GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope:
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
EPU load – same as SIU load except…
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction Ken Fouts Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 2 Steps to Ship to NRL Phase 0 – Hardware check out –Hardware ACD FLT PDU, EM GASU, FLT Cables, EMI Skirt, no SIU/EPU –Software LATTE 4 –Exit Successful LATTE 4 CPT Phase 1 – Software check out –Hardware FLT PDU, EM GASU, 1 Flt SIU, 2 Flt EPU, VSC, Control/Pwr Racks –Software FSW, VSC, LICOS, Configuration Database –Exit Successful LICOS CPT Phase 2 – Run for the record –Hardware Full complement of flight hardware, X-LAT plate –Software Flight release of FSW, VSC, LICOS, Configuration Database –Exit Successful LICOS CPT, SVAC, E2E, Verification w/SIIS

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 3 System Test Flow FSW Release FSW Checkout FQT – Testbed Install last 4 TWRs, 16 TWR CPT Install ACD, EM GASU, PDU LATTE 4 LAT CPT, SVAC Install flt SIU / 2 EPUs, FSW Install LICOS LICOS LAT CPT, SVAC, E2E MOOT / MOOD Config Mgmt 10/25 10/17 11/18 11/25 Perf & Ops Test Plan 12/16 Install Cross- LAT Plate LICOS LAT CPT, SVAC, E2E 1/10/06 Light-tight tests/ CPT Pre Ship Review 01/20/06 VSC Full Functionality Phase 1 Phase 2 Phase 0 01/24/06 Install SIU/EPU spares,Flt GASU FSW Updates/ FQT – Testbed

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 4 LAT I&T Schedule

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 5 IRR/TRR Goals Goals for this review: Review and assess the mechanical and electrical readiness for Phase 0. Discuss plans for Phase 1 and 2. Identify additional reviews.

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 6 I&T Organization

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 7 Test Readiness Review Plan Electrical Test Readiness Review will cover: –Current Test Status What has been completed What is the plan –EGSE Hardware Configuration –Current Flight Hardware Configuration Under Test –Online Status LATTE Test Executive 16 Tower Test Scripts LICOS Status (a glimpse into Phase 1)