw materials to final product. Concerns: 1) Increased material cost. 2) Increased level of support required in all areas. 3) Material delays due to testing. 4) Lengthened certification process.