five FAST minutes … Why FAST? How FAST? measure the muon lifetime   to a precision of 1 ppm (~ 2 ps) measure the Fermi coupling constant G F to a precision.

Slides:



Advertisements
Similar presentations
Status Report of the measurement of G E n via 3 He(e,e´ n) Robert J. Feuerbach The College of William and Mary for the E Collaboration.
Advertisements

Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Investigations of Semileptonic Kaon Decays at the NA48 Еxperiment Milena Dyulendarova (University of Sofia “St. Kliment Ohridski”) for NA48 Collaboration.
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Discussion on cosmogenic taggers With some thinking by : M.Weber, F.Pietropaolo, A.Guglielmi, M.Ne.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
2 July 2004Journée DPNC 2004 FAST: A precision measurement of muon lifetime. Chiara Casella FAST collaboration: A.Barczyk (1), J. Berdugo (2), J. Casaus.
Simulated real beam into simulated MICE1 Mark Rayner CM26.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
14 September 2007 Journée de réflexion du DPNC Chiara Casella Precise measurement of the muon lifetime with the FAST experiment: First results.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
David M. Webber University of Illinois at Urbana-Champaign For the MuLan Collaboration A new determination of the positive muon lifetime to part per million.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
Trigger rate studying Shiuan-Hal,Shiu. Introduction  Because the DAQ data taking rate only have 1000Hz, we must confirm the trigger rate will not higher.
ECAL PID1 Particle identification in ECAL Yuri Kharlov, Alexander Artamonov IHEP, Protvino CBM collaboration meeting
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
Performance of PHENIX High Momentum Muon Trigger.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
ESS Timing System Prototype 2012 Miha Reščič, ICS
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
External Trigger System PAB To provide straight muon track efficient selection for TPC performance characterization Adjustable geometry for.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
M. Martemianov, ITEP, October 2003 Analysis of ratio BR(K     0 )/BR(K    ) M. Martemianov V. Kulikov Motivation Selection and cuts Trigger efficiency.
LAV L0 trigger primitives Mauro Raggi, Francesco Gonnella TDAQ Working Group.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
Kevin Lynch MuLan Collaboration Boston University CIPANP 2006 A new precision determination of the muon lifetime Berkeley, Boston, Illinois, ITU, James.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
S.Movchan Straw prototype beam test into the NA48 infrastructure
MDT and analog FEE mass production:
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
Status of the Beam Phase and Intensity Monitor for LHCb
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
Analysis of FADC single-crystal data
K. Sedlak, A. Stoykov, R. Scheuermann
FAST: A precision measurement (1ppm) of muon lifetime tm and GF
DESY drift chambers efficiency and track reconstruction
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
Presentation transcript:

five FAST minutes …

Why FAST? How FAST? measure the muon lifetime   to a precision of 1 ppm (~ 2 ps) measure the Fermi coupling constant G F to a precision of 1 ppm one order of magnitude improvement of the present world average ++ DC pion beam p = 170 MeV/c Active scintillator target Hight granularity  +   +  e +  +   + (   = ns - PDG2002)  +  e + (   =  s - PDG2002) 1 ppm precision events x 9  / 0.5 ~ 1.5 y PARALLELISATION NEEDED HIGH DATA RATE (1MHz beam rate) ~ 80 MB/sec ONLINE ANALYSIS estimated efficiency

FAST target: the story …

FAST target: the end of the story !

P S I

PSI – 15 December 2003 phomultipliers preamps discriminators ventilators tdcs back view

time resolution with straight tracks ~ 1 ns time distribution RF frequency ~ 20 ns

ANY serious analysis on these data … … … but it really looks like a lifetime plot !!!

FUTURE PLANS : 1. DECEMBER 2003: trigger prototype (from CIEMAT – Madrid) Implement Test Take some data : first real data taking run (from April on) BUON NATALE e BUON ANNO !!!!