View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.

Slides:



Advertisements
Similar presentations
NSF Experience with Management of Research Infrastructure
Advertisements

U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Committee on Science, Engineering and Public Policy Board on Physics and Astronomy Committee on Setting Priorities for NSF’s Large Research Facility Projects.
HEPAP SUBPANEL Synopsis of the Long Range Plan for U.S. High Energy Physics Jon Bagger / Barry Barish Presentation to HEPAP October 29, 2001.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
CLEO-c and R measurements THE CLEO COLLABORATION Albany CalTech Carnegie Mellon Cornell Florida Harvard Illinois Kansas Minnesota Oklahoma Ohio State Pittsburgh.
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
The Future of US Accelerator Science – Comments from NSF Tony F. Chan Assistant Director MPS/NSF AAAS Chicago February 13, 2009.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Systems Studies Program Peer Review Meeting Albert L. Opdenaker III DOE Program Manager Holiday Inn Express Germantown, Maryland August 29, 2013.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
Future Accelerators at the High Energy Frontier
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria July 24, 2014RECFA DESY1.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
Jefferson Lab Overview
LCC L. Evans, Santander, 2nd June 2016
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
InterActions Meeting--- October 2006 Report from Cornell
Recent Electron Cloud Studies at CESR and Future Plans
Introduction to Jefferson Lab
W. T. Weng Brookhaven National Laboratory
Yasuhiro Okada, Executive Director, KEK
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Barry Barish Paris ICHEP 24-July-10
SOLID Collaboration Meeting
International Cooperation in High Energy Physics
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008

CESR-CLEO Symposium May 31, Topics After Dave B. Charm-Tau ERL What’s next?

CESR-CLEO Symposium May 31, After D. Berley….. To follow on where Dave left: After the B-factory came on line in Oct. 1999, CESR-CLEO made very important contributions to Tau-Charm physics (more later) A few years ago (2004?), with the conclusion of its 20-year program of studies of the decays and spectroscopy of the bottom quark, the CLEO Collaboration turned its attention to the study of charm and charmonium. The National Science Foundation supported converting the Cornell Electron Storage Ring to CESR-c, including installing wiggler magnets to enhance luminosity in the charm threshold region “It is remarkable that more than 30 years after the first discovery, charmonium continues to yield new information and new challenges to elementary-particle physics, thanks to improvements in collider luminosities and detector capabilities.” (CERN Courier June 2006)

CESR-CLEO Symposium May 31, Review - I Report on the Site Visit to Wilson Laboratory for Elementary Particle Physics at Cornell University March 5-6, 2002 Executive Summary: The panel judges that 1. The proposed research program is of the highest quality and is expected to lead to significant advances in our understanding of weak interactions and lattice QCD; 2. The proposed upgrades to existing facilities are feasible, limited in scope and cost, and the schedule is well understood. In fact, the existing facilities are state-of­the-art and extremely well suited to execute the proposed program in the five-year time frame. 3. The expertise in superconducting RF technology, the operation of storage rings, and the current effort to build and operate wiggler magnets are examples of the activities needed for the development of future accelerators, such as the Linear Collider. The Cornell group is expected to become a major intellectual player in the planning, construction, and operation of this very large international facility. 4. The LEPP has an excellent record in training particle and accelerator physicists. The proposed master‘s degree program in accelerator physics would be a great addition.

CESR-CLEO Symposium May 31, Review - II Report on the Site Visit to Wilson Laboratory, Cornell University Review of the Energy Recovery Linac (ERL) Proposal March 7-8, 2002 Executive Summary: The committee strongly encourages NSF to support the ERL Phase I program. We believe that this proposal is forward looking and directed to the need for new and enabling technology that brings the possibility of fundamentally different parameters to next generation light sources.

CESR-CLEO Symposium May 31, Oversight-Reviews We do lots of oversight!

CESR-CLEO Symposium May 31, Review We were impressed by both the quality and quantity of the physics output of the CLEO-c program and we strongly endorse the proposal to continue running until March 31, The SRF work at Cornell has a tremendous potential leverage on the cost of the ILC accelerating cavities, as well as on enabling technologies that would minimize the project risks. The CesrTF has some unique advantages as a test facility for ILC storage rings LEPP has an outstanding record of contributions to accelerator physics and technology and training expert accelerator scientists and engineers. The laboratory represents a national resource for accelerator science and technology. SRF cavity R&D at LEPP directly benefits the ILC project. The Cornell Laboratory for Elementary Particle Physics has an excellent record of developing programs of education and enrichment for students in K-12. Report of the Site Review of the Cornell Laboratory for Elementary Particle Physics April 17-18, 2006

CESR-CLEO Symposium May 31, Changes

CESR-CLEO Symposium May 31, Review NSF/DOE Review of the Cesr Conversion Proposal (July 2007) Executive Summary The Panel believes that the R&D described in the CesrTA Proposal is important to mitigate risk in the ILC positron damping ring design and should be carried out. The Panel feels that Cornell’s proposal is the only one consistent with gaining the necessary information on a timescale compatible with the ILC schedule for production of an Engineering Design Report (EDR) in CesrTA also appears to be the most cost-effective option available to obtain the required data. The Cornell group’s scientific and technical knowledge is well known, and their record of achievement in accelerator physics is outstanding. We believe they will achieve the main goals of the CesrTA project, thus making important contributions to the development of the ILC, and to the understanding of how the e-cloud and other effects limit positron storage ring performance.

CESR-CLEO Symposium May 31, Conclusions We would like to acknowledge the role of our partners at DOE in: Supporting many groups active in CLEO Co-funding the future accelerator activities now underway here at Cornell In Conclusion: Congratulations from NSF to the entire CLEO collaboration on your past achievements We are looking forward to your next accomplishments