12/11/2014 1 Focus on cross-cutting topics of Elios 2 By Jean Roussel & Michel Van Droogenbroek (WP 5) Final Forum meeting (7), DG ENTR, Brussels.

Slides:



Advertisements
Similar presentations
EURADWASTE 29 March 2004 LOCAL COMMUNITIES IN NUCLEAR WASTE MANAGEMENT THE COWAM EUROPEAN PROJECT EURADWASTE, 29 March 2004.
Advertisements

European Commission DG Research SF SME NCP Main activities of the Network Sebastiano FUMERO Research & SMEs DG Research - European Commission.
OPENDAYS 2011 Added value and efficiency through the use of article 37.6(b) and EGTC Cooperation in the mainstream programmes example of Limousin (France)
8th European Forum on Eco-Innovation Bilbao, Spain April 2010 Making Eco-Innovation happen in Small and Medium-Sized Enterprises Adrian M Joyce -
Dr. Chantal Lacroix PROGRAMME MANAGER DEPUTY HEAD OF MISSION
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
The evolution of European security research and innovation programmes: changing purposes and rationales Jean-Marc Suchier ETTIS R&I strategies and policy.
11 June WP1 Progress report By Jean-Luc Salagnac, WP1 leader and Frédéric Bougrain Forum meeting 6, DG ENTR, Brussels.
DIRECTION DE LA POLITIQUE ECONOMIQUE Towards a RIS3 strategy for: Wallonia European Cluster Alliance (ECA) and TACTICS workshop: BRUSSELS, June 21th, 2012.
Sociedade Portuguesa de Inovação ChinaFrontier: China’s Realities from a Frontier Research Perspective Overall Objectives of the Project and a Summary.
FLEGT VPA Independent Market Monitoring (IMM). IMM Background IMM is a condition of some FLEGT VPAs (e.g. Indonesia) Builds on IMM proposal by EFECA in.
12 November WP3 – General Perspective By Thomas Dunand, Hannover Re Forum Meeting 7, DG ENTR, Brussels.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
RIS LAUNCH CONFERENCE Ljublijana, June 6, 2005 Gains of the RIS West Romania Process throughout the IRE Secretariat Support Raluca CIBU-BUZAC Head of International.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Maximising the re-use of PSI within Europe Chris Corbin ePSIplus Analyst European Associations Meeting, Copenhagen, funded by eContentPlus.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Environmental Compliance Assistance Programme for SMEs – and beyond Imola Bedő DG Environment C1 – Sustainable Production and Consumption Unit.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Strasbourg 05/06/07 Strasbourg 31/07/07 EUROPEAID Non-State Actors and Local Authorities in Development WTD: WORKING TOGETHER FOR DEVELOPMENT.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
12 November WP2 Building pathology By Henk Vermande Forum meeting 7, DG ENTR, Brussels.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
EN Regional Policy EUROPEAN COMMISSION Innovation and the Structural Funds, Antwerp, 16 January 2007 Veronica Gaffey Innovative Actions Unit.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
EMAC – Network and Support of National Contact Points solitander:
Directive Patient mobility Brigitte van der Zanden Taskforce Health AEBR 12 November 2009 Brussels - AER.
International Conference on Risk Assessment and Management: objectives and current status Valentin Nikonov, PhD (Economics), PMP IPMA, QMS Auditor, Coordinator.
Paul Griffiths and Roland Simon Wrap-up presentation What has the EMCDDA learned ?
A Strategic Research Agenda for Europe in the field of illicit drugs Priorities for socio-economic and humanities research HDG Brussels - December 10,
2009/10/06 STUDY ON RECOGNITION OF PROFESSIONAL QUALIFICATIONS Alternative title slide.
Result Orientation in Interreg CENTRAL EUROPE Annual Meeting, Luxemburg, 15 September 2015 Monika Schönerklee-Grasser, Joint Secretariat.
„Doctoral candidates as a link between EHEA and ERA- challenges for the 21st century “ Izabela Stanisławiszyn President, EURODOC Bologna.
ECVET AIMS AND KEY DOCUMENTS DARKO MALI (CPI, LJUBLJANA) BLED, 17 SEPTEMBER 2013.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
 RESPONSIBILITY: FP7 Co-ordination action  Aim: contribute to development of RRI Governance Framework for future European Commission (and eventually.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
The Interstate Council for Standardization, Metrology and Certification of the Commonwealth of Independence States (CIS) The report of 13 th session of.
Directorate General for Enterprise and Industry European Commission The New Legislative Framework - Market Surveillance UNECE “MARS” Group meeting Bratislava,
ESPON Seminar Luxembourg, 8-9 December Cohesion-and-Urban-Policy-_26-27-November-2015_-Luxembourg-City_/index.php.
Results of the midterm evaluation exercise on the Leader + programme for Portugal Special focus on evaluating innovation Pedro Afonso Fernandes (CIDEC.
Working Group 2 Climate information transfer to stakeholders Roma, 9 July 2013
Flagship Project Final Conference Thiemo W. Eser Ministry of Sustaianble Development and Infrastructure, Luxembourg 16 December 2015 in Brussels Messages.
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT ORGANISATION DE COOPÉRATION ET DE DEVELOPMENT ÉCONOMIQUES OECDOCDE Workshop on improving statistics.
Flood Awareness and Prevention Policy in border areas Brussels, 7 May 2007 Annelieke Laninga-Busch Project manager.
OBSERVAL Barcelona January Objectives of the project  Create a European Observatory on validation of non formal and informal practices and.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
12/11/ Focus on cross-cutting topics of Elios 2 By Jean Roussel & Michel Van Droogenbroek (WP 5) Final Forum meeting (7), DG ENTR, Brussels.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
1 Recent developments in quality related matters in the ESS High level seminar for Eastern Europe, Caucasus and Central Asia countries Claudia Junker,
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Homelessness The added value of transnational cooperation for local authorities.
ITC - ETUC European Sectoral Social Dialogue in the construction industry Werner Buelen Tel : 02/ (ext.45)
SBS and the Construction Sector
EU Reference Centres for Animal Welfare
Current Developments at EU level
RST processes Session 5 Presentation 2.
ECVAM as EU-RL according to 2010/63
SOCIAL DIALOGUE WITHIN EUPAN
Social Dialogue on Education and Training ESF Committee 10 March 2011
Troika of Directors General – Meeting 24 March 2006 Activities of the Human Resources WG Karin Thienel.
Task Force on Target Setting and Reporting TFTSR
LIFE and the implementation of the Water Framework Directive
LIFE and the implementation of the Water Framework Directive
European PPP Expertise Centre (EPEC)
European Commission's Initiative on Electronic Transport Documents
Presentation transcript:

12/11/ Focus on cross-cutting topics of Elios 2 By Jean Roussel & Michel Van Droogenbroek (WP 5) Final Forum meeting (7), DG ENTR, Brussels

Plan  Challenges encountered during the process of the Pilot Project  Overview of some key findings/results of the Pilot Project  Focus on 2 recommendations: an Observatory (EQEO) and a Facilitator (EFACI) 2

Challenges encountered 3 ChallengesWP ConcernedActions Different concepts of construction insurance throughout Europe WP 3 (with consequences for WP 1 and WP 2) Systematic search for tools to promote the exchange of information and mutual recognition Scepticism of some national actors about an European initiative in construction insurance WP 1 Creation of the “Elios 2-test” status which permits the description of corresponding QS by Elios 2 partners. The QS providers are invited to validate recorded information. PR actions through European and local networks and advertisement on professional websites. WP 2 Stimulate exchange of information between selected key national actors holding information on building pathology

ChallengesWP ConcernedActions Conformity/complementari ty of national Quality Signs in relation to the CE marking WP 1 Interaction with representatives of the EC and several stakeholders of the construction and insurance sectors, especially sign providers, in order to focus the debate on the access to insurance. Attempt to better understand the underwriting process. Confidentiality of data on pathology and reluctance to disseminate this data WP 2 Emphasize qualitive data rather than quantitative data. Focus on some eco- technologies based on predetermined criteria. Lack of of guarantees in terms of energy performances WP 3 Comprehensive state of the art of existing guarantees and exchange with major actors in insurance in order to understand their points of view. 4

Key results/Trends  Amongst the main trends observed during the Pilot Project Elios 2, some are “in line” with the conclusions of Elios 1  Other ones are somewhat new or different 5

Confirmed trends  Diversity of national regimes  Interconnection between construction insurance and its national context  Despite the diversity, similarity of concerns 6

New developments (1)  A break in the tendency to implement mandatory insurances 7

New developments (2)  Scepticism on the part of some national actors and stakeholders about the European initiatives regarding construction insurance  A kind of contradiction between the European legal framework and the national markets realities 8

Conclusion of these trends The necessity to imagine tools improving circulation of information at a European level 9

Focus on 2 recommendations  An observatory allowing an exchange of information about the crucial topic of pathology: the EQEO Project  A way to fix the delicate question of the access to insurance for cross border activities: a European Facilitator 10

About the EQEO  EQEO: Eco technologies Quality European Observatory  The EQEO is a pilot database making extensive information on some eco technologies available at the European level 11

Objectives  To promote the quality of eco- technologies used in the construction sector  To support insurers in their risk assessment and, consequently, to facilitate the access to insurance, especially for SMEs 12

EQEO: choice of 3 eco-technologies  Photovoltaic Panels (PV’s)  Ground source heat pumps  Bio material based insulation 13

About the EQEO 14

EQEO A call for interest from the EC  To the representatives /stakeholders of the insurance and construction sectors  To the possible partners: national actors holding some records or databases about pathology for their markets 15

Cross border activities and access to insurance  An unsatisfactory situation according to the staff working document issued by the EC the 31 st of March 2014  Difficulty to assess exactly the problems faced by the services providers  Difficulty, consequently, to identify the causes and remedies to the situation 16

Cross border activities : possible tracks of improvement (1)  Organise equivalencies (art Services Directive)  Reduce the diversity of the 28 construction insurance systems (harmonization, best practices, …)  Facilitate the exchange of information on the existing systems and available insurance (links with the Points of Single Contact/PSC, art. 6) 17

Cross border activities : possible tracks of improvement (2)  Set up a tool in order to fix the difficulties on a tailored and consensual basis: a European Facilitator for Access to Construction Insurance (EFACI)  Set up constraining mechanisms (e.g. BCT in France) 18

European Facilitator for Access to Construction Insurance (EFACI) 5/12/2014 Schematic presentation

Cross border activities and access to insurance  An unsatisfactory situation according to the staff working document issued by the EC the 31 st of March 2014  Difficulty to assess exactly the problems faced by the services providers  Difficulty, consequently, to identify the causes and remedies to the situation 20

Cross border activities : possible tracks of improvement (1)  Organise equivalencies (art Services Directive)  Reduce the diversity of the 28 construction insurance systems (harmonization, best practices, etc.)  Facilitate the exchange of information on the existing systems and available insurance (links with the Points of Single Contact/PSC, art. 6) 21

Cross border activities : possible tracks of improvement (2)  Set up a tool to fix the difficulties on a tailored and consensual basis, a European Facilitator for Access to Construction Insurance (EFACI): Elios 2 recommendation  Set up constraining mechanisms (e.g. BCT in France) 22

EFACI: role of the Facilitator an independent Authority, appointed by the EC, in charge of advising and helping the service providers of the construction sector in order to facilitate the access to insurance for their cross border activities 23

EFACI: limits of the Facilitator’s role The Facilitator will not be in charge of:  making it compulsory for an insurer to cover a risk  managing the contractual process (guarantees, premium, claims…) 24

EFACI: missions and added value 25  deliver to the providers of services an information as appropriate and as complete as possible  set up links with the national actors and with the points of single contact (PSC).  handle residual difficulties on a consensual basis  centralise demands concerning cross border activities in the construction sector, being able to make a reliable assessment of the (potentially) drawback of access to insurance for the Single Market.

Liaison Committee EFACI Actors of the insurance sector likely to propose or to find solutions for this access Service providers of the construction sector facing difficulties for access to insurance Role of the Liaison Committee

Possible composition of the Liaison Committee 1 representative of the EC 1 (or 2) experts 2 (or 3) representatives of the construction sector 2 (or 3) representatives of the insurance sector 27

Thank you for your attention 28