Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Target Paper Status Summary 21 st December 2010 Chris Booth 1.
Target Paper Status Summary 13 th December 2011 Chris Booth 1.
Development of new Mice Target Stator. (or show and tell) Rutherford Lab 13 th December 2011.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
1 Commissioning Needs MOM (m. apollonio) RUN Schedule –Dry Run –DAQ / Detectors / Target Proton Absorber –polarity inversion SHIFTERS ! Future MoM.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The Generator. Electricity Generator Energy: The ability to do work Two Examples: Mechanical Energy: Energy that comes from the motion of an object Electrical.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
IMPORTANT DATES 3 rd 6 weeks December 7: Open Note Quiz December 11: CCA Test Week 15 January 8: Unit test 1.3, 5.4, 5.5 January 15: DCA Test (major grade)
Welcome to Everybody. পরিচিতি দিলীপ কুমার পাল টেকনিক্যাল টিচার্স ট্রেনিং কলেজ ইইই বিভাগ.
API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Unit 4 Day 7: Magnetic Fields due to Wires Magnetic Field in a Straight Wire Magnetic Fields in 2 Parallel Conducting Wires, Side by Side Magnetic Forces.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Motors and Generators.
WEEK 1 You have 10 seconds to name…
Elec467 Power Machines & Transformers Electric Machines by Hubert, Chapter 12 Topic: Self-excited and compound generators, load distribution.
Focusing Lens for PXIE SSR1 Cryomodule Summer 2012 Status 7/10/2012I. Terechkine1.
Capstone Design - Personal mobility - Group name : 올라가 조 박경원 정태산 이효진 강석우.
1 MICE PM report – status of Phase II Target update Spectrometer solenoid FC & coupling coils Schedule considerations Project accommodation & management.
How Does a Wind Turbine Work?
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 2, 2003 James H. Chrzanowski.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Planning and Monitoring in Pursuit of Goals Preparation of the Body KC5.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Week 9 Presentation 1 Electromagnets 1. Learning Objectives: 1. Determine the magnitude and direction of the magnetic field strength generated by a straight.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
DC Motor For students of the second stage in the Department of Electrical Engineering Introduction by Salam Mohammed Atiyah Master of Electrical Engineering.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
CJA 454 Week 1 DQ 1 Check this A+ tutorial guideline at 454-NEW/CJA-454-Week-1-DQ-1-NEW Can a police force be prepared.
Chris Booth Sheffield 29th March 2006
BSS Prep work at CERN and Acceptance of Parts
Oversight Board Meeting October 3, 2017 Rob Michnoff
Target and Horn status report
Renovation of the 45-year old PS magnets
Procurement of Nb3Sn strand for coils assembled at CERN
ELECTRICITY & MAGNETISM Kirchhoff’s Laws (P )
Distribution of Marks & Types of Questions
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
Overall Project RAG Status:
Overall Project RAG Status:
Globus-M2 will be constructed by the end of 2015
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

Target: K. Long, 16Nov2009

Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected this week » Vespel (preferred material) expected 12 December In parallel: – Checking forces generated with mis-aligned coils using OPERA model (PS, TB): ongoing – Devising magnetic QA rig (GB + Shf): ongoing – Devising concept for winding coils that is more precise – Will be discussed at Trgt w/s 02Dec09 in Sheffield Schedule T3: – Machining of parts progressing well – Coils for T3 prepared in Sheffield: » Will consider whether to use new coils or present coils based on: magnetic analysis; Magnetic QA on T2 stator

T3 schedule: T3 schedule still looks OK: – Need to expedite ‘R&D’ work on T2#3 Which is in hand