Introduction to ARA’s Proposal Resources Don Cole

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Project Quality Plans Gillian Sandilands Director of Quality
Roadmap for Sourcing Decision Review Board (DRB)
Develop an Information Strategy Plan
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Course: e-Governance Project Lifecycle Day 1
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Managing Outsourced SW Projects Lesson Learned Manoj Singh, PMP.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
CMMI Course Summary CMMI course Module 9..
Project Management Process Overview
Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
From Research Prototype to Production
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Project Management Course WebEx Introduction Don Cole & Felix Sanchez Project Management for ARA Engineers and Scientists.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Jeff Sestokas Estimating the Budget and Cost (Part 2) Project Management for ARA Engineers and Scientists Developing an Estimate from the Top Down.
Don Cole Challenges for Project Leadership Project Management for ARA Engineers and Scientists.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Simple rules to follow when creating the business plan.
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
What is project management?
Felix Sanchez and Don Cole
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
MGT 461 Lecture #27 Project Execution and Control Ghazala Amin.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
12.1 Plan Procurement: Introduction
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Proposals Helen M. Grady Technical Communication Dept. Mercer University.
V. 2. © Copyright and all rights reserved 4. Project Integration Management PMP Prep Course Based on the PMBOK ® Guide 3 rd Edition.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Supplier Management Can’t live with them, Can’t live without them!
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Copyright Science Systems Consulting, Inc.1 Approach to a Technical Solution Brainstorming Introduction This is a presentation to a technical writing team.
Copyright All Rights Reserved by
Procurement Management
Developing and Issuing the RFP
Project Management Process Groups
Chapter 5: Step 6: Developing Your Program Design
Presentation transcript:

Introduction to ARA’s Proposal Resources Don Cole Project Management for ARA Engineers and Scientists Introduction to ARA’s Proposal Resources Don Cole

Introduction The proposal stage of a project is important for a Project Manager since this is where a winning approach is developed. Customer accepts approach with greatest value of those proposed. Development of a Project Plan consists of adapting proposed approach to new conditions Clarification or change of requirements Results of negotiations Customer preferences Resource availability In most cases, the Proposal Manager becomes the Project Manager

Desired Learning Objectives Introduce Proposal Manager Resources Understand importance of marketing and proposal effort in developing a Project Plan Understand how management approach is influenced by: Technical Approach Staffing Risk Assessment

PM Course Overview PM Responsibilities Define the Program Structure Introduction to ARA Project Managers Handbook Introduction to ARA Proposal Handbook Define the Program Structure Review SOW Scope Design the Work Breakdown Structure -- Driven by SOW Design the Team Organization Driven by WBS or by Customer (IPT, Contract Rqmts., etc.) Driven by size of project or cost Design the Plan and Schedule Integrated Master Plan Integrated Master Schedule

“A poem begins in delight and ends in wisdom” Robert Frost (1874 - 1963)

Importance of Proposal Phase to Project Management Getting your ducks in a row Critical Elements of good project leadership include: Understanding customer requirements and expectations Developing a high confidence approach to meeting requirements and expectations At ARA, Project Management begins with the desire to accomplish, producing the drive to market support and solutions. This passion positions us to create a winning proposal and thus to begin to accomplish.

The ARA Proposal Handbook Resources for the Cost Estimate General Resources and Examples Revisions under construction at “Marketing Support” page

Critical Steps for Management Review and analyze procurement materials Develop the management approach to be compatible with: Procurement Requirements Technical approach Customer’s vision Win Theme

Review and Analysis Read and Re-read the entire solicitation Study the SOW Be sure you understand what the customer wants Multiple people should review and agree what is required If you have spent time marketing this customer, your knowledge of expectations will be far more complete Study the Evaluation Criteria Will generally determine proposal organization to assure a high score on evaluation Regardless of how well you can meet customer needs, you must score high in the proposal evaluation to have the opportunity Develop a Win Strategy (technical, management and cost) Emphasize ARA strengths over competitors to meet customers primary concerns Price effort appropriately to win

Developing the Management Approach Provide a clear, efficient project organization Clear delegation of authority, resources and responsibility to qualified leaders Present robust and reliable approach to communication Regular team meetings Team information access/exchange Client interaction/review Demonstrate you know: What is required When it is required What significant risks exist How to confidently mitigate the risks SOW WBS IMP IMS Winning Proposal Clearly identify significant tasks, milestones, and deliverables on project schedule Identify critical dependencies Identify/mitigate schedule risks Demonstrate success of management approach on prior projects of similar complexity

Example Requirements: Design, Build, Demonstrate an improved widget Develop Management Approach Assess Risks (iterative as approach is developed) Project Risks (Technical, Financial, Schedule) Company Risks (Safety, Security, Small Business) Determine “Must Haves” Key Staff Minimization of Highest Risks (safety, security, etc?) Assess Trade-offs: Typical Trade-off Pro Con Multiple locations Best capabilities Communication, cost, control Experienced Staff Reliability, quality More expensive Less experienced staff Less expensive, future capability More oversight required Small Business supplier Company requirements, goals Cost, Quality?

Example Result Security Oversight Safety Oversight Reporting Design Key Technical Lead Design Support from Lead's Division Security Build Best Mfg. Facility Small Business Suppliers Safety, Security Evaluate Best Test Facilities Project Manager Use of “Best” resources assumes availability and capability to meet schedule and cost requirements

Developing the Cost Proposal Cost data must meet procurement requirements Organization, format, level of detail, completeness Cost data should be related to tasks, schedule More details on cost estimating will be covered in this Course Will see a “Bottoms Up” and a “Top Down” Approach Costing should reflect your win strategy $ $

Organizing the Proposal From a Customer’s Instructions for Preparing Proposals* From a Customer’s Evaluation Criteria* From the Scope Of Work* *See “Proposals: On Target On Time” for examples and tutorial, pages 25-31 Link is on ARA Intranet,

Summary Good planning for a program Begins at the marketing phase Helps the client develop requirements based on client needs and available contract capabilities During the proposal phase must address management approach to accomplish effort based on: Technical Approach Staffing Qualifications and Availability Risk Assessment Proposed approach provides basis for project plan