Issues associated with Integrating Transport and Environmental Models Presenter Richard Bradley, Technical Director, Transport Planning, Mouchel.

Slides:



Advertisements
Similar presentations
Options appraisal, the business case & procurement
Advertisements

Sources and effects of bias in investigating links between adverse health outcomes and environmental hazards Frank Dunstan University of Wales College.
Feedback Loops Guy Rousseau Atlanta Regional Commission.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Experiments and Variables
for Traffic Forecast Analysis, London | TIS.PT – Transportes Inovação e Sistemas, S.A. Slide 1 | 29 Transportes, Inovação e Sistemas,
The Use of Differential Speed-Flow Curves in SATURN.
GIS and Transportation Planning
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Correlation and Regression
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
HEADS UP H urricane E vacuation A nalysis and D ecision S upport U tility P rogram.
Subarea Model Development – Integration of Travel Demand across Geographical, Temporal and Modeling Frameworks Naveen Juvva AECOM.
GEOG 111 & 211A Transportation Planning Traffic Assignment.
Freight transport modelling - an approach to understand demand and use of transport energy Annecy, May 26th, 2008 Ole Kveiborg and Jean-Louis Routhier.
Spring INTRODUCTION There exists a lot of methods used for identifying high risk locations or sites that experience more crashes than one would.
Noise Mapping For The Environmental Noise Directive WHAT IT MEANS FOR SCOTLAND Dr Bernadette McKell, October 2006.
Lec 20, Ch.11: Transportation Planning Process (objectives)
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
Design Speed and Design Traffic Concepts
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
Performance Management (Best Practices) REF: Document ID
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
The three levels of operations strategy process
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Project: Model Integration Options Greg Erhardt DTA Peer Review Panel Meeting July 25 th,
Network and Operational Planning
©2009 Proprietary and Confidential DTA in practice: Modeling dynamic networks in the real world Michael Mahut, Ph.D. INRO Montreal, Canada.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
1 Validation & Verification Chapter VALIDATION & VERIFICATION Very Difficult Very Important Conceptually distinct, but performed simultaneously.
ITEC224 Database Programming
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
Modeling & Simulation: An Introduction Some slides in this presentation have been copyrighted to Dr. Amr Elmougy.
Computers in Urban Planning Computational aids – implementation of mathematical models, statistical analyses Data handling & intelligent maps – GIS (Geographic.
NTERFACING THE MORPC REGIONAL MODEL WITH DYNAMIC TRAFFIC SIMULATION INTERFACING THE MORPC REGIONAL MODEL WITH DYNAMIC TRAFFIC SIMULATION David Roden (AECOM)
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER 13: Operation Analysis.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
25 June 2009, London Impact significance in air quality assessment Application of EPUK criteria to road schemes?
Overview Freight Modeling Overview Tianjia Tang, PE., Ph.D FHWA, Office of Freight Management and Operations Phone:
Highway Risk Mitigation through Systems Engineering.
HELIOS: Household Employment and Land Impact Outcomes Simulator FLORIDA STATEWIDE IMPLEMENTATION Development & Application Stephen Lawe RSG Michael Doherty.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical Specialist.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
FDOT Transit Office Modeling Initiatives The Transit Office has undertaken a number of initiatives in collaboration with the Systems Planning Office and.
Non-Motorised User (NMU) Audits Overview presentation Hertfordshire Highways Cycling Scrutiny Panel 14 th & 16 th October 2009.
Formulating a Simulation Project Proposal Chapter3.
Congestion Charging and Air Quality in central London 12 November 2004 Charles Buckingham Monitoring Manager, Congestion Charging Division, Transport for.
Chapter 10 Verification and Validation of Simulation Models
1 Model Calibration John M. Broemmelsiek ITS / Traffic Operations US DOT / FHWA Louisiana Division
1 He Says vs. She Says Model Validation and Calibration Kevin Chang HNTB Corporation
Chapter 12 The Network Development Life Cycle
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
2015 ABNMS Conference Application of Bayesian Networks in Urban Growth Models © 2015, Sizztech Pty Ltd.
Generated Trips and their Implications for Transport Modelling using EMME/2 Marwan AL-Azzawi Senior Transport Planner PDC Consultants, UK Also at Napier.
Highway Risk Mitigation through Systems Engineering.
A Framework and Methods for Characterizing Uncertainty in Geologic Maps Donald A. Keefer Illinois State Geological Survey.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
Jim Henricksen, MnDOT Steve Ruegg, WSP
Chapter 10 Verification and Validation of Simulation Models
Network Screening & Diagnosis
Problem 5: Network Simulation
Calibration and Validation
2009 Minnesota MPO Conference August 11, 2009
KEYNOTE STAGE SPONSOR.
DESIGN OF EXPERIMENTS by R. C. Baker
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
SIMULATION IN THE FINANCE INDUSTRY BY HARESH JANI
Presentation transcript:

Issues associated with Integrating Transport and Environmental Models Presenter Richard Bradley, Technical Director, Transport Planning, Mouchel

Talk Content Talk based on recent experience for HA Managed Motorways Transport modeller’s view Overview of processes involved Issues encountered when integrating models How the procedures may be improved

Traffic Modelling & Appraisal Traffic model required to model impact of scheme and for scheme appraisal Predict scheme impacts in terms of flows, speeds, and numerous traveller choices Macro models using aggregations and approximations based on mathematical relationships HA models tend to cover large regional geographical areas and complex choice Outputs used for economics, environment, and operational assessments Primary focus on the Treasury and providing robust value for money assessment that considers traffic growth uncertainty Investment decision tends to be Pass or Fail (does scheme pay for itself?)

Air Quality Modelling & Appraisal Environmental appraisal a legal requirement AQ models rely on traffic model outputs AQ screening criteria specified in DMRB: - Road alignment change >= 5m - Daily traffic flows change >= 1,000 AADT - HGV flows change >= 200 AADT - Daily average speed change >= 10km/hr - Peak hour speed change >= 20km/hr A ssessed by link and aggregated by direction EU upper limit for nitrogen dioxide (NO2) concentrations of 40 microgram’s per cubic metre (of air) Detailed screening thresholds used

Scheme Programme Implications Exceedence thresholds based on traffic flow and speed, particularly sensitive to HGVs AQ screening requires traffic outputs from Do-Minimum and Do-Something Complex nature of traffic model and inaccuracy can lead to unanticipated exceedence locations Detailed model development defined through screening AQ monitoring data can take up to 6 months to collect (> model accuracy) Inconsistency found between traffic model and AQ model Traffic and then AQ modelling programme critical Significant upfront public cost for planning and design at risk while AQ investigated

Integration Issues A. Model Specification – issues related to how the traffic models are developed which can make them incompatible with AQ analysis B. Model Interpretation – issues related to how the data produced by traffic models is interpreted and used in the AQ modelling process C. Accuracy and Uncertainty – general issues relating to the quality of the data produced by a traffic model

A. Model Specification Issues

A1. Model Area Geographic model coverage allows for: - strategic re-routeing impacts of interventions - potential for alternative destinations - ensure full lengths of trips Little consideration of AQ issues Spatial model detail concentrated in Area of Interest or simulation area Environmental assessment therefore also limited to the simulation area But AQMAs can span simulation boundary Large areas may require outputs from two traffic models that are not consistent

A2. Traffic Model Validation Traffic models interested in origin–destination movements and journey routes Validation criteria checks translation of origin–destination trips to link flows Journey time criteria based on routes Neither guarantee accuracy at the link level

A3. Lack of Network Detail Network chosen to include significant roads and allow correct routing Links can often be missing approaching junctions No data collected for missing links Local validation issues where links missing

A4. HGV Modelling AQ modelling is very sensitive to the volume and speed of HGVs HGV modelling is notoriously difficult with poor observed data and logistics not modelled New guidance moving away from link calibration for HGV Separate journey time validation for HGVs difficult in existing software packages

A5. Network Data Small variations in centreline distance can cause significant error in the AQ modelling process Road network definition different between traffic and AQ models particularly at junctions Some older models represent links as straight lines between nodes Significant effort to translate from traffic model to AQ GIS format AQ model data requirements can change between organisations T-Junction Roundabout

A6. Queuing Approximations Traffic models approximate queues as a vertical stack with no spatial representation. 10 kph 90 kph Vertical Queuing – Upstream link not affected Blocking Back – Upstream link affected 30 kph

A7. Convergence Large strategic models in congested areas = detailed convergence issues = ‘model noise’ AQ models are very sensitive to small changes in flow and speed caused by ‘model noise’ ‘Warm Start’ convergence issues Warm Start: Same Starting PointWarm Start: Different Starting Point

B. Model Interpretation Issues

B1. Direction Aggregation Traffic model by direction BUT AQ aggregate of direction Direction 1 – Link Flow = 1000 Direction 2 – Link Flow = 1000 Total 2way – Link Flow = 2000 Do Minimum Direction 1 – Link Flow = 500 Direction 2 – Link Flow = 1500 Total 2way – Link Flow = 2000 Do Something Direction 1 – Link Speed = 50kph Direction 2 – Link Speed = 50kph Total 2way – Link Speed = 50kph Direction 1 – Link Speed = 90kph Direction 2 – Link Speed = 10kph Total 2way – Link Speed = 50kph

B2. AQ Model Verification AQ model observed and modelled concentrations provides a ‘Verification Factor’ Verification factors > 1 overestimates differences between DS and DM concentrations Base YearForecast Year DMForecast Year DS A verification factor of 2 calculated in the base year representing unobserved effects Verification Factor applied and exceedence found Verification Constant applied and exceedence removed A verification constant of 15 calculated in the base year representing unobserved effects

C. Accuracy and Uncertainty Issues

C1. Validation Coverage Regional traffic models have many thousands of links - M3M4 Model has 19,000 links in the simulation area Traffic counts available for M3M4 on 1,400 links Only 85% of these 1,400 have to reach the validation criteria There are 17,600 links in the model where we have no direct check Journey times (and speeds) have limited number of journey time surveys It is impractical to observe flow and speed on every link in the model

C2. Uncertainty In Model Flow Observed count of 50 HGV, a modelled flow of between 21 and 92 would give a GEH statistic of less than 5 = validated HGV count is +/- 28% = count of 50 could lie between 36 and 64 If HGV count = 36 then a flow of 12 HGVs = validated If HGV count = 64 then a flow of 110 HGVs = validated AQ exceedences can be caused by an additional 8 HGVs

C3. Uncertainty in the Forecast model Traffic forecasts complex: GDP growth, population growth, values of time, etc Each of these forecast assumptions will have a degree of un-quantified uncertainty associated with them A traffic model is usually based upon a hierarchy of different choices each of which will have been calibrated against observed data Each calibration sits within a range of acceptable elasticities Different levels of calibration would provide different forecasts

General Improvements Improve understanding between traffic and AQ modellers Improve the combined modelling process Improve interface between traffic and AQ models Improve understanding of error in forecasts Wholesale refinement in traffic modelling unlikely Timescale or costs in developing more complex models unaffordable

Traffic Modelling Improvements Provide an early warning of likely locations of AQ issues to start monitoring early Increase key model details and reduce reliance on averages Do not supply data outside of simulation area boundary In the vicinity likely AQ problems - increase data collection - increase network detail - improve validation Smooth queues and allocate junction delays to the upstream links Better definition of network centrelines – common network data Ensure consistency between adjacent traffic models More sensitivity tests to improve range of link data

Air Quality Modelling Improvements Use traffic information ‘as is’ and by direction Reduce verification factors, increase variables and consider better ways to calibrate Check significance of traffic model flow to count – pivot off counts Reduce the emphasis on detailed thresholds using more sensitivity tests Increase emphasis on relative difference between DM and DS Only consider scheme opening year (when traffic forecasts most accurate) Be realistic and explain the weaknesses in the model to end users

Statistical Improvements Develop statistical methods to describe the uncertainty of traffic model forecasts and estimate an error distribution Monte Carlo simulation Determine the probability of exceedences occurring Would the level of uncertainty discredit forecasts How would this traffic uncertainty be translated into AQ modelling uncertainty