Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Liquid Hydrogen Absorber
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
Progress on the MICE Cooling Channel Solenoid Magnet System
Quadrupole magnets Magnet concept details have not been developed, however we plan to piggy back on the designs developed by Joel Schults ( IRE Magnet.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Focussing Absorber Magnet Elwyn Baynham ; Tom Bradshaw Iouri Ivaniouchenkov ; Jim Rochford Applied Science Division.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
MICE AFC Work Group meeting February 13, 2004 Introducing the Coat Hanger technique --- the Global reference system Wing Lau.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
MICE LH2 ABSORBER BODY Shigeru ISHIMOTO KEK OCT Non-Welding Bolt-Type Absorber.
Talk outline 1 st talk: –Magnetic forces –Quench in the absorber cryostat 2 nd talk: –Shielding of magnetic fringe fields.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.
Available thin solenoids with dimensions of about 1 m  X 1 mL with field about 1 tesla in KEK/IPNS KEK/IPNS Y.Makida 2005/March/28.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
A reminder of the outstanding action list:- Implement central repository for drawings – need detector information to add to official drawing Instrumentation.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
MICE Collaboration Meeting RAL 31 May – 3 June 2009 AFC status By Wing Lau, Oxford University.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
18 December, 2007 Analysis PC 18 Dec PIDer’s Question of Friday 14 Dec: Dear John and Marco, would you be able to give us a first preliminary ball-park.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
MICE – MUON Interface meeting at Mission Inn, Riverside, California January , 2004 MICE Cooling Channel Integration Issues Wing Lau – Oxford & Steve.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
SCU1 Vertical Test Results Matt Kasa 9/16/2014. Vertical Cryostat Assembly Coil Training Record the current decay and the terminal voltage across the.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Optimized CESR-c Wiggler Design Mark Palmer, Jeremy Urban, Gerry Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Progress on AFC Procurement T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Design ideas for a cos(2q) magnet
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
Update on PANDA solenoid design
MICE Meeting at RAL, Oct-23, 2005
On the Ground Muon Ionisation Cooling Experiment ( MICE ) – pre-cursor to a neutrino factory.
S1-G cryomodule assembly status
Question 3 The proponents should show more details about the modification of the detector system to be built in P42 Answers 3-1. Liquid-Hydrogen Target.
The 11T cryo-assembly: summary of design and integration aspects
MICE Coupling Coil Update
Additional Upstream Coil Shielding
ILC Main Linac Superconducting Splittable Quadrupole
PANDA The conceptual design of the control Dewar
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions shown on the interface drawing to both KEK and Tesla

bobbin Thermal radiation shield Magnet cryostat Large End Flange Hydrogen Absorber and the feed pipes are already made and tested. Cool down test has already started. It is not possible to make any change or modification on the pipe work arrangement on the Absorber. Spoken to Shigeru who confirmed that nothing could be done to change. The constraint from KEK: Constraint from Tesla:- Tesla needs 10mm for the extra thickness for the bobbin end plate. They also increased the gap at and thicken up the thermal radiation shield sheet metal from 2mm to 4mm. (Are these absolutely latter necessary?) Foul!! Foul between LH2 pipe and magnet cryostat !!! The design as it stands

bobbin Thermal radiation shield Magnet cryostat Large End Flange The only solution is to shift the absorber upstream by 15.4mm Solution 1

bobbin Thermal radiation shield Magnet cryostat Large End Flange Coil moved downstream by 10mm Solution 2 Tesla to agree to change the parameters as those shown in red, and MICE agree that the coil pair be moved 10mm towards the centre