RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
STATUS OF ASME CC N-755 & N-808 Frank J Schaaf, Jr Sterling Refrigeration Corp NESCC Meeting Washington DC 18 April 2013.
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
ASME SMR ROADMAP (STP-NU-072)
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Engineering Technology Division
Pipeline Personnel Qualification
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Status of ANS Standards Presented to NESCC 3/1/2011 Donald J. Spellman Vice Chair, ANS Standards Board.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
Tripartite Meeting Beijing, 1 November 2005 IMO GBS Classification Society’s View about the Scope, Verification Process and Acceptance Criteria Roberto.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
Envision Product Design King Street Anchorage, Alaska Code Requirements For Weld Inspections with CMOS Digital X-ray ASNT Fall Conference.
Tim Haeberle API SC Winter Meeting
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
Introduction to ISO New and modified requirements.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
U.S. DOE Light Water Reactor Sustainability Program: Advanced Instrumentation & Controls and Human System Interfaces Research Pathway Bruce Hallbert, Idaho.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
NQA-1 Evolution 2008 – 2015 Mike Nicol DOECAP ASP Workshop Sept
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Hull Survey for New Construction Z23 (July 2006) John Finch Chairman IACS expert group on the Hull survey for New Construction September 2006.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
MODULE B - PROCESS. ASME C&S Training Module B1 DATESLIDECHANGE 10/31/03 17, 19, 20, 21, 22 & Notes, 23 & Notes 33 & Notes 36 Notes 41 Notes 44 References.
Diablo Canyon NPP Risk-Informed In-service Inspection
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 Safety factors for periodic safety review for research reactors Group A: SF1 – SF4.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
© National Fire Protection Association. All rights reserved. NFPA Consensus Standards at Work What is NFPA 59A and how does it apply April 12, 2016 Guy.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
CODES FOR VESSELS/HEAT EXCHANGERS Avinash Nayak. (46) Shrikantkumar Padhy (47) Jitendra Patil (48) Manoj Patil (49) Ganeshprasad Pavaskar (51)
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
Nuclear Codes and Standards Needs in Argentina ASME Nuclear Codes and Standards Overview April 2016 Buenos Aires, Argentina Ryan Crane Oliver.
Nuclear Codes and Standards Needs in Argentina International Working Groups April 2016 Buenos Aires, Argentina Ryan Crane Oliver Martinez.
Instructor: Lloyd Hancock
Status and Prospect of Korean Korea Electric Power Research Institute
Third Party Activities for FH1 Project
Flooding Walkdown Guidance
NRC CM Pilot Inspections Methodology and Results
Traceability of Gas Pipeline Materials Research & Materials Manager
Ageing Management Session Name: Principles of Ageing Management
TRTR Briefing September 2013
Presentation transcript:

RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION CORP ASME NUCLEAR CODES & STANDARDS RELIABILITY AND INTEGRITY MANAGEMENT (RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION CORP 1 NESCC Washington DC November 3, 2014

2 Disclaimer This presentation is the intellectual property of Frank Schaaf, the comments made are his alone and are not an ASME official position.

AGENDA 3  Background Review  RIM (Reliability and Integrity Management)  SBC ( System Based Code)  Update Progress (last year)  Conclusion

BACKGROUND 4 PHILOSOPHY OF SECTION XI The philosophy of Section XI is to mandate a sufficient number of examinations and tests (selected deterministically) to provide assurance that the original safety that was designed and built into the plant is maintained throughout it’s service life. L.J. Chockie (1975) Chair, Section XI

5 VISION FOR ASME NUCLEAR CODE Load and Resistance Factor Design (LRFD) Cold piping Hot piping Current classification Plant PRA insights Current risk criteria Risk-Informed Design Direct use of plant PRA Develop risk criteria Piping application Other components ASME III Code Cases Life-Cycle Process/ System-Based Code ASME III Code Changes 2-3 years3-5 years5-10 years Risk-Informed Safety Classification Review and adapt risk-informed safety classification Code Case N-660 for repair/ replacement to ASME III design ASME Code Case Plant PRA Prior ASME Research & Code Risk- Informed Work ASME Section XI Risk-Informed ISI Risk-Informed RRM ASME O&M Risk-Informed IST Other ASME Nuclear C&S

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) Reliability and Integrity Management (RIM) : Those aspects of the plant design process that are applied to provide an appropriate level of reliability of SSCs and a continuing assurance over the life of the plant that such reliability is maintained. These include design features important to reliability performance such as design margins, selection of materials, testing and monitoring, provisions for maintenance, repair and replacement, pressure and leak testing, and In- service Inspection (ISI). 10

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) Step 1 Determine Scope of SSCs for RIM Program Step 2 Evaluate SSC Damage Mechanisms Step 3 Determine Plant and SSC Level Reliability and Capability Requirements Step 4 Evaluate RIM Strategies to Achieve Reliability Targets Step 5 Evaluate Uncertainties in Reliability Performance Step 6 Determine Scope and Parameters of RIM Program Step 7 Monitor SSC Reliability Performance and Update RIM Program 11

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) SYSTEM BASED CODE CONCEPT 12

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) SYSTEM BASED CODE CONCEPT 13

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) SYSTEM BASED CODE MODEL 14

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) SYSTEM BASED CODE MODEL Need for new PRA Standard 2006 – Non-LWR PRA Standard created, includes ; Design Element Level 1, 2, and 3 Elements Multi-units on same site ISI & NDE Methods 2013 – Non-LWR PRA Standard, Approved for Trial-Use 15

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) 16

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) ASME, SECTION XI, DIVISION 2 SCOPE All reactor types (water, gas, metal, salt) All reactor sizes Target reliabilities for passive SSCs Evaluate consequences of SSC failure Flexible Inspection Intervals Examination Strategies development Repair/Replacement & Maintenance 17

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) ASME, SECTION XI, DIVISION 2  RIM-1000 SCOPE AND RESPONSIBILITY  RIM-2000 RIM PROGRAM  RIM-3000 EVALUATION & STANDARDS  RIM-4000 REPAIR/REPLACEMENTS  RIM-5000 SYSTEM PRESSURE TESTS  RIM-6000 RECORDS  RIM-9000 GLOSSARY 18

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) ASME, SECTION XI, DIVISION 2 APPENDICISES 1. Plant Type (Water, Gas, Metal, and Salt) 2. Mandatory Appendix I – NDE Strategies Appendix II – U.S. Administrative Requirements Appendix III – Owner’s Reports (Program Activities ) Appendix IV – Qualification Program for NDE Appendix V – Catalog of NDE Examination Requirements 3. Non-Mandatory TBD 19

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) 20

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) 21

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) 22

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) UPDATE IN LAST YEAR Development of NDE Strategies Appendix Development of NDE Qualification Appendix (Procedures and Personnel) 23

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) UPDATE IN LAST YEAR Development of NDE Strategies Appendix 24

25

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) UPDATE IN LAST YEAR Development of NDE Qualification Appendix Totally Performance Based Procedures and Personnel Performance demonstration use use Section V, Article 14 Performance demonstration establishes the ability of a specific examination system (i.e. equipment, procedures and personnel) to achieve a desirable level of performance i.e.. risk reliability. 26

RIM (R ELIABILITY AND I NTEGRITY M ANAGEMENT ) SSC CLASSIFICATION No Classification required All passive SSC in RIM Program RIM Program developed by Owner ASME would not reference another organization's document For construction would use NRC documents 27

CONCLUSION Hoping NuScale will become pilot plant RIM publish in 2017 edition of Section XI Questions 28