TSB–88 For Public Safety LTE.  Proposal: release documents in phases ◦ First release:  Basic LTE coverage modeling and verification concepts such as.

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

The Business Analyst and the SDLC
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
CS 411W - Notes Product Development Documentation.
Don Wells Hess Corporation
Network Design and Implementation
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Cumulative Impacts James Slider November 7, 2013.
LTE Coverage Design and Performance Verification
HIT241 - Project Scope Management Introduction
Jump to first page STATISTICAL INFERENCE Statistical Inference uses sample data and statistical procedures to: n Estimate population parameters; or n Test.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Speaker name Title Project Kick-Off Requirements and Process Review.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Release & Deployment ITIL Version 3
Project Management – The Project Charter
Construction Industry Development Board development through partnership Procurement procedures and quality 2b.
Developing Enterprise Architecture
RUP Requirements RUP Artifacts and Deliverables
Introduction to ISO New and modified requirements.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Overview – Implementation Context – Implementation Scope – Implementation Timeline – Keys to Success – Questions.
1 Phases in Software Development Lecture Software Development Lifecycle Let us review the main steps –Problem Definition –Feasibility Study –Analysis.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Software Requirements Engineering: What, Why, Who, When, and How
Audit of predetermined objectives Presentation: Portfolio Committee on Economic Development March 2013.
SacProNet An Overview of Project Management Techniques.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Presented by CIDA on behalf of the Task Team on Multilateral Effectiveness.
Project Methodology May 2, System Development Life Cycle Overview.
Work Package Controls Inception Phase Review February 5th, 2010 Johannes Gutleber PR a-JGU, February 5th, 2010 J. Gutleber 1 R. Gutleber.
Normal Distribution.
TSB–88 For Public Safety LTE.  Focus on basic LTE coverage modeling and verification definitions and procedures ◦ Tile reliability ◦ Service area reliability.
1 ACSF Test Procedure Draft proposal – For discussion OICA and CLEPA proposal for the IG Group ACSF Tokyo, 2015, June Informal Document ACSF
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
Chapter 12 The Network Development Life Cycle
In-depth Review: Measuring the Information Society and Statistics on Science, Technology and Innovation Ian Ewing Deputy Australian Statistician.
1 Cassidian Air Systems ASD/AIA S3000L Steering Committee (S3000L_SC01) – Paris, GIFAS S4000M – History of development.
Kigali Independent University
19th January 2012 Don Wells (Hess)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Project Management – PTM721S
WORK BREAKDOWN STRUCTURE
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Demand Control Field Trials
Wholesale Market Reform
Quality Management Systems (QMS)
Development Projects / Analysis Projects / On-site Service Projects
Enterprise Content Management Owners Representative Contract Approval
Electrical Engineering
Overview of Project Management
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Guidelines for the Evaluation of Radio Transmission Technologies (RTTs) for IMT-2000 (Overview of Recommendation ITU-R M.1225) Jose Costa Chairman, Canadian.
Copyright © Simon Wallace
Student Name: Student Id: Supervisor’s Name:
Interpretation of Confidence Intervals
Estimating the Value of a Parameter Using Confidence Intervals
Submitted by the experts of OICA
PSS verification and validation
Overview of Project Management
GL8 (R) – Stability testing for medicated premixes
Presentation transcript:

TSB–88 For Public Safety LTE

 Proposal: release documents in phases ◦ First release:  Basic LTE coverage modeling and verification concepts such as tile reliability, service area reliability, data rate channel performance criterion, etc.  High-level overview of additional key LTE concepts  Significant benefit in defining these basic coverage modeling and verification concepts  e.g. industry conversations have revolved around questions like “what is LTE coverage”, “what do you measure to validate LTE coverage”, etc.  Focusing on key concepts will accelerate document development and delivery 2

 Front matter ◦ Forward, introduction, scope statement, and references  Definitions and abbreviations ◦ Key LTE coverage modeling definitions such as Data Rate Channel Performance Criterion (DRCPC), Tile Reliability, Covered Area Reliability, Service Area Reliability, etc. 3

 LTE Technical Performance Definitions and Criteria ◦ Scope for First Document Release  Service Area  Data Rate Channel Performance Criterion (DRCPC)  Contour Reliability  Tile Reliability  Tile-Based Area Reliability  Subscriber Distribution  Traffic Models and Loading  Need to relate model load to field validation load  Resource Block Sharing 4

 Front Matter ◦ Forward, introduction, scope statement, and references  Definitions and abbreviations ◦ Key LTE coverage verification definitions such as Data Rate Channel Performance Criterion (DRCPC), Number of Test Tiles, Tile-based Area Reliability, Validated Service Area Reliability, etc. 5

 Performance Confirmation ◦ Validated Service/Covered Area Reliability ◦ Determination of Number of Test Tiles (Outdoor Only) ◦ Estimate of Proportions ◦ Pass/Fail Test Criteria  The “Greater Than” Test  The “Acceptance Window” Test ◦ Confidence Level ◦ Confidence Interval 6

 Size Constraints & Accessibility ◦ Outdoor ◦ Tunnel ◦ Indoor ◦ Accessibility  Treating Anomalous Tiles  In-Building Recommendations  LTE Coverage Acceptance Testing ◦ Traffic Load Emulation Procedures ◦ Data Rate Measurement Procedures 7