Solutions to Chapter 3 Exercises

Slides:



Advertisements
Similar presentations
Chapter 9A Process Capability and Statistical Quality Control
Advertisements

Quality Assurance (Quality Control)
Quality And Performance Problems and Exercises
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Quality Control Methods. Control Charts > X (process location) >S (process variation) > R (process variation) > p (proportion) > c (proportion)
X-bar and R Control Charts
Statistical Process Control
Statistical Process Control (SPC)
Chapter 13 Quality Control and Improvement COMPLETE BUSINESS STATISTICSby AMIR D. ACZEL & JAYAVEL SOUNDERPANDIAN 7th edition. Prepared by Lloyd Jaisingh,
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Chapter 10 Quality Control.
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Statistical Process Control
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
MayJunJulAugSepOctNovDec2016 Milestone 1 May 10 Milestone 2 Jun 7 Milestone 3 Jul 21 Milestone 4 Aug 12 Milestone 5 Sep 20 Milestone 6 Oct 30 Milestone.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
5 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Quality And Performance 5 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Chapter 3 Lect 6 Forecasting. Seasonality – Repetition at Fixed Intervals Seasonal variations –Regularly repeating movements in series values that can.
Process Capability Process limits (The “Voice of the Process” or The “Voice of the Data”) - based on natural (common cause) variation Tolerance limits.
OPSM301 Operations Management Spring 2012
5 Day Forecast Mon Tues Wed Thu Fri.
COMPLETE BUSINESS STATISTICS
Primary Longman Elect 3A Chapter 5 Asking about dates.
Payroll Calendar Fiscal Year
GANTT CHARTS Example Example Example Example text Tasks Example 1
10 Quality Control.
Mon – 2Tue – 3Wed – 4Thu - 5Fri - 6Sat - 7Sun - 8 Mon – 9Tue – 10Wed – 11Thu - 12Fri – 13Sat – 14Sun -15 Mon – 16Tue – 17Wed – 18Thu - 19Fri – 20Sat –


QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
MON TUE WED THU
Chapter 6 Revised Homework Problems 6, 8, 10, 21.
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Process Capability.

January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Jan Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
S M T W F S M T W F
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Process Capability Process limits (The “Voice of the Process” or The “Voice of the Data”) - based on natural (common cause) variation Tolerance limits.

1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
SEESIM 14 Timeline Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2008 Calendar.
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

Solutions to Chapter 3 Exercises Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 1 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 2 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 2 continued The upward trend in cancellations and non-renewals is a definite cause for concern. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 3 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 3 concluded 1.2826 1.02 .7574 UCL * * * * * * LCL Jun Jul Aug Sep Oct Nov Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 4 Xi 3,500 4,100 3,750 4,300 4,000 3,650 Total 23,300 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 5 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 5 concluded Normally control limits are set at three sigma so any point outside the limits is to be investigated. For limits set at lower sigma values, it should be considered that there is a chance of a random point falling outside the limits even though the process is in control. For one-sigma limits the chance is 32% or one out of three points. For two-sigma limits the chance is 5%, or one point out of twenty. In our case there are 3 points out of twelve, so action should be taken, but if these had been one-sigma limits, action would be unnecessary. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 6a Day Range Sat 3 Sun 4 Mon 2 Tue 5 Wed 3 Thu 5 Sum 22 For Friday the range is 7, so the range on Friday is in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 6a concluded 9.45 3.67 UCL * * * * * * * LCL Sat Sun Mon Tue Wed Thu Fri Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 6b Day Sample Mean Sat 20.3 Sun 19.3 Mon 17.0 Tue 19.0 Wed 21.0 Thu 18.7 Sum 115.3 For Friday the sample mean is 16.7, so the process is in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 6b concluded 22.96 19.21 15.45 UCL * * * * * * * LCL Sat Sun Mon Tue Wed Thu Fri Chapter 3: Quality Management

Exercise 7 Dough Boy’s pizza crust production system is not capable of consistently meeting its customer requirements given the Cp index of less than 1. Options available to Dough Boy include improving its production system to lower the natural variation in the system. In this case, Dough Boy needs to reduce the standard deviation of pizza crusts from 1.1 to .66 or lower in order to obtain a Cp index of 1 or more. Alternatively, Dough Boy could try to convince its customers to increase the range of acceptable pizza crust diameters.

Chapter 3: Quality Management Exercise 8 The Cp index indicates that given the natural variation in the filling operation, it is capable of meeting the design specifications. However, when the alignment of the process mean and the design specification is considered, it is found that the filling operation is not capable of consistently meeting design requirements. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 9a Total number of cases = 27,400 Total incorrect = 235 Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 9a concluded .03623 .00857 0.0 UCL LCL Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 9b: Day 7 On day 7, p = .0115, therefore process is in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 9b: Day 8 On day 8, p = .0093, therefore process is in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 9b: Day 9 On day 9, p = .0123, therefore process is in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 10 X p c Mon 25 .000025 25 Tue 36 .000036 36 Wed 17 .000017 17 Sum 78 .000078 78 Avg. 26 .000026 26 Chapter 3: Quality Management

Exercise 10: Sample Means Chart A2 = 1.023; Range 36 - 17 = 19 UCL = 26 + 1.023(19) = 45.44 LCL = 26 - 1.023(19) = 6.56 Thursday’s 47 defectives is outside control limits. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 10: p chart On Thursday, p = .000047, therefore not in control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 10: c chart On Thursday, 47 are defective. Thus, out of control. Chapter 3: Quality Management

Chapter 3: Quality Management Exercise 10 concluded The c chart is most appropriate The p chart is acceptable The sample means chart is not appropriate Chapter 3: Quality Management