LCRA Highland Lakes Watershed Ordinance

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Storm Water Management
Clean Water Its Everybodys Business. From a distance we might get the impression that our planet has an unlimited supply of clean water available to use.
Major Sources of Nonpoint Source (NPS) Pollution and Best Management Practices (BMPs) By: David Wojnowski, Stream Watch/Project WET Coordinator Stream.
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Potomac Ridge Stormwater Management Project
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Karst Initiatives/Storm Water Management in Berkeley County Brian Hopkins, Ph.D., P.E. Berkeley County Engineering Department.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Env 247 Overview of Stormwater Management March 1, 2011.
Nutrient Management in Developing and Agricultural Areas A presentation to the West Metro Water Alliance Chris Meehan, P.E. May 25, 2011.
Managing the Environmental & Project Development Process StormwaterManagement.
RETROFITTING EXISTING SWM PONDS BETTER THE SECOND TIME AROUND Lise Soukup, P.E. Environmental Engineer City of Rockville, Maryland.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
How do Wetlands Factor into New Infiltration Policies?
IMPACTS OF LAND DEVELOPMENT ON OREGON’S WATERS 2001 This slide show was borrowed from the internet but we added our own research when we presented it.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Impacts of Land Development on Oregon’s Waters 2001.
Comprehensive Planning for Lake and Stream Protection Brie Begiebing Water Resources Specialist Portland Water District.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
2005 RWQPP Initiative Related Travis County Implementation.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Bear River Cathy Lee CE 296 B Spring 1998 Assignment #4.
Stormwater Rain and melting snow Collected by storm drains and flows into streams, rivers, lakes.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Implementing Post-Construction Stormwater Controls Greg Davis, EPA Region 8.
Managing Shoreline Properties Your name here. Water Cycle.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
From the Beginning Design Standards and Other Post-Construction Program Elements.
STORM WATER STORAGE AND TREATMENT
Stormwater Commitments Categorical Exclusion Training Class.
Balancedgrowth.ohio.gov Case Studies in Implementation: Best Local Land Use Practices Chris Riddle, Ohio Lake Erie Commission Kirby Date, AICP, Cleveland.
A New Approach to Protecting Water Quality in Gallatin County through Better Site Design Tammy Crone, Water Quality Specialist.
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
Watersheds. Key Terms 1.Watershed 2.Drainage basin 3.Floodplain 4.Deposition 5.Runoff/storm water runoff 6.Point-source pollution 7.Nonpoint-source pollution.
Putting It All Together: Selection and Application of Low-Impact Development BMPs.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Article VIII: Post Construction Best Management Practices Presented by Jennifer Boyer DuPage County DEC.
City of Clarksville Storm Water Management Manual Revisions 2014.
Preventing and Reducing Pollution From MS4 Activities
Hudson Wetlands Protection Bylaw
NHDES Alteration of Terrain Program
Anne Arundel County Maryland
Stormwater Commitments
Water Quality Protection Zones
Kickoff example Create a new file
Intro MIDS Calculator Use
Presentation transcript:

LCRA Highland Lakes Watershed Ordinance Performance Standards Overview

How Does Stormwater Pollution Affect Our Waterways? Siltation of creeks and reservoirs Reduced fish and wildlife habitat Algal blooms and fish kills Increased growth of aquatic weeds Reduced recreational opportunities because of bacterial contamination Contamination of food and water sources Construction-generated sediment changes the character of runoff from natural conditions– existing soils are pulverized by mechanical action of rock saws, hydraulic rams, construction traffic. Top soils and subgrade materials may be imported or moved within the site; Top soils are removed, often leaving poor mineral soils on the surface. The landscape and hydrology is changed by the addition of pollutants including fertilizers, pesticides, oil/grease, metals. Impervious surfaces gather these pollutants between rainfall events and discharge them to waterways during rainfall. Quarry and Mine Activities often have similar characteristics.

HLWO Jurisdictional Area Travis County (Lake Travis Watershed) Llano County (portion) Burnet County (Colorado River Watershed) Total Area 1,172 sq. mi.

What is regulated? Development (single family, subdivisions, multi-family, and commercial) that adds more than 10,000 sq. ft. of impervious cover or disturbs more than 1 acre of land Mine or Quarry projects that create more than 10,000 sq. ft. of impervious cover or disturb more than 5 acres of land Utility line construction and maintenance Dredge and Fill Standards (No permit required) Exemptions No Permit Required

HLWO Performance Standards Performance Standards Minimum Requirements Pre-development Planning Meeting with LCRA staff to review project Water Quality Management Plan showing drainage layout and BMP design information Buffer Zones Plan showing buffer zones for creeks, and buffer zone protection measures Construction- Phase Construction-phase erosion control plan with Erosion and Sediment details and specifications Control Water Quality Education Contact LCRA to initiate education program

Permanent BMPs to Manage Hydrology and Water Quality Design objective – manage Streambank Erosion and Stormwater Pollutant Removal by intercepting and treating a water quality volume Design Storm – 1 year, 3 hour – 1.93” BMP Suites- primary and secondary BMPs Primary BMPs (water quality basins) Secondary BMPs (filter strips & infiltration devices) BMPs placed in series to manage channel erosion and treat runoff quality Pollutant removal performance – remove 70-75% of TSS, TP, oil and grease

Permanent Water Quality Basins Bioretention basins (stand – alone) Extended detention basins* Sand filters* Wet ponds (stand-alone with vegetated bench) Wetland basins Retention – irrigation (stand – alone) Infiltration systems (secondary only) *must be combined with a secondary BMP

Marble Falls – Edwards Offices Stand-alone bioretention basin Vegetated filter strip for driveway

Marble Falls – RSC Equipment – ED pond with secondary bioretention

Questions ?? Contacts LCRA Watershed Engineering & Planning 512-473-3200 Ext. 2324 Supervisor: Erik Harris, P.E. Ext. 2091 Permit Review: Adam Boatright, P.E. Ext. 4080 Dean Thomas, P.E. Ext. 2892 Inspections: Supervisor: David Williams Ext. 3597 Mark Neuman – North Ext. 2518 Brian Box - South Ext. 3303 Melissa Gabriel –Maintenance Ext. 2838 www.lcra.org Go to “Water” then “Quality”, then select “Watershed Management Ordinance”