Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.

Slides:



Advertisements
Similar presentations
Jonathan Stanton Public Health Engineer. Oil and grease Heavy Metals- lead, zinc, and mercury Nutrients- phosphorous and nitrogen Chemicals Mud and Sediment.
Advertisements

Infiltration Basins & Permeable Pavement: Examples and Lessons Learned Lene C. Hill, P.E., LEED AP CT Consultants, Inc. June 20, 2013 OhioEPA Storm Water.
Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Katie Rousseau Clean Water Program American Rivers.
1 Porous Pavement and Model Municipal Operations Center Demonstration Project Phase II Photo Document Project County of San Diego DEPARTMENT OF GENERAL.
Modeling to Support Green Infrastructure Planning Best Management Practice-Decision Support System (BMP-DSS) Application Andrew Parker Director, Water.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Cascade Charter Township
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
The DeepRoot Silva Cell Integrating Trees, Soil & Stormwater for Sustainable Development.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Reducing Storm Water Runoff on Your Homesite 6090 Wedgewood Road Medina, OH (phone) (fax) Local leadership for soil and.
Workshop for Rain Barrel Workshop Franklin County Stormwater Act 167 INFORMATION and how Rain Barrels can help ! By Nancy Cisar 3/10/09.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Low Impact Development Best Management Practices
Resourceful. naturally. Conservation Design & Volume Reduction Hanover, MN.
Rain Gardens: A proposal by the Accept the Greener Challenge Club.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Better Site Design Sustainability & Stormwater
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Stormwater Outlets Effectiveness of the Options. Stormwater Outlets Several options are available, such as the infiltration basins under the parking lots.
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
How to Do Phase II: Post-Construction Site Runoff Controls NC STATE UNIVERSITY.
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
RAIN GARDEN DESIGN CONTEST 2013 MARCH 11 TH – 27 TH.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
BPRD DISTRICT OFFICE AND RIVERBEND PARK Robin Laughlin, ALSA, RLA.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Energy PUBLIC Running Water: Effective Stormwater Quality Practices Tracy Warner, Municipal Engineer for Ames, IA Josh Shields, Landscape Architect with.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Stormwater Management for Homeowners. Where does water go?
NC Phase I Perspective Steps undertaken by Charlotte for Post-Construction Controls SC Stormwater Forum May 8, 2007.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
From the Beginning Design Standards and Other Post-Construction Program Elements.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Storm Water Runoff Storm Water Runoff
Green Infrastructure at the Campus and Watershed Scale at the University of North Carolina at Chapel Hill Carolyn Elfland, UNC Chapel Hill Sharon Myers,
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
STORM-WATER OPPERTUNITIES What is storm water Land use and change Retain and Detain Opportunities for change.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
Green Stormwater Infrastructure and Park Improvements
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
MIDS calculator Quantifies reductions in runoff volume for a given BMP or group of BMPs Quantifies reductions in phosphorus (P) and TSS runoff for a given.
Storm Water Runoff Storm Water Runoff
Where Does Storm Water Go?
Storm Water Runoff Storm Water Runoff
Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) November 18, 2018 Jay Dorsey.
Storm Water Runoff Storm Water Runoff
Kickoff example Create a new file
Presentation transcript:

Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety

Project Goals “Balance growth with the preservation of the natural drainage system.” Meet 8-year Development Plan requirements NPDES Phase II Post-Construction runoff requirements

University Growth Over next 8 years, 5.9 million square feet of laboratory, classroom, office, and student housing space will be added Bond referendum

Chapel Hill Development Plan Stormwater Requirements No increase in the volume of run-off –2 Year, 24 hour, 3.6” storm event No increase in peak runoff rates Remove 85% of suspended solids for first inch of precipitation Promise to improve stormwater practices.

Draft NPDES Phase II Post- Construction Requirements Control and treat runoff from the 1- year, 24-hour storm 85% removal for total suspended solids Side slopes no steeper than 3:1 Minimum setbacks from surface waters

Campus Watershed Meeting of the Waters Creek drainage area acres Existing impervious cover acres (49%) 8-year Development Plan impervious cover acres (50%) –Increase of 3.17 acres Volume reduction required for 2 year 3.6” storm is 138,160 cubic feet (CF)

The Problem with Pavement Increase in pavement or buildings (impervious surface) causes –More water to run off –Water to run off faster –Degraded water quality

Analysis of Best Management Practices (BMPs) UNC BMP requirements –allow stormwater to infiltrate –allow stormwater reuse –reduce runoff –fit existing landscaping (National Landmark for Outstanding Landscape Architecture by the American Society of Landscape Architects) –allow continued University growth

Infiltration Bed with Reuse Carmichael Intramural field with storage/infiltration in underlying gravel with water reuse from cistern Projected Storage = 72,000 CF Project Cost $1,105,415 Cost Benefit ($/CF) = $15.35

Pervious Pavement Infiltration through porous asphalt or concrete Campus total projected storage = 45,788 CF Campus total projected cost = $610,515 Cost Benefit ($/CF) = $13.33

Roof Gardens Low maintenance plants in light, engineered soil over a waterproof membrane Projected storage for Carrington Hall = 960 CF Projected cost for Carrington = $137, 709 Cost Benefit ($/CF) = $143.45

Completed and Proposed BMPs Five infiltration beds under fields Three pervious pavement lots Numerous tree trenches Five roof gardens One rain garden

Other BMPs Under Consideration Rain gardens Landscape conversions (lawn to fields, planting areas, reforestation) Cisterns Water quality inlets

Will We Comply? 138,160 CF volume reduction required for Development Ordinance Compliance Total projected stormwater storage volume 372,804 CF Estimated BMP cost $12,634,741

How Will We Know? Quarterly visual inspections where stormwater leaves campus Semiannual aquatic insect sampling Continuous stream flow gauge with indicator parameter monitoring – ehs.unc.edu/environmental/water_quality/

Determine your priorities Hire creative consultants –Andropogon Associates –Cahill Associates –The Rose Group Assume that there are many utility corridors that are not accurately mapped Avoiding Problems