Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.

Slides:



Advertisements
Similar presentations
Strategy and Project Management in the Academic Setting What best practices from industry can be applied within the academic setting?
Advertisements

PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
Designing and Developing Decision Support Systems Chapter 4.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
Development Processes and Product Planning
Systems Engineering Management
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Process, Communication, and Certification Padma Venkata
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
CSULB EE400D Documentation Instructional Series
Planning. SDLC Planning Analysis Design Implementation.
Remedy, a BMC Software company Storyboarding the User Interface: Blueprint for an Application Shanaz Kanga | Michele Sarko Sr. UI Design Engineer | Manager,
Delivering a Planning Services Engagement Software Assurance Planning Services.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Mobile Apps: Review and Retrospectives Refresher Agile Transformation Team 1.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
Welcome to your music business. So what do you need to do to get started? PLAN & ORGANISE Otherwise you may never get started and even if you do, the.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
Software Engineering Management Lecture 1 The Software Process.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Effective Meetings Quick Refresher. 10 Best Practices for Effective Meetings Draft an agenda & send out approximately 48 hours in advance Recap time-sensitive.
Efficient Meetings Cassandra Groen BSCE ‘09 MSCE ‘11 Research Engineer II Industrial Engineering South Dakota School of Mines and Technology Thursday,
Detailed Design & Component Selection. Detailed Design Phase Portion of the engineering design process where the engineering team can completely describe.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Request for Proposal (RFP)
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
10 Aug 2010 ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT Meeting #2.
ECE398: The Design Review Fall What the Design Review is  Board meeting with engineers- (faculty, TA, classmates)  Structured discussion of your.
Problem-Solving Meeting Foundations
ESSRT Status Report as of July 31, 2013
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
T Iteration Demo Tikkaajat [PP] Iteration
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
What has been accomplished at the end of MSD 1 & 2?
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Information Sharing for Integrated Care A 5 Step Blueprint.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Fall CS-EE 480 Lillevik 480f06-l7 University of Portland School of Engineering Senior Design Lecture 7 Functional specifications Technical meetings.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Office 365 Security Assessment Workshop
CS 325: Software Engineering
EPICS Conceptual Review Template Notes:
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Request for Proposal (RFP)
Guidance notes for Project Manager
Portfolio, Programme and Project
Preliminary Detailed Design Review: P18001
Presentation transcript:

Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful Design Review Logistics –Materials for review –Optimized review structure (time) –Running the review –Actions / Issues / Decisions –Documentation Weeks 5 & 9 MSD I reviews (distributed to accomplish goals) Templates

Design Reviews.2 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Review Objectives Design reviews take significant time… why do them? Key Objectives: –Technical review of system and / or sub-systems to confirm meet Functionality, Robustness, Engineering Specifications and Customer Needs –Cross-disciplinary review to ensure optimized system solution –Documentation to comply with Product Development Process and support Design History File Result: –Catch mistakes at the design stage –Save money on debug, iterations, expedite fees –Product meets specifications and customer needs –Team coherence on design and a better product

Design Reviews.3 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Participants for a Successful Review Who should be included in design reviews and does it depend on the stage of development? Disciplines to consider: –Electrical Engineering –Mechanical Engineering –Software / Computer Engineering –Manufacturing –Marketing (represents Customer) –Regulatory / Quality –Project management –Other departments (e.g. molecular biologists) Always invite all representatives. Require attendance based on stage of development and topic of review. Team owns this!

Design Reviews.4 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Logistics – Running a Successful Review Materials – distribute before the review –Relevant Specifications –Detailed design drawings, schematics, simulations, flow charts, test plans, etc. –Known issues, discrepancies with specifications, conflicts with other disciplines –Agenda with timeline by discipline Structure – review by discipline and subsystem Running the Review - may be held on different dates –Start on time and stay on schedule (project or engineering manager) –Not a formal Presentation  Round table approach –Focus on improving the design (no personal attacks) –Individual (not design engineer) responsible for documentation –Cover everything! If run out of time… schedule more time!

Design Reviews.5 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Logistics – Running a Successful Review Actions / Issues / Decisions fully documented –Action items for changes, items to check, functionality changes, etc. –Issues for specification and discipline conflicts that need to be escalated, or longer term changes not implemented this Rev. –Decisions about design approach, specification changes, trade-offs, etc. Documentation –Meeting minutes including attendance, reference to materials covered, reference to actions / issues / decisions list (if not integrated) –Need documented closure on all actions before completing the next design step –Add to Design History File (including copies of materials reviewed)

Design Reviews.6 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T System Design Review (Week 5) Concept update System level architecture Identification of high risk areas of design with focus on technology Modeling / simulations / breadboard results demonstrating risk mitigation for high risk areas of design Guide-specific requirements

Design Reviews.7 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T System Design Review (Week 5) Participants –All appropriate team members –Guide plus Faculty / Staff consultants (team responsibility to invite) –Team members from related projects within track –Students with relevant technical expertise –Balance group size with required participation Materials –Hardcopy of agenda, all drawings, schematics, specs, modeling and simulation results, etc. –All materials on laptop –Physical prototypes if available –All materials distributed prior to the meeting

Design Reviews.8 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Review Structure / Execution –1-2 hours (good planning to optimize resource time commitment) –Can break into multiple reviews distributed over days / weeks –Clearly stated goals and objectives with list of materials to be reviewed –Be prepared to articulate risks and mitigations based on proof of concept prototype activities (linked to specifications) –Highly technical review  be quantitative!! –Project manager (or other designate) runs review Documentation –Meeting notes required with Actions / Issues / Decisions (use template) –Project manager (or other designate) responsible –All materials and notes to Design History File Schedule another review if required!! System Design Review (Week 5)

Design Reviews.9 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Detailed Design Review (Week 9) Participants: Same as previous review Materials: Same as previous review plus BOM Review Structure / Execution –2+ hours (good planning to optimize resource time commitment) –Likely need multiple reviews to cover all subsystems  distribute –Clearly stated goals and objectives with list of materials to be reviewed –Highly technical, quantitative review of all aspects of design –Be prepared to articulate detailed analysis of designs –Review of specifications (line-by-line) to ensure design adequacy –Review of BOM against budget and schedule –Project manager (or other designate) runs review Documentation: Same as previous review

Design Reviews.10 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Templates Agenda template Meeting notes template Both available in Word format on Mycourses