PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
MTA Installation Progress Report June 8, MTA Installation Web Page F.G. Garcia AD/Proton.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Muon Acceleration RF Workshop Welcome and Goals July 7, 2009 Alan Bross.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Beam line Experiment area SC magnet Pion production target
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
MuCool / Linac Diagnostic Beamline and MTA facility: External Beams Dept. C. Johnstone, + others Review Nov. 30, 2005.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Installation of the T600 at Fermilab CSN2, September 22,
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
AD consolidation activities in LS2
Potential Use of PEP-II Magnets by Project X
Two-beam Test-stand Design and Construction Status
Presentation transcript:

A. Bross MTA RF WS August 22, Welcome MTA RF Workshop

A. Bross MTA RF WS August 22, Particulars  The morning session is here in 1 East  The afternoon session is in the Black Hole WH 2NW  No registration  Coffee Breaks – Cafeteria  7:45 at La Sorrella Di Francesca 18W Jefferson Ave Naperville, IL

A. Bross MTA RF WS August 22, MuCool Test Area

A. Bross MTA RF WS August 22, MTA Hall

A. Bross MTA RF WS August 22, Beam Line Installation has Started  MUCH activity at the moment  Unfortunately, RF is locked out until the shielding wall between the MTA and Linac is back in place

A. Bross MTA RF WS August 22, Pulsed magnets Cooling ring dipoles SQA’s “Green” quads Shielding blocks MW’s MTA beam line layout

A. Bross MTA RF WS August 22, Extraction point to MTA line  Extraction begins upstream and ends downstream of the chopper u It is accomplished by 2 pulsed “C”-magnets power from a single power supply. s One 3° magnet upstream and one 7.5° magnet downstream of electrostatic chopper –Keeps the H - magnetic stripping losses under reasonable levels Booster & dump beam gate valve “C”-magnets 10” 25” 10.5 °

MTA Beam line Status Fermilab AAC Meeting F.G. Garcia8 MTA beam line installation  Goal Feb 2007  Install the MTA beam line components, or as much as possible, during 2007 shutdown.  FNAL shutdown Start August 6 th Duration 10 weeks  Start from scratch…or almost from scratch Finalize the beam line design and finish drawings Build stands Refurbish magnets Utilities installation  Expand electrical distribution for MTA  Install cable trays  Install LCW system for cooling requirements Install instrumentation, magnets, beam valves, beam stops, vacuum, controls, etc…

A. Bross MTA RF WS August 22, Organization Chart

A. Bross MTA RF WS August 22, (also known as 200MeV Quads, Green Quads, 400MeV Quads…) Surveyors referencing the magnets Hydraulic tests look good 10 TQTB (install spares) Current Status u Remnant field measurements complete u Electrical upgrade complete u The reference survey is complete u The magnet stands are ready and stored at MTA stub area TQTB quadrupoles are ready for installation

A. Bross MTA RF WS August 22, Shielding under hatch area The existing shielding underneath the hatch is not sufficient to run beam to the MTA enclosure 26’-0” 13’-6” concrete soil concrete air soil 21’-0” 10’-6” It has been installed primary to protect personnel inside the MTA enclosure from Linac beam

A. Bross MTA RF WS August 22, Source: Fermilab Radiological Control Manual (FCRM) Courtesy: C. Moore Operational limitations

A. Bross MTA RF WS August 22, Shielding under hatch area (cont.)  Design has been developed u Conventional blocks u Space for beam stop is allocated s All blocks are on site s Estimate: ~10 days T&M contract Start: August 14 th Courtesy: T. Kobilarcik

A. Bross MTA RF WS August 22,  Start of shielding work was delayed due to an onsite strike and the riggers would not cross. u Worked out last Thursday  Shielding work should be complete by 8/31 and we should be able to start RF tests again right after Labor Day u At this point we are decoupled from Beam Line Installation work s Except for parts that go in the MTA

A. Bross MTA RF WS August 22, Overall Schedule

A. Bross MTA RF WS August 22, The Vacuum RF Near-Term Plan  Continue Button tests with Bare and TiN coated buttons  We have buttons made with the following metals u Tantalum u Tungsten u Molybdenum-zirconium alloy u Niobium u Niobium-titanium alloy u Stainless steel  Continue conditioning 201 with Be windows (if power ever becomes available) without B field (after re-tuning). u Then do B field scan s Can go up to few hundred gauss at present –Need new pumping system to go higher SHOULD ORDER ASAP –And eventually Coupling Coil

A. Bross MTA RF WS August 22, ASAP

A. Bross MTA RF WS August 22, Cryocooers Power leads Cold mass supports Coil assembly He cooling pipes Thermal shields and intercepts Vacuum vessel He condenser Pro/E drawing by C.S.Liu