NERC BAL Frequency Response Reliability Standard

Slides:



Advertisements
Similar presentations
Future Ancillary Services (AS) Workshop
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
WECC JSIS April System Events 3 March 24, 15:37 – Alberta Separation March 30, 10:20 – 1,600 MW generation loss in WAPA CM, including.
Frequency Responsive Reserve Process Update
WECC Reliability Based Control Field Trial
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
BAL-002-WECC-1 Contingency Reserves
FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.
WECC-098 Gov Droop DT May 29, BAL Requirements R1. Each Frequency Response Sharing Group (FRSG) or Balancing Authority that is not a member.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
NERC Operating Committee Activities Update September 16-17, 2014 Meeting.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Impact of Variability on Control Performance Metrics James D. McCalley Harpole Professor of Electrical & Computer Engineering Iowa State University 1.
The Model Validation Story 1. You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid.
Western Regulation Usage and Pilot Program Results 1.
Shawn Davis Regional Policy and Operations Analyst Portland General Electric Proposed Mid-C Scheduling Changes August 20, 2014 Interchange Scheduling and.
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
WECC Joint Synchronized Information Subcommittee
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
BAL Reserve Sharing Group
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Frequency Response WECC Frequency Response Obligations Robert W. Cummings NERC Director of Reliability Initiatives and System Analysis WECC Operating Committee.
WECC and NERC Protection Criteria and Standards
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Overview of Revised Ancillary Services (AS) Framework Proposal
Draft 2015 WECC Budget Standing Committee Meetings March 25-27, 2014.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
Page 1 Slides for FR Technical Conference Office of Electric Reliability September 2010.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
Overview of Project Reliability-Based Control Dynamic Transfer Capability Task Force January 31, 2011.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
NERC: Essential Reliability Services
The Model Validation Story
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Kenneth Silver Los Angeles Department of Water & Power
WECC-0118 Removal of Interchange Authority
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Western Electricity Coordinating Council
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
Western Electricity Coordinating Council
Rates & Regulatory Updates
James Wells – PWG Chair May 25, 2018
James Wells – PWG Chair May 25, 2018
Western Electricity Coordinating Council
Standards Review Subcommittee Update
WECC Joint Synchronized Information Subcommittee
Steve Rueckert – Director of Standards
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
Palo Verde-COI RAS Retirement
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
Standards Review Subcommittee Update
NERC Planning Committee Update
Presentation transcript:

NERC BAL-003-1 Frequency Response Reliability Standard

Regulatory Landscape WECC NERC Initial efforts to develop a Frequency Response Standard started in early 2000’s WECC FRR White Paper was approved in 2004 Two attempts to develop a WECC FRR Criterion failed in late 2000s NERC FERC Technical Conference on Frequency Response in 2010 NERC Frequency Response Initiative led to the development of NERC BAL-003-1 Frequency Response Standard FERC approved BAL-003-1 Reliability Standard, implementation date is April 1, 2015

NERC-BAL-003-1 Reliability Standard Objectives: To require sufficient Frequency Response from the Balancing Authority (BA) to maintain Interconnection Frequency within predefined bounds by arresting frequency deviations and supporting frequency until the frequency is restored to its scheduled value To provide consistent methods for measuring Frequency Response and determining the Frequency Bias Setting

Frequency Response Amount

NERC-BAL-003-1 Reliability Standard Design Event:

NERC-BAL-003-1 Reliability Standard FA FB FC FA = pre-disturbance frequency (average from -16 to 0 sec) FB = settling frequency (average from 20 to 52 sec) FC = minimum (nadir) frequency

NERC-BAL-003-1 Reliability Standard FA FB

NERC-BAL-003-1 Reliability Standard Delta Frequency:

NERC-BAL-003-1 Reliability Standard Western Interconnection Frequency Response Obligation is 907 MW per 0.1 Hz Frequency Response Measure is calculated by dividing the amount of resource loss by frequency difference between points A and B

Western Interconnection Performance Red dots – frequency response measured at point B (settling) using NERC FRM methodology Blue diamonds – frequency response is measured at point C (nadir)

Western Interconnection Performance Red dots – frequency response measured at point B (settling) using NERC FRM methodology Blue diamonds – frequency response is measured at point C (nadir)

Western Interconnection Performance June 14, 2014: West Wing event – sequential loss of more than 4,000 MW in Arizona, including simultaneous trip of three Palo Verde generators Frequency dropped close to UFLS levels of 59.5 Hz

Western Interconnection Performance October 8, 2002: AC RAS gen.drop of 2,908 MW, larger than the design event Frequency drop to 59.6 Hz, above UFLS levels of 59.5 Hz

Western Interconnection Performance May 30, 2013: PDCI faults triggered PDCI RAS gen.drop of 2,895 MW, larger than the design event Frequency drop to 59.69 Hz, well above UFLS levels of 59.5 Hz

Western Interconnection Performance May 26, 2014: PDCI Converter 1 failure triggered PDCI RAS gen.drop of 2,826 MW, larger than the design event Frequency drop to 59.66 Hz, well above UFLS levels of 59.5 Hz

Frequency Response Analysis Tool (FRAT) Developed under BPA guidance by PNNL Development is co-funded by US DOE and BPA Received high reviews from NERC Resource Subcommittee Presented at CIGRE and IEEE conferences Database of events going back to 2008 Baselining frequency response for interconnection and BA Compliance reporting

BA Frequency Response Measure Calculation FA FB FC PINT_B PINT_A BA FRM = (PINT_B – PINT_A + BA GEN LOSS) / ( FA – FB)

BPA Balancing Authority Performance BPA BA FRO is about 81 MW per 0.1 Hz, BPA BA performance is about 290 MW per 0.1 Hz