Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.

Slides:



Advertisements
Similar presentations
Advanced Information Systems Development (SD3043)
Advertisements

Spare Parts Inventory at NSCL Reliability and Availability WAO 2012, Stanford University Jon Bonofiglio August, 9 th, 2012.
Accel Computerized Maintenance Management System.
Total Productive Maintenance
Software Quality Assurance Plan
Radiopharmaceutical Production
More CMM Part Two : Details.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
The ISO 9002 Quality Assurance Management System
INDUSTRIAL & SYSTEMS ENGINEERING
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition.
Course Technology Chapter 3: Project Integration Management.
Configuration Management
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Introduction to Systems Analysis and Design
Environmental Health and Safety Radiation Control and Radiological Services.
Development and Quality Plans
ISO 9000 Certification ISO 9001 and ISO
Photocopies Occasionally need uncontrolled copies
Library Automation: Planning and Implementation
The BIM Project Execution Planning Procedure
Personnel. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety The.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
S/W Project Management
Copyright Course Technology 1999
University Assessment Committee Comprehensive Standard (CS) The institution identifies expected outcomes, assesses the extent to which it achieves.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
S oftware Q uality A ssurance Part One Reviews and Inspections.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Introduction to the Requirements Document
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Lecture3 : Change Control Lecturer: Kawther Abas 447CS – Management of Programming Projects.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Total Productive Maintenance (TPM)
Georgia Institute of Technology CS 4320 Fall 2003.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Operational Demands of ReA3 at NSCL “Adapting to Change” WAO 2012, Stanford University Jon Bonofiglio August, 7 th, 2012.
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Development: A Survey Chapter 11.
7Maintenance, Inspection and Testing of Critical Equipment OBJECTIVE: To develop and implement a Maintenance, Inspection and Testing Program (MITP) for.
Chapter 2 Organisation and People. HD Location Centralised –Single physical location within an organisation Decentralised –Multiple support sites located.
Chair of Software Engineering Exercise Session 6: V & V Software Engineering Prof. Dr. Bertrand Meyer March–June 2007.
Introduction to Project Management.  Explain what a project is?  Describe project management.  Understand project management framework.  Discuss the.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
RUP Deployment RUP Deployment Workflow
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
Database Administration Advanced Database Dr. AlaaEddin Almabhouh.
Advanced Software Engineering Dr. Cheng
Corrective and Preventive Maintenance at NSCL
Chapter 1 The Systems Development Environment
Structure and Responsibility
Chapter 1 The Systems Development Environment
CHIEF OPERATING OFFICER Buffalo Public Schools
Chapter 1 The Systems Development Environment
CLINICAL INFORMATION SYSTEM
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Story Contracting – Our 5S Journey
PREVENTIVE MAINTENANCE
Chapter # 1 Overview of Software Quality Assurance
Chapter 1 The Systems Development Environment
Facilitating Change (AET 560)
Radiopharmaceutical Production
Presentation transcript:

Corrective and Preventive Maintenance at NSCL

Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future Questions

NSCL National Superconducting Cyclotron Laboratory (NSCL) is a world leader in rare isotope research and nuclear science education Located on the campus of Michigan State University NSCL employees 454 Faculty, Staff and Students Ranked as the #1 graduate program in nuclear physics In the United States by U.S. News & World Report

Cyclotrons & Beam Lines

The United States pioneer land-grant university, established in 1855 Michigan State University MSU has over 11,000 employees In 2010, MSU enrollment consisted of 47,131 students from all 50 United States and 130 countries Throughout the world, there are nearly half a million MSU alumni

It allows a facility to do what it does best………. It allows a facility to meet the demands of its funding agencies………. It allows a facility to meet its operational goals………. Why is a Robust Maintenance Program Important? NSCL has a Quality Management System (QMS) to meet all of the above “Operate the laboratory reliably, efficiently and safely. Maintain high (>90%) level of availability and seek further gains in efficiency through improved procedures and automation of NSCL operations without compromising safety. Encourage the professional development of staff to raise the overall skill, performance, and knowledge bases within the laboratory.”

NSCL Quality manual states: “NSCL developed and implemented a Quality Management System in order to document the laboratory’s best operational practices, better satisfy the requirements and expectations of its users and improve the overall management of the laboratory” The Quality Management System of NSCL meets the requirements of the international standard ISO This system addresses the production and delivery of rare isotope beams This manual describes the Quality Management System, delineates authorities, inter relationships and responsibilities of the personnel responsible for performing within the system. NSCL Quality Management System

The Scope of the NSCL Quality System is: All NSCL processes related to the production and delivery of rare isotope beams to the experiment The quality manual outlines the policies, procedures and requirements of the Quality Management System. The system is structured to comply with the conditions set forth in the International Standard ISO NSCL QMS Scope

Rare isotope beams will be delivered with 90% availability Rare isotope beams will be delivered within 24 hours of the scheduled time NSCL QMS Quality Objectives Availability (Total Time - Scheduled Off - Unscheduled Off excl ) / (Total Time - Scheduled Off)

NSCL Availability

Tools Logging & Reporting Administrative Document Handling Inventory Management Planning Scheduling Tools…the actual hand tools

Logging and Reporting HourLog Trouble Reports Allows for both narrative and system status reporting Reliability statistics are derived from HourLog Used to report a problem with a system or process and even a suggestion Allows the trouble report to be tagged for various management systems

Administrative Reliability Committee Repair Team Trouble Reports are reviewed bi-weekly Committee can reopen a solved Trouble Report for further investigation Meeting called by department head All system experts are present Actionable items generated

Document Handling Alfresco document management Workflow determined by users Mechanical Design department design review approval Revision control

Inventory Management Developed in-house, using IRMIS IRMIS is a descriptive documentation Tool * Uses relational database and associated applications to comprehensively document the large and complex EPICS-based control systems * Handheld Bar Code Scanners MC55 * An Overview of IRMIS, 4/19/2005 (

Scheduling Administration Schedule Short Term Schedule ~ 1 hour resolution ~ 1 day resolution Determined daily Determined 3 months out Operations has final review STS Coordinator

Maintenance Planning Experimental schedule is determined months in advance Preventive maintenance is scheduled in between experimental periods The maintenance group solicits tasks from other departments to add to the maintenance schedule Microsoft Project 2008 is used to build the maintenance schedule NSCL written software is used by the employees to get a list of their tasks The same software is also used by the employees to report the status of their tasks back to the project leader

Breakdown Plans In order to reduce downtime during breakdown repairs lasting at least 24 hours, but less than 7 days, a breakdown response plan is proposed to better allocate resources, and use time more effectively. The scope of this document is to explain the process for using and creating canned breakdown response plans. The initial scope of the breakdown, and such considerations as duration and level of support by other departments should be determined by a repair team meeting.

Tools…the actual tools Modified 5S method Provides a basic set of tools to address an immediate need without wasting valuable time 5S is a system to reduce waste and optimize productivity through maintaining an orderly workplace and using visual cues to achieve more consistent operational results * * Lean Manufacturing and the Environment, Vault Tool Box

Tool Integration

Operator Structure Operations/Maintenance Maintenance Engineers Operating Engineers During experiments, all personnel rotate through shifts as operators During maintenance, all personnel become part of the resource pool used during scheduled maintenance

Future Tighter Integration of tools Written with common software

Questions