LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center.

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
7 January 2005 MDI Workshop M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V.
LC Calorimeter Ideas and R&D Opportunities Ray Frey, U. Oregon Cornell, Apr 19, 2002 Physics implications The environment The “energy flow” concept Current.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
R Frey 9/15/20031 Si/W ECal Update Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4 Ray Frey M. Breidenbach, D. Freytag,
7 June 2006 SLAC DOE Review M. Breidenbach 1 KPiX & EMCal SLAC –D. Freytag –G. Haller –R. Herbst –T. Nelson –mb Oregon –J. Brau –R. Frey –D. Strom BNL.
Design Considerations for a Si/W EM Cal. at a Linear Collider M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
NIU Workshop R. Frey1 Reconstruction Issues for Silicon/Tungsten ECal R. Frey U. Oregon NIU Workshop, Nov 8, 2002.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
ICLC Paris R. Frey1 Silicon/Tungsten ECal for SiD – Status and Progress Ray Frey University of Oregon ICLC Paris, April 22, 2004 Overview (brief) Current.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
PFA Development – Definitions and Preparation 0) Generate some events w/G4 in proper format 1)Check Sampling Fractions ECAL, HCAL separately How? Photons,
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
ITBW07 R. Frey1 ECal with Integrated Electronics Ray Frey, U of Oregon Ongoing R&D Efforts: CALICE silicon-tungsten ECal – 2 parallel efforts:  Technology.
SiD Cal R. Frey1 Some EGS Studies… Compare with Geant4  Questions of range/cutoff parameters EM Resolution understood? Moliere radius – readout gap relation.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
R Frey SiD at SLAC1 SiD ECal overview Physics (brief) Proposed technical solutions: silicon/tungsten  “traditional” Si sensors  MAPS Progress and Status.
Why silicon detectors? Main characteristics of silicon detectors: Small band gap (E g = 1.12 V)  good resolution in the deposited energy  3.6 eV of deposited.
1 Si-W ECal with Integrated Readout Mani Tripathi University of California, Davis LCWS08 Chicago Nov 17, 2008.
High Energy Beam Test and Simulation of Silicon-Tungsten Calorimeter Test Module Shinwoo Nam (Ewha Womans University) On behalf of Ewha Womans University:
1 LumiCal Optimization and Design Takashi Maruyama SLAC SiD Workshop, Boulder, September 18, 2008.
Roger Rusack – The University of Minnesota 1.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
Silicon-Tungsten EM Calorimeter R&D
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
R Frey SiD ECal at ALCPG071 SiD ECal overview Physics requirements Proposed technical solutions: silicon/tungsten  “traditional” Si diodes  MAPS LOI.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
1 R&D Advances: SiW Calorimeter LCWS 2010 Beijing SiD Concept Meeting March 28, 2010 John Jaros for SiD SiW Group (thanks to Ray, Ryan, Mani, and Marco.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
R Frey LCWS071 A Silicon-Tungsten ECal with Integrated Electronics for the ILC -- status Currently optimized for the SiD concept Baseline configuration:
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
EMCal Sensor Status (* M. Breidenbach*,
Silicon/Tungsten ECal for the SD Detector – Status and Progress R. Frey U. Oregon UT Arlington, Jan 10, 2003.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
A Forward Calorimeter (FoCal) as upgrade for the ALICE experiment at CERN S. Muhuri a, M. Reicher b and T. Tsuji c a Variable Energy Cyclotron Centre,
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
ECAL EUDET MODULE Summary talk
Hybrid Pixel R&D and Interconnect Technologies
SiD Calorimeter R&D Collaboration
A SiW EM Calorimeter for the Silicon Detector
detector development readout electronics interconnects bump bonding
ILC Detector Activities in Korea
SiD Electronic Concepts
A Silicon-Tungsten ECal for the SiD Concept
Simulation study for Forward Calorimeter in LHC-ALICE experiment
SiD Tracker Concepts M. Breidenbach
Signal processing for High Granularity Calorimeter
Dual readout calorimeter for CepC
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
LC Calorimeter Testbeam Requirements
Why silicon detectors? Main characteristics of silicon detectors:
Presentation transcript:

LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center R. Frey, D. Strom U. Oregon LCWS2002, Jeju Island, Korea August 28, 2002 SD Detector

LCWS2002 R. Frey2 SD designed for excellent energy flow performance – with well-understood and somewhat constrained costs (see Snowmass Orange Book for details) Si/W ECal  5 T ; R in = 1.27 m  5mm transverse segmentation  [ 2.5 mm W (0.7 X 0 ), 0.3 mm Si ] x30 Not optimized !  R m = 9mm (1 + gap(mm)/2.5) → Keep gaps small ! In this talk: Detector/Frontend architecture and considerations Current R&D Still working on overall mechanical design Plans

LCWS2002 R. Frey3 SD Si/W 5x5 mm 2 pixel  50M pixels Do NOT scale electronics by this number For each (6 inch) wafer:  1000 pixels (approx)  One readout chip (ROC) Simple, scalable detector design:  Minimum of fab. steps  Use largest available wafers  Detector cost below $2/cm 2  Electronics cost even less  A reasonable (cheap?) cost

LCWS2002 R. Frey4 Wafer and readout chip Use bump-bonding technique to mate ROC to array of pads on wafer

LCWS2002 R. Frey5 Silicon detector layout considerations DC coupled detectors are simple (cheap)  Use AMPLEX-type preamp design  OK as long as leakage currents small and stay small  Straightforward layout uses two metallization layers (OK) Possible to try one for R&D ?  Get (fast) trigger signal from common back side  Pixel-readout trace crosstalk ≈ 1% AC coupled also possible  Avoid inputting leakage current to preamp  More complicated Complete additional network (hard) Additional layer and vias Cap. breakdown Beware hierarchy of capacitances

LCWS2002 R. Frey6 Readout channel Dynamic range: MIPs to Bhabhas  About factor 2000 range per pixel  Want to maintain resolution at both ends of scale  Demand S/N of 7 for MIPs  Satisfy with 2 overlapped ranges G1/G2 ≈ bit ADC  Need C ≈ 10 pF (big) Approx. same as pixel cap. Additional 10 pF cap. for calib. Shaping time about ns One additional channel per chip for fast common trigger signal Expect noise of 300 e rms (GLAST) Detailed design in progress

LCWS2002 R. Frey7 Radiation EM radiation dominated by Bhabhas (in forward endcap)  dσ/d  ≈ 10 pb/  3 for t-channel  Consider 1 ab -1, 500 GeV, shower max., and  =60 mrad (worst case) Use measured damage constant (Lauber, et al., NIM A 396)  ≈6 nA increase in leakage current per pixel  Comparable to initial leakage current  Completely negligible except at forward edge of endcap Currently evaluating potential neutron damage A 300 GeV electron shower into a readout chip?  “Linear Energy Threshold” (LET) is 70 MeV/cm 2 /mg  Expect no such problems

LCWS2002 R. Frey8 Heat Does integrated design imply fancy cooling system? Consider: NLC duty cycle is 5x10 -5 (5x10 -3 for TESLA) 270 ns bunch trains at 150 Hz  Use power pulsing of the electronics For example, GLAST-equivalent readout would produce only about 1 mW average power per 1000-channel chip Assumes power duty cycle of … this factor is an important R&D item Current proposed scheme:  Heat conduction thru thick (6 oz) Cu layer in G10 m-board to fixed temperature heat sinks at edges of ECal modules   T ≈ 1ºC Requires R&D to demonstrate

LCWS2002 R. Frey9 Putting together a layer

LCWS2002 R. Frey10 Gross System Architecture Silicon Diode Array Readout Chip Network Interconnect

LCWS2002 R. Frey11 Plans Procure full-wafer (6” for now) detectors with complete layout  QC, verify crosstalk, SNR, etc.  Test in 5 T Simulations: optimize segmentation and longitudinal sampling Design and produce first readout chip Bump bonding trials Design and build full 1-wafer wide module  Power pulsing and thermal management Test beam  Electrons/photons and hadrons (together?)  Check vs simulations Mechanical structure Cost optimizations  Silicon  Readout  Tungsten

LCWS2002 R. Frey12 Summary A highly granular Si/W ECal would be very nice at the LC !  Expect excellent EFlow jet reconstruction  Photon reconstruction (non-pointing; flavor id. of jets)  “Imaging calorimeter” for MIPs, photons, had. showers An integrated design makes this feasible  If not cheap, at least not crazy Requires answers to key R&D issues over next ≈ 2 years  Silicon configuration  Readout chip  Cooling and mechanics  Test beam