Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May 2015 1 CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Interface issues on Super-FRS magnets test at CERN CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang Meeting for Super-FRS magnets test.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Interface issues on Super-FRS magnets test at CERN
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Interconnection work for the the QRL cryogenic extensions Ivo Slits - AT/CRI
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Dimensions, pressures and temperatures of cryogenic circuits for the SPL U. Wagner TE-CRG.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Overview of the ESS Linac Cryogenic Distribution System
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Summary of discussions
Design ideas for a cos(2q) magnet
SPL RF coupler: integration aspects
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Magnet cryogenic system update.
Roadmap for triplet cryostats
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
HFM Test Station Main Cryostat
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
LARP Vertical Test Facility
Status of the PANDA Magnet
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Mechanical calculations of the CDS key elements
(vertical cryostat, Gersemi)
The 11T cryo-assembly: summary of design and integration aspects
Block 4 and Cluster D - Safety
Cryostat design Mechanical design: Thermal screens: Specifications:
Summary of discussions
ESS elliptical cryomodule
PANDA The conceptual design of the control Dewar
Presentation transcript:

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang, Holger Kollmus, and GSI Result from a Design Study with Cryotherm GmbH on the Cryo-Interface for SuperFRS-Magnet Testing at CERN Mid-term meeting with and pre-final documents from F. Carovani and J. Singavarapu from Cryotherm GmbH on two technical solutions for the SFRS Cryoline-Cryostat Interconnection * Introduction * Concepts of the Two Proposed Designs * Mechanical Aspects * Reaction Force Calculations (Cool-Down) * Safety Valves * Pressure Drop Calculations * Thermal Analysis (Heat In-leak) * Summary & Outlook

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May SFRS Cryo-Interface: Introduction Situation: Hydraulics and mechanics of the cryo-magnet-interface need to be specified and communicated to CERN, so that they can - design and tender their cryo feed boxes - design and tender their jumper connections  Reminder: GSI-CERN Committee Meeting  Deadline: Next Committee Meeting CSCY Action: Industry Design-Study on the SFRS Cryo-Interface : Kickoff Meeting with Cryotherm : Offer from Cryotherm for Design Studies on 1) Jumper-Line, and 2) Feedbox : Order of item 1) by GSI : Mid-term review: Cryotherm visit at GSI : Delivery of design report and all documents

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May JumperLine: Goals for the Design Study Goals for the external study at Cryotherm: Suggest a JL Design fulfilling the desired mechanical, hydraulic, and thermal specs: +/-20 mm installation tolerance minimize forces on cold mass and FB keep heat in-leaks low enough keep pressure drop (cool-down) low enough coupling and dimensioning of the cryostat (and shield-lines) safety valves

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: General Concept Open and Close Sliding Jackets for Cutting and Welding ClosedOpen

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: General Concept Contents of Design Study: Design of Jumper-Line as such until vacuum barrier to feed box (similar to KIT, Fermilab) Suggestion of two different options in terms of alignment and shrinkage compensation via hoses Concept for process lines and SV line in cryostat Calculation/estimation of reaction forces onto cold mass during cool-down and feedbox due to loss of vacuum Pressure drop and heat in-leak calculations Sizing for LHe-vessel and shield-line safety valves Open Spacer

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Option 1 Two bellow systems for installation tolerance (2x20mm) Sliding jackets to access the process lines for welding 50 K shield moves within vacuum tube on wheels He process lines are fixed transversally within spacers, but can slide longitudinally via ‘noses’ in spacers Rigid spacers slabs (G10) can slide within shield on wheels Flexible hoses on process lines compensate for vacuum bellows and for thermal contraction Flexible 90° hoses within knee take up thermal contraction Vacuum barrier towards feedbox Closed Jackets

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Option 2 One bellow system for installation tolerance (20 mm) - further away from magnet Flexible hoses on process lines compensate for vacuum bellow and for thermal contraction Closed Jackets Shield piece flexibly connected via six thermal straps Fixed vertical part of jumper line, fix-flanged to feed box

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Mechanical Tolerances Option 1: - Two pairs of bellows: 2 times +/- 20 mm - One 90 deg hose, two 0 deg hoses Option 2: - One pair of bellows: 1 time +/- 20 mm - Two 0 deg hoses

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Reaction Forces LHe vessel (cold mass): Option 1: Zero (horizontal hoses) Option 2: 721 N = (621(A)+43(B)+57(C)) N Feed-Box (5 kN, insulation vacuum loss) Option 1: no problem Option 2: no problem Cool-down shrinkage in dome ( mm) 3.5 mm 0.5 mm Safety Relief (11 kN, insulation vacuum loss) 15 kg/s He mass flow (no MLI) Vacuum enclosure pipeline strong enough No data from suppliers (Witzenmann) on force compensation of hoses

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Safety Valve Concept Central vertical relief line in dome Two flexible hoses for thermal compensation Relief line outside dome parallel to floor, parallel to beam line if possible Actual calculation of reaction forces, e.g. during He blow-off, cannot be calculated by Cryotherm, since the hose producer, Witzenmann, does not provide the corresponding force-response data for the hoses when bending.

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: Safety Valve Sizing SV dimensioning according to AD 2000-A2 LHe vessel: 6 kW/m 2, 33 m 2  mass flow at 20 K: 10 kg/s  discharge diameter: 50 mm  mass flow from spec: 15 kg/s  discharge diameter: 62 mm Shield line (80K): 0.5 kW/m 2, 40 m 2  mass flow at 100 K: 1 kg/s  discharge diameter of 24 mm Discharge Line (19 bar * 3% = 0.57 bar) 15 kg/s: DN 125, ∆p = 173 mbar 10 kg/s: DN 100, ∆p = 298 mbar

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Cryotherm Design: ∆p (Cool-Down) CERN specification: Max.: 5 bar Current design value: 1.3 bar (magnet) / 400 mbar (JL) Option 1: ~ 570 mbar in addition to 1.3 bar Option 2: ~ 400 mbar in addition to 1.3 bar

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Crytherm Design: ∆T, Heat In-Leak Current design value: 22 W on shield (50 K), in total 1280 W for the whole SFRS (58 JLs) 1.0 W (+ G10 spacer contribution  GSI) on LHe (4.5 K), in total 58 W + spacers for the whole SFRS Heat Load at 80 K Shield MaterialHeat Load at 4.5 K

Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May Summary and Outlook Summary on the Jumper Connection Design Major Aspects of SFRS cryo jumper connection mechanical design done - process lines within jacket fixed via wheel-spacers (2 v, 2 h) - two vertical and two horizontal bellows for mechanical tolerances - one corresponding vertical and horizontal flex. hose on each process line to compensate for the external bellows internally - for each process line one 120 degree ( ) flex hose in the 90 degree knee of the jumper the thermal contractions during cooldown Outlook We will obtain the final documents (report, drawings, step files,...) this week. We still can ask questions. DONE NEXT Cryostat-internal piping design and safety valve connection. Mechanical stress on cold mass due to cool-down and He-loss calculated. Pressure loss calculations, thermal calculations, and safety valve sizing have been done. Cryotherm suggests to go for option 2.