DISTRIBUTED Multi-nodal ATFM Operational Trial project

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Regional RAIM Prediction System – Progress Report
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Traffic Management and FUA integration
Pan regional ICD for AIDC structure and status (SP/09)
Information Management The ICAO Perspective
33rd APEC Transportation Working Group Tokyo, Japan October Key Outcomes of the Asia-Pacific Regulators’ Meeting April 2010, Singapore.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues Summary of the Outcomes of the 17th Cross Polar Trans East.
AFI Comprehensive Implementation Programme (ACIP), in cooperation with AFCAC and other stakeholders, to organize Pan African Training Coordination Conferences.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
ATM Implementation Support by ICAO APAC RSO
Integrating information towards Digital ATM Mini Global Demonstration Presented By: Thien Ngo Date:August 28, 2013.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Introduction to PBN Seminar ICAO PBN Implementation 1.
APEC Seminar on Practical Measures to Manage Aviation Emissions John Doherty Australia.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
Regional ATFM in Europe
Why Cross-Border ATFM? A Singapore’s Perspective
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
Presented to: NWS Aviation Weather Users By: Danny Sims, Manager of Traffic Flow Management Weather Programs, FAA Date: 18 November 2008 Federal Aviation.
CANSO Role in ATFM/CDM in APAC
Distributed Multi-Nodal ATFM Operational Trial
Title 36pt Georgia Subtitle 24pt Georgia Italics Presentation Information Arial Narrow 24pt Survey of Aviation Emissions Management Measures Ted Milczarek.
Overview of the Draft Regional Framework for Collaborative ATFM
Ministry of Land, Infrastructure, Transport and Tourism Seamless ATM in North & East Asia Hiromu HAYASHI ATC division, JCAB THE EIGHTH MEETING OF THE INFORMAL.
Analysis-Oriented View for Cross-Border ATFM. CONTENTS PAGE Chapter1 Issues Chapter 2 Response Chapter 3 Summary.
ASIA PACIFIC Air Traffic Flow Management
APAC Cross Border ATFM Initiatives
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
Federal Aviation Administration 1 Collaborative Decision Making Improving Air Traffic Management Together…
Global and Regional Planning for AIM Transition
The Global Voice of ATM Building ATM Capacity in the Middle East.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Introduction to UNEP/ UCCEE Project on Capacity Development for CDM Asian Institute of Technology, Thailand 27 Nov Hanoi, Viet Nam.
Legislative reform for disaster risk management (DRM) in Viet Nam.
A European Community Contribution to World Aviation Safety Improvement
Collaborative Decision Making (CDM) Saulo Da Silva
ATM Implementation Support by ICAO APAC RSO
Users’ Perspective of PBN Achieving Improvements
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
SIP/2012/ASBU/Nairobi-WP/19
COLLABORATIVE DECISION MAKING CONFERENCE
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
Mini Global Demonstration
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
the International Civil Aviation Organization
OPTIFRAME : Project Overview
Regional RAIM Prediction System – Progress Report
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
OptiFrame WP1: Project Management
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
ATFM IMPLEMENTATION IN INDIA – PROGRESS THROUGH COLLABORATION
Airport-ANSP Growth & Efficiency ACDM-CATFM
Nikola Ivanov, Fedja Netjasov, Radosav Jovanovic
Workshop on the operation of CRVS
CANSO Role in ATFM/CDM in APAC
Workshop on preparations for ANConf/12 − ASBU methodology
Traffic Management and FUA integration
Presentation transcript:

DISTRIBUTED Multi-nodal ATFM Operational Trial project Civil Aviation Department , Hong Kong China EATMCG/8 (Hong Kong, China, 21-22 May 2015)

Flow Control Traditional ATFM Measure Difficult to optimize Difficult for Airline Operators to anticipate delay Need to explore better method EATMCG/8 21-22/05/2015 Hong Kong China

Existing ATFM Implementations NMOC ATCSCC ATMC CAMU Airservices Australia EATMCG/8 21-22/05/2015 Hong Kong China

Existing ATFM Implementations High percentage of domestic traffic Single authority Unlikely to regulate international traffic Hong Kong,Singapore-100% international traffic Centralized Regional ATFM Centre ?? New ATFM Operation Concept EATMCG/8 21-22/05/2015 Hong Kong China

Tripartite CDM/ATFM Project (2012-2013) New Caledonia No information provided ATFM Ops Trial based on Distributed Multi-Nodal CDM/ATFM Concept

Multi-Nodal CDM/ATFM Network ANSPs form ATFM nodes Communication and Information Sharing Network Include Airline and Airport Operators EATMCG/8 21-22/05/2015 Hong Kong China

For concept illustration purpose only HONG KONG VHHH VMMC SANYA ZGSY ZJHK HO CHI MINH VVTS VVNB VVDN MANILA RPLL RPLC RPLI RPVK RPVI RPVM BANGKOK VTBS VTBD VTCC VTSM VTSP VTUD For concept illustration purpose only KUALA LUMPUR WMKK WMKP WBKK WBSB SINGAPORE WSSS WSSL CANBERRA YSSY YMML YBBN YPPH YPAD YPDN JAKARTA WIII WADD WARR

Structure inside an ATFM Node ATFMU Web Airport ATC/AO/AU Tel AFTN Email ATCC

Responsibility of ATFMU Airport ATC/AO/AU

Responsibilities of ATFMU Monitor the arrival capacity/demand balance of the airports under its jurisdiction Produce and disseminate ATFM Daily Plan (ADP) Apply GDP at the airport with C/D imbalance Calculated Take-Off Time(CTOT) EATMCG/8 21-22/05/2015 Hong Kong China

CTOT Calculation Demand Prediction CTOT ----- Balancing Capacity Prediction Demand Prediction, Capacity Prediction, When/how to balance, how to calculate the CTOT, there can be different ways to do these tasks With a system, we can have live traffic updates, we can handle a large amount of data and make a better decision. We can still do something without a system, e.g. I may use statistical data to analyze what will happen if one of the runway is blocked, what can be done from the ATFM perspective. So as to develop a contingency procedure taking advantage of the ATFM mechanism established in the region. Being lack of a sophisticated system, the CTOT list may not be long enough to solve the whole event, but still can relieve the situation. Each State may have different pace in these parts

Dissemination of Information ATFMU Web ATC/AO/AU Airport Tel AFTN Email ATCC ICD ATFMU Web ATC/AO/AU Airport Tel AFTN Email ATCC

Communication inside an ATFM Node ATFMU Web ATC/AO/AU Airport Tel AFTN Email ATCC

Operation Trial Phase 1: Distributed ATFM for Airport Arrival Constraints (Jun 2015 – Jun 2016) Stage 1: CTOT Communications (Jun – Sep 2015) Ensure proper CTOT communication flow among ATFM Nodes and stakeholders Stage 2: CTOT Adherence (Oct 2015 – Jan 2016) Initial ATFM operations under scripted scenarios with provisions of addressing ad-hoc demand-capacity imbalance Stage 3: Advanced CTOT Management (Feb – Jun 2016) More complex ATFM operations including CTOT revisions, cancellation and improvements Phase 2: More Advanced Distributed ATFM Consider airspace constraints

ATFM Network Capability Map Level 3 China Hong Kong China Singapore Thailand Level 2 Malaysia Level 1 Australia Cambodia Indonesia Viet Nam Advisory Australia

L3 China ATFM Node ANSP: CAAC ATMB AIRPORT: ZJSY ZJHK ZGGG ZGSZ AIRLINES: CHINA SOUTHERN

L3 Hong Kong ATFM Node ANSP: Hong Kong CAD AIRPORT: VHHH AIRLINES: CATHAY PACIFIC

L3 Singapore ATFM Node ANSP: CAAS AIRPORT: WSSS AIRLINES: SINGAPORE AIRLINES

L3 Thailand ATFM Node ANSP: AEROTHAI AIRPORT: VTBD (L2) VTBS VTCC (L2) VTSP VTSG (L2) VTSM (L2) VTUD (L2) AIRLINES: BANGKOK AIRWAYS NOK AIR THAI AIRASIA THAI AIRWAYS THAI LION AIR THAI SMILE AIRWAYS

L2 Malaysia ATFM Node ANSP: DCA MALAYSIA AIRPORT: WMKK AIRLINES: AIR ASIA MALAYSIA AIRLINES

Operation Trial Phase 1: Distributed ATFM for Airport Arrival Constraints (Jun 2015 – Jun 2016) Stage 1: CTOT Communications (Jun – Sep 2015) Ensure proper CTOT communication flow among ATFM Nodes and stakeholders Stage 2: CTOT Adherence (Oct 2015 – Jan 2016) Initial ATFM operations under scripted scenarios with provisions of addressing ad-hoc demand-capacity imbalance Stage 3: Advanced CTOT Management (Feb – Jun 2016) More complex ATFM operations including CTOT revisions, cancellation and improvements Phase 2: More Advanced Distributed ATFM Operation Consider airspace constraints

ATFM Ops Trial Plan for Stage 1 Test telecommunication and conferencing framework Trial on web-portal for information dissemination Stakeholder familiarization of web-portal Monitor effectiveness of demand prediction FPL submission and ICAO message handling Determine and declare AAR in ADP(WX) Practice capacity adjustment based on stackholders input(Rwy Maintenance,Inspection,Staffing,Fltchk) Generate,transmit,receive ADPs Perform Capacity/Demand Balancing Transmit, receive CTOT Teleconference between local and regional stakeholders EATMCG/8 21-22/05/2015 Hong Kong China

Objectives Validate the multi-nodal ATFM concept Establish information sharing and communication mechanism Establish common business rules for ANSPs, Airport and Airline Operators Identify the requirements of systems to support the ATFM operation Identify the capabilities required for stakeholders to participate in the operation EATMCG/8 21-22/05/2015 Hong Kong China

ICAO ATFM/SG ATFM/SG Decision 4/1: Asia Pacific Regional ATFM Concept of Operations and timeline: That, the Asia Pacific Air Traffic Flow Management Steering Group: Adopts the Multi Nodal ATFM Concept of Operations as the foundation for the Regional Concept of Operations/Implementation strategy for regional cross border ATFM implementation; and Confirms 8 November 2018 as the target date for regional cross border ATFM implementation, for inclusion in the performance objectives of the Regional Framework for Collaborative ATFM, in alignment with ASBU and the APAC Seamless ATM Plan. EATMCG/8 21-22/05/2015 Hong Kong China

The Way Forward The outcome may be a good reference for other administrations in the region The model could be a solution to address EATMCG Task List Item 7-1,which also align with ICAO ATFM SG decision. Once the multi-nodal ATFM operational procedures are sufficiently refined, Hong Kong would like to invite the ANSPs in North East Asia to gradually progress in the same direction. EATMCG/8 21-22/05/2015 Hong Kong China

Thank You! EATMCG/8 21-22/05/2015 Hong Kong China