E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Contour Lines.
Digimap Training Workshops Ordnance Survey Products Aim: to provide support staff with a basic knowledge of Ordnance Survey digital mapping products.
Surveying Chain Surveying
Investigation of canal structures Session objectives –Spell out the purpose of CM & CD works –Describe the procedure for preparation of site survey plan.
Maps and Aerial Photos There are many different kinds of maps Geopolitical Topographic Shaded Relief, Photorectified or Standard Geologic Ecosystemic Meteorological.
Profile Leveling.
ERT252/4 GEOMATICS ENGINEERING
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Topographic maps show…. - USGS: Uses for topographic maps… -
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Landforms Bingo Your Host: Mr. Mount
Faculty of Engineering Technology
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
TOPOGRAPHIC MAP.
E4014 Construction Surveying
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Chapter 14 Legal Descriptions and Site Plan Requirements.
1 Welcome to the International Right of Way Association’s Course 900 Principles of Real Estate Engineering 900-PT – Revision 2 – CA.
Seminar on the design of assessment for the revised S4-5 geography curriculum Chan Chin Lee HKSYC & IA Chan Nam Chong Memorial College 29/5/2004.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Compass Survey Part 1: Conducting a compass.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
Morphum Environmental Ltd Environmental Engineers and Consultants
Skills Section 1.OS Maps 2.Aerial Photographs 3.Graphs This appears throughout all sections of the exam paper but particular emphasis on settlement (human.
Civil Engineering Surveying Prepaid by:
TECHNIQUES IN BASIC SURVEYING
Highway Route Surveys And Location
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
E4014 Construction Surveying Road Construction Plans.
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
What is a map? Civil Drafting?
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Mountain Navigation. Strategies for safe navigation Errors do occur. Re-location. The navigator should have a number of strategies to allow the recognition.
Mapping Chapter 16. Uses of Topographic Maps To determine the topography or relief of a tract of land. To determine hydrologic features such as drainage.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
INTRODUCTION TO SURVEYING
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Geologic Geometry. TOPOGRAPHIC MAPS Many problems in mining and civil engineering are solved by graphic communication.
JROTC Introduction to Maps.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Rampurwala Taher Z Panchal Deep S Shah Akash K Patel Apurv K Rathod Hardipsinh.
Civil Engineering Surveying Roy Frank. Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1. Choice.
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
Course Title: Engineering Surveying (CVE 301) Course Lecturer: Engr. F. M. Alayaki Civil Engineering Department, College of Engineering, University of.
The main object of shore line survey is to prepare a topographical map of the shore line.
AIRPORT SURVEYS.
PowerPoint Presentation
INTRODUCTION: Land Surveying: It has to do with the determination of relative spatial location of points on or near the surface of the earth. It is the.
Investigation of Road Project By S.N. Nanaware
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
Mapping Earth’s Surface
Profile Leveling.
Investigation of Road Project
Visit for more Learning Resources
Mr. Vedprakash Maralapalle, Asst. Professor
Contour Lines Sbmitted By: Pramit Sharma R.B.S E.T.C Bichpuri Agra.
Rectangular Coordinates Level control in trenches
The Fundamentals of Mapping
May 18, 2016 Spring 2016 Institute of Space Technology
SURVEYING – II INRODUCTION OF CONTOUR
Geologic Geometry.
Topographic Survey Introduction „ Mapping surveys are made
Topographic Survey Introduction „ Mapping surveys are made
Site Plan A plan that shows the contours of a site, as well as any existing topographical features and structures. The site plan may also show proposed.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Engineering Surveying Linear Survey
Presentation transcript:

E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey

Reconnaissance Survey Gather sufficient information to select one or more bands of country for the possible route Assemble basic information –Topographic maps –Cadastral maps / GIS –Aerial photos –Orthophotos

Reconnaissance Survey Evaluate –General topography –Geology –Meteorological statistics –Flood records –Unsuitable terrain –Land use and ownership / Local Authority’s GIS –Existing services –Existing communications

Reconnaissance Survey Field reconnaissance to confirm assembled data Choose possible routes NOTIFY RELEVANT AUTHORITIES

Investigation Survey Collect sufficient information to design the horizontal and vertical alignment and thus: –Likely earthwork quantities –Intersection details –Bridge and culvert sites –Stream diversions –Land resumptions –Water catchments –Flood levels –Road building material –Total cost

Investigation Survey Survey methodology –Place traverse stations along proposed route –Establish basic horizontal and vertical control –Preferably MGA coordinates (plane) and AHD heights –Control traverse between traverse stations for horizontal coordinates –Spirit level vertical control (if necessary)

Investigation Survey Survey methodology, cont –Create a DTM either by cross sections or point pickup level & staff total station GPS –200m band (100m ether side of proposed centreline) or as requested

Investigation Survey Survey methodology, cont –include railway / tramway road and bridge details culverts overhead cables, transmission lines, heights underground services cadastral boundaries and fences property improvements geological features and soil types vegetation watercourses and swamps

Investigation Survey Survey methodology, cont –Accuracy Horizontal1 : 5000 Vertical(   K) metres –where K is the distance levelled in kilometres

Investigation Survey Survey methodology, cont –Catchment Areas Necessary for bridge and culvert design Aerial photos Compass and clinometer traverses

Investigation Survey Survey methodology, cont –Aerial Surveys May be utilised in lieu of other methods Photographed data becomes a reasonably permanent record, unbiased and complete Heights are not necessarily accurate

Working Survey A working survey must provide data of sufficient accuracy and extent for the satisfactory detailed design of the road and the later setting-out for construction.

Working Survey Survey Marks –Pegs (75mm * 50mm) are placed along the centre line (straight and curves) at 20 / 50 metre intervals –Offsets (75mm * 50mm pegs, short star pickets driven flush) placed left and right of centre line 200 metre intervals beginning, centre and end of curves –level and check level all centre line and offset pegs

Working Survey Survey Marks, cont –establish benchmarks at 1km intervals at bridge and culvert sites

Working Survey DTM is established at the following widths –Secondary roads15 metres left and right –Main roads25 metres left and right –Developmental roads and highways 30 metres left and right

Working Survey Detail (horizontal and vertical) –located within 100 metres of the centre line –All public and private improvements –Existing road and rail formations –Drainage –Underground and overhead services

Working Survey Bridge and culvert sites –Require sufficient information to plot 0.25 metre contours for 100 metres up and down stream of the centre line –Grid may be used Lines parallel and at 3 metres intervals from the centre line Each line is levelled from high bank to high bank Any intermediate section where the profile changes is also levelled –Bed levels for 500 metres up and down stream –Sections taken at the end and at any profile changes

Working Survey Watershed traverses –as per Investigation Survey Working drawings –Plan –Long-section –Cross-sections

CONSTRUCTION SURVEY urban equivalent to the Working Survey route is pre-determined by the presence of existing road reserves general survey requirements are the same as for Working Surveys density of detail is such that the procedures of observation and recording may have to be varied

CONSTRUCTION SURVEY Separate field and level books should be used –Detail Files / Field Notes (i)Main centreline pegging and adjacent detail (ii)Subsidiary centreline pegging and detail (iii)Fence traverses to locate dividing fences and property improvements (iv)Side street centreline traverses

CONSTRUCTION SURVEY Separate field and level books should be used –Level Notes (i)Main centreline levels and normal cross section (ii)Subsidiary centreline levels (iii)Check levels (iv)Drainage levels, both underground and surface (v)Subsidiary levels - accesses (vi)Side street levels and cross-sections (vii)Side street check levels

CONSTRUCTION SURVEY With respect to field books, cross referencing of information and explanations of abbreviations used require utmost care and attention same code table used by all surveyors planning with the aid of maps should ensure that no area remains unsurveyed

CONSTRUCTION SURVEY Centre Line –unable to safely mark the centreline of roads already carrying high loads of traffic –centreline pegged along one footpath parallel to road centreline where possible –subsidiary line along opposite footpath, if necessary –offset pegs placed in "safe positions" eg against fences

CONSTRUCTION SURVEY Centre Line, cont –fences –detail may be located chainage & offset as well as radiations –houses, dividing fences, points of vehicular access, etc. may be located by "chainage & offset" along previously located fence lines

CONSTRUCTION SURVEY Cross Sections –based on main centre line –normally extend 5 metres into adjacent properties –if resumptions are anticipated then cross sections may have to be extended –be aware of abrupt changes in level between footpath and adjacent properties –must illustrate the true cross section shape of the road (ie crown, changes of cross fall, edges, channel lips, channels, kerbs and footpath)

CONSTRUCTION SURVEY Subsidiary Cross Sections –required at all vehicular accesses to adjacent properties –extend 5 metres into adjacent property

CONSTRUCTION SURVEY Drainage Detail –both open and underground –underground position and level of manhole or pit size and direction of all pipes, leading in and out invert levels on all pipes

CONSTRUCTION SURVEY Drainage Detail, cont –open drainage channels and natural watercourses as per culverts sites in Working Survey –watershed difficult to determine in urban situation attention must be paid to the position and direction of flow in stormwater pipes near the natural watershed boundary

CONSTRUCTION SURVEY side streets –extend minimum of 50 metres