Mjt 8/24/2004 UNRESTRICTED - May be shared American Agronomic Stewardship Alliance(AASA) PROGRAM OVERVIEW.

Slides:



Advertisements
Similar presentations
EPAs Refillable Container Requirements Ag-IBC Summit 2010 September 8, 2010.
Advertisements

Tips to a Successful Monitoring Visit
Red Flags Rule BAS Forum August 18, What is the Red Flags Rule? Requires implementation of a written Identity Theft Prevention Program designed.
Spill Prevention Control & Countermeasures Compliance and Planning.
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
1 Joint Commission for Environmental Cooperation and U.S./Mexico Border 2012 Collection and Storage of SLABs December 4, 2007.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
EPA Pesticide Container and Repackaging Regulations, Flow Chart 3: Can I fill this small portable refillable container (capacity of 119 gallons or less)?
EPA Pesticide Container and Repackaging Regulations, Flow Chart 2: Can I fill this large portable refillable container (greater than 119 gallons)? (end.
ANNUAL SPILL PREVENTION CONTROL AND COUNTERMEASURE TRAINING (SPCC) Presented by: Prepared for: Stephen F. Austin State University February 2, 2012.
UTHSC IRB Donna Hollaway, RN, CCRC 11/30/2011 Authority to Audit 45 CFR (e) An IRB shall conduct continuing review of research covered by this.
1 Pesticide Container-Containment Regulation Update U.S. EPA Office of Enforcement and Compliance Assurance Western Regions/States/Tribes Pesticide Meeting.
Mobile, Alabama February 5-7, 2013 Pesticide Stewardship Conference.
Mjt 8/24/2004 UNRESTRICTED - May be shared American Agronomic Stewardship Alliance(AASA) PROGRAM OVERVIEW
EPA’s Refillable Container Requirements Are You Ready? IFCA Workshop January 20, 2011.
Caged Tanks for Pesticides: Terminology, EPA Regulations and Pesticide Labels Rinsing and Recycling Caged Tanks Nancy Fitz Chemical Engineer U.S. EPA Office.
Pesticide Container-Containment Regulations: FIFRA 19(f)(2) Determinations of Adequacy.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Marcy Mealy Procurement Specialist CDBG Program
ACCA Legislative Conference Underground Storage Tank Compliance
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
1 Implementation of EPA’s Pesticide Container - Containment Rule 2007 North American Pesticide Applicator Certification & Safety Education Workshop August.
Developing a Records & Information Retention & Disposition Program:
Special Education Accountability Reviews Let’s put the pieces together March 25, 2015.
Bulk Fertilizer Regulations For Farm Facilities Ohio Department of Agriculture Pesticide & Fertilizer Section 8995 East Main Street Reynoldsburg, Ohio.
1 EPA’s Pesticide Container and Containment Rule: Implementation Western States Meeting May 16, 2007 U.S. EPA Office of Pesticide Programs.
AMR Proprietary and Confidential FAA Compliance Training.
1 OSHA Hazard Communication Standard Occupational Safety and Health Standards for the General Industry OTI 501 LABEL MSDS HCP.
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
BY: GROUP 2 Food Safety Regulations and Standards.
1 CDBG Procurement Requirements For Local Officials.
PSC INSPECTION REPORT George W. Wakim, P.E.
Created May 2, Division of Public Health Managing Records What is a Record? What is a Records Retention & Disposition Schedule? Why is this Important?
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
Pesticide and Fertilizer Bulk Storage. Buying in bulk.
ULSD Downgrading A general overview of the Clean Diesel Fuel Rules on downgrading as defined by the US EPA It is the responsibility of each person to understand.
Industrial Inspections Making Good Inspections Better David Long EPA Region 6.
PENNSAFE ONLINE HSSF Pennsylvania Worker & Community Right to Know Act
Host Agency Safety Consultation What the law says you must do.
Gwinnett County Department of Water Resources Reclaimed Water Transport/Application Training Program March 13, 2008 Revision 2.
EPA’s Pesticide Container Regulations: What are EPA and the States Seeing in the Field? TPSA Conference Nancy Fitz, U.S. EPA February 7, 2013.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
DISTRIBUTION IMPLEMENTATION EXAMPLES AND TOOLS David Sandidge Director, Responsible Care American Chemistry Council June 1, 2011.
Hazard Communication Presentation Presented by: Western Assurance Corp Desert Utility & Paving, LLC and Century Club Construction, LLC Design © 2005, 2012.
EPA’S NEW CONTAINER/CONTAINMENT REQUIREMENTS WHAT GROWERS NEED TO KNOW.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
NEW PHOSTOXIN LABELING
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
Portable Fuel Container Spillage Control Project Monitoring and Laboratory Division June 28, 1999 California Environmental Protection Agency Air Resources.
THE LONG-TERM CARE OMBUDSMAN PROGRAM (LTCOP) Overview of the History, Role, and Responsibilities.
Overview of 3 rd Party Inspection Program for USTs.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Breast Pump Policy Presentation to: Nutrition Services Directors and Breastfeeding Coordinators Presented by: Julianne Gaston MPH, RD, LD and Pat Cwiklinski.
1 OSHA Hazard Communication Standard General Industry LABEL MSDS.
Bellwork List 3 chemicals that you have at home? What would you do if a younger relative ingested them?
UST Inspection Program
Industrial Assessment Center Database
Food Safety Regulations and Standards
Facility Safety Plan Webinar September 17, :00PM (EST)
GFSI Certification What Top Management Needs to Know
Red Flags Rule An Introduction County College of Morris
Presented to the Project Certification Committee on November 16, 2011.
Spill Prevention Control and Countermeasures
Chemical Purchasing.
RCRA Updates Larry L. Lamberth Enforcement and Compliance Branch
OSU Controlled Substances Training Module for Researchers
Presentation transcript:

mjt 8/24/2004 UNRESTRICTED - May be shared American Agronomic Stewardship Alliance(AASA) PROGRAM OVERVIEW

What is the AASA? The AASA is a non profit association that develops stewardship practices for the safe handling and storage of bulk, refillables and packaged crop protection products. The AASA developed and maintains an inspection checklist based on these practices and applicable federal requirements. AASA hires third party inspectors that use the checklist to conduct inspections of ag retail facilities. AASA is funded by manufacturers that purchase inspection reports to aid in their decision as to where products can be handled and stored safely and correctly (no cost to retailer).

AASA Board of Directors 6 Manufacturers 5 Distributors 2 Retailers 1 Ag Retailer Industry Representative 1 State Pesticide Control Official

Why The Need For An Industry Stewardship Program Like AASA? Reduce liability from potential spills and leaks by ensuring crop protection products are stored safely. Provide a single source for industry stewardship practices and inspections Reduce the need for multiple inspections. Source of information for our industry (manufacturers, distributors, retailers) on the USEPA Pesticide Container & Containment Regulations.

AASA-History Timeline Initiative started With Crop Life America Ag Retailers Association Joined – Steering Committee develops stewardship practices and checklist Pilot Program (200+ sites) AASA Incorporation Inspection program begins IFCA takes over administration in January Approximately Retail Facility Inspections completed through September, 2014

Inspect ,2008,2011,2014 Inspect ,2009,2012,2015 History of State Inspections Inspect ,2007,2010,2013

The AASA Inspection Process Third party inspector makes an appointment to visit a facility- inspections conducted from June through September. Inspector inspects facility in about 2 hours (we encourage facility personnel to participate). Copy of completed inspection checklist available upon request on day of inspection. AASA will mail a copy of the completed inspection report (as it appears in the database) to each facility. Facility reviews the report and sends any corrections to the AASA.

Key Advantages A single checklist so facility managers have a clearer idea of industry expectations. Reduce duplicative inspections. The inspection is at no cost to the retailer – manufacturers pay for each report. A copy of its inspection report is mailed to each retailer. Individual facility Inspection data is confidential.

Questions On The AASA Checklist General Information about a facility. General Tank Information to ensure tanks can accommodate product--tank capacity, hoses, vents, pump size, etc. Containment information Required Items--those items that are required by law or by one or more of the basic manufacturers. (AASA has no enforcement capability) General Items—best practices or items that may be required in the future.

2015 Program Inspections – Regulatory Consultants Inc – FarmChem – Piedmont Environmental Consultants – JTAG Inc. Data Management – Regulatory Consultants Inc Inspection Report Review - Crop Protection Manufacturers Quality Assurance Program - Klean Wash, Inc.

2014 Postcard Survey Brief postcard survey to gather basic information and feedback on inspectors and inspections. Postcards were provided to inspectors to be left with each facility upon completion of inspection 34% of the postcards were returned.

Post Card Survey Did the AASA inspector make an appointment? 96% Yes Was the inspector courteous & professional? 100% Yes Did the inspector inform the retailer they would receive a copy of the inspection form? 96% Yes Did the inspector provide feedback or explanation of any problems? 97% Yes Did the inspector measure the sizes of all tanks & all containments? 82% Yes Approximately how long did the inspection take? minutes – 44% > 60 minutes – 12% < 30 minutes – 44%

Last Inspection Cycle – All States: 2012, 2013, 2014 Year Total # Sites # Tanks # Containments # Bulk & PRCs

Containment: Pad Construction

Containment: Dikes/Units Capacity, Location, Construction

Containment: Storing Filled PRCs

Inspection Summary: Containment 3 Yr. Cycle Q# 42- Tank secondary containment with 100%(indoor) or 110% (outdoor-uncovered) capacity 90% Q#43- Tanks containment area is indoors or outdoors and covered 83% Q#47- Bulk containment is rigid material (I.e. concrete, steel, reinforced sealed block) & is liquid- tight 97% Q#44- Containment drains, valves, & cracks are permanently sealed. 79% Q#50- Dispensing & transfers occur are on rigid, liquid-tight containment. 93% Q#68- Filled PRCs are stored in or within containment 85%

Labeling

Inspection Summary: Bulk Labeling 3 Yr. Cycle Q#31a- The tank is labeled with the net contents80% Q#31b- The correct EPA Est. No. is affixed to the tank 83% Q#31- The tank is labeled which includes a product booklet 88%

Inspection Summary- Sampling of Encouraging Elements 3 Yr. Cycle Q#62- Repackaging Agreements for bulk products are current & on file 99% Q#74-Safety Data Sheets (SDS) are available to employees99% Q#76- Personal protective equipment (PPE)is available to employees 99% Q#66- Containment for PRC product transfers meets minimum capacity requirement. 94% Q#30- Written security plan is on file.96%

Tanks: Valves

Security

Containment Pad Capacity

Inspection Summary- Valves, Security, Capacity 3 Yr. Cycle Q#36- Tank inlet/outlet valve is lockable stainless steel97% Q#49- Tanks are inside a lockable fence or in a secured building. 89% Q#52- Containment for bulk product transfers meets minimum capacity requirements. 89%

PRC: Bulk Transfers, Pad Construction & Maintenance

PRCs: Intact One-Way Valve & or Tamper-Evident Device

Inspection Summary- Portable Refillable Containers (PRCs) 3 Yr. Cycle Q#61- Bulk product dispensing & transfers to PRCs occur on or within properly maintained, liquid-tight rigid containment. 97% Q#65b- PRCs have an intact one-way valve and/or tamper- evident device on all non-vent openings. 99% Q#71- All PRCs are regularly inspected and meet applicable EPA/DOT packaging and/or leak proofness testing requirements 99% Q#64*- Written procedure in place to ensure PRCs are cleaned per manufacturer’s instructions prior to changing product or formulation 99%.

Encouraging Results Areas Of Retailer Progress Containment Pad Capacity Quality Of Bulk Containment Units (Dikes) Bulk Transfers On Containment Pads Anchoring Or Elevating Unique Identity For PRCs Intact One-way Valve/Tamper Evident Device Lockable Security Fence Or Enclosed Secure Area Labeling PRCs Inspection Of PRCs When Refilling

11 Years Of AASA Inspections What Have We Learned ? Retailers find Benefits In Inspections Retailers Appreciate Having Only One Inspection AASA Is A Source Of Information For PCC & Other Regulatory Updates Retailers Have & Are Making Significant Stewardship Progress On Containment, Containment Pads, Lockable Valves, Security, Unique ID For PRCs, Covered Containment & Record Keeping Still Areas Needing Improvement At Retailer Sites

To get copies of AASA Summaries Contact AASA in writing ( National summary and your state only. Summaries only—no identifiable sites.

For Additional Information Visit the AASA Website at for: – Contact Information – AASA Fact Sheet – Inspection Checklist – Inspector Credentials and Photographs