Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.

Slides:



Advertisements
Similar presentations
Title Slide – Technology or Company Name
Advertisements

Team SYNERGY in Partnership with Parker PGI
PLANNING CHECK LIST: have you got:
Corner Rounder Capstone Team Melissa Anders Andrew Dillon Joshua Schmidt Matt Kirtley Team Members: Faculty Advisor: Huafen Hu.
Dr. Parmigiani, This is Will Rogers. I had a couple of your classes most recently senior design (Autonomous Underwater Vehicle). The company I'm working.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
MATLS 4Z06 Industrial Projects MSE Capstone Course Joey Kish (Coordinator) Monday, April 29, 2013.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Team Members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
Mission Statement Devise a solution to minimize the vibration propagated from the pump system, through the steel frame, and to the surrounding workplace.
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
Vacuum Pump Vibration Isolation System Winter 2011 CONCEPTS’ EVALUATION REPORT Sponsoring Company: Edwards Vacuum LtdEdwards Vacuum Ltd. Contact Engineers:
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
Design Project Management
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Construction Project Management
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
TQM TECHNIQUES BENCHMARKING Target key areas for improvement within operations – Increase productivity, competitiveness, and quality – Quality results.
September 20th TJ Faculty Presentation 2006
Design Project Management Design Project Managers Identify tasks Make and update plans Sequence tasks Allocate time Allocate People and Resources Monitor.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Intel ® Robotic Tablet Charger Presenters Hung Nguyen Kevin Hughes Group Members Garrett Pauwels Justin Carey Nolan Igarashi Richard Mullenburg PSU Faculty.
Intel ® Robotic Tablet Charger Presenters Garrett Pauwels Justin Carey Group Members Hung Nguyen Nolan Igarashi Richard Mullenburg Kevin Hughes PSU Faculty.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Project management Topic 4 Starting up a project.
Axle Temperature Control Product Design Specification Design Team Mike Erwin Emery Frey Boun Sinvongsa Lee Zimmerman PSU Faculty Advisor Dr. Lemmy Meekisho.
PRODUCT DESIGN & PROCESS SELECTION. Product & Service Design The process of deciding on the unique characteristics of a company’s product & service offerings.
Maslow’s Hierarchy of Needs Bloom Taxonomy  What is a taxonomy?  History Benjamin Bloom headed educational psychologists 1956 (revised in 1999/2000.
Course Instructor Professor Clark J. Radcliffe Office hours: MWF 11:30-12: EB ME 481.
Tata McGraw CHAPTER 4 Product and Service Design.
ME 195A Senior Design Project Overview Prof. Buff Furman SJSU Mechanical.
TEAM ADAPTIVE REC Members Advisors Dale Calnek Jerel Hutapea Chang-Won Park Casey Radtke Academic: Dr. Sung Yi Industry: Jennifer Armbruster Todd Bauch.
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Advisor: Dr. Shangchao Lin
Prototyping and Testing of an Economizer in a Gas Cycled Chiller System Team 4 Members: Steven Hutto Breck Dorsey Kenneth Martin Brandon Van Guoxin.
Turbomachinery Flow Visualization P08453
COMPANY INTRODUCTION S & C Co., Ltd.
Powerpack Assembly Improvement Process
Please highlight one choice only
Chemical Solidification and Breakdown
Title (one line is best; two is OK)
Formula SAE Flow Testing Device
University of Idaho – Interdisciplinary Engineering Capstone Design
Flat Air Moving Device TEAM MEMBERS ADVISORS Bruk Yimesgen
Multidisciplinary Capstone Design:
Structure Account Analysis Own Position Business Development
Product Design Specifications
Team member1 Team member2 Team member3 Team member4 October 2016
Enterprise/Security Alignment Review
2007 PSU Human Powered Vehicle Team
Please highlight one choice only
The Best Contact Center Indonesia 2019
Value Engineering in a Manufacturing Facility
Cooperative & Experiential Education
Title (one line is best; two is OK)
University of Idaho – Interdisciplinary Engineering Capstone Design
Presentation transcript:

Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd. Contact Engineers: Mark Romeo Bree Edwards

 Project Background  Mission Statement  Project Plan  Customer Identification  PDS Requirements  House of Quality  Risk Mitigation  Questions

 Edwards Vacuum Ltd. is contracted by Intel Corporation to provide pumps designed for atmospheric control in sensitive microchip fabrication processes.  These manufacturing processes have a strict tolerance in the range of the nano- scale.

 There is evidence that Edward’s Vacuum pumps are a cause of unwanted vibrations, and could effect the manufacturing tools used in Intel’s microchip fabrication processes.  Edwards has a current vibration isolation plan implemented, but would like to pursue an improved product to stay at the top of the vacuum pump supply industry.

 Derive a solution to minimize the vibration propagated from the pump system, through the steel frame and to the surrounding workplace.  This solution will consist of a working prototype, supporting data, detailed drawings and a final report.

 Access to Intel Corporation’s manufacturing facility is not available. This requires that the solution derived be tested and applied at Edward’s facility.  The solution will then be applied to new systems and tested and improved by Edward’s Engineers.

Highlights of our Gantt Chart.  PDS Document- 2/9  Research- 2/21  Diagnostic Testing- 3/1  Concept Evaluation- 3/13  Detail Design- 4/10  Prototyping and Testing- 5/1  Finalized Solution- 5/22  Design Reviews- 2/21, 3/13, 5/22

 External Customers Primary- Edwards Vacuum Ltd. Secondary- Intel Corporations  Internal Customers Portland State University Faculty Capstone Courses ME 491/492/493

High Priority Requirements  Vibration Reduction- 25% (Edwards)  Clean Room Compatible (Intel)  Power Consumption- 0 Watts (Edwards)  Timeline- 5/22 (Edwards/PSU) Medium Priority Requirements  Cost- <1000$/Pump (Edwards)  Size- Must fit within frame (Intel)  Ease of Use- Totally Passive (Edwards)

 No current solution to compare to.

 Attempting to reduce the risk in the following categories