MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Introduction to Closed Cycle Cooling Systems (for MICE) Tom Bradshaw Rutherford Appleton Laboratory MICE Video conference 24 th March 2004.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
MICE hydrogen review Commissioning, testing and operations.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE absorber and Window / flow Design Wing Lau, Giles Barr & Stephanie Yang Oxford University MICE Meeting Berkeley, Oct 2002.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
Control of Multi-stage ADRs Peter Shirron Cryogenics & Fluids Group.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Thermal Energy.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Cryogenics for LCGT Technical Advisory Committee for LCGT ICRR SUZUKI, Toshikazu High Energy Accelerator Research Organization.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
What is a Thermostats  A device which automatically regulates temperature. regulates temperature.regulates temperature.  Thermostats activates different.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Chapter 9 and 10 Thermal Energy . Review Thermal or internal energy in a substance is the total energy of all its atoms and molecules.Thermal or internal.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Thermal Energy & Heat.
Michael A. Green and Heng Pan
MICE Absorber and Focus Coil Magnet – Test Results
Spokesman's update.
Hydrogen System Update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Cryogenic behavior of the cryogenic system
MICE Meeting at RAL, Oct-23, 2005
Marco Statera NA62 - GTK working group meeting
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
LN2 Circuit for MIT Test, September 2005
Mathew C. Wright October 2016
Cryogenics – The Basics
Cryogenic behavior of the magnet
Presentation transcript:

MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 1Cool down cooler and absorbers No cryogen in absorber needed at this stage; Record temperature achieved at various thermometer locations Observe time taken to reach the soak-up temperature Time lag on each component reaching its min temp Estimate time taken to reach soak up temperature of the absorber alone Determine the level of heat leak in the system Cryostat Vessel Safety system Thermometer s as per Fig.1a 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 1Cool down cooler and absorbers No cryogen in absorber needed at this stage; Record temperature achieved at various thermometer locations Observe time taken to reach the soak-up temperature Time lag on each component reaching its min temp Estimate time taken to reach soak up temperature of the absorber alone Determine the level of heat leak in the system Cryostat Vessel Safety system Thermometer s as per Fig.1a 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 1Cool down cooler and absorbers No cryogen in absorber needed at this stage; Record temperature achieved at various thermometer locations Observe time taken to reach the soak-up temperature Time lag on each component reaching its min temp Estimate time taken to reach soak up temperature of the absorber alone Determine the level of heat leak in the system Cryostat Vessel Safety system Thermometer s as per Fig.1a 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 1Cool down cooler and absorbers No cryogen in absorber needed at this stage; Record temperature achieved at various thermometer locations Observe time taken to reach the soak-up temperature Time lag on each component reaching its min temp Estimate time taken to reach soak up temperature of the absorber alone Determine the level of heat leak in the system Cryostat Vessel Safety system Thermometer s as per Fig.1a 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber Liquid Helium

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber Liquid Helium

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber Liquid Helium

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber Liquid Helium

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Thermal performance test on the Absorber – CryoCooler system R&D plan ste p ProceduresWhat to doWhy do we do itWhat is needed 1Cool down cooler and absorbers No cryogen in absorber needed at this stage; Record temperature achieved at various thermometer locations Observe time taken to reach the soak-up temperature Time lag on each component reaching its min temp Estimate time taken to reach soak up temperature of the absorber alone Determine the level of heat leak in the system Cryostat Vessel (Fig 2) Safety system Thermometer s as per Fig.1a 2Switch on the heaters sequentially at the CryoCooler 1 st & 2 nd stages and at Absorber Measure temperatures at various points Heater must have known heat input To see how the system responses to heat input at various locations Heaters as per Fig 1a 3Fill Absorber with Liquid Helium Measure T at absorber; if T < 4.8K, then OK; If T > 4.8K, then measure boil-off Evaluate how the absorber performs with Liquid Helium in it Flow meter at hydrogen vent exit Fig 1b 4Boil He away and pump out helium to about 0.1 torr Turn on Absorber heater to facilitatePrepare Absorber for H2 operationVacuum pump 5Introduce gas H2 and liquefy gas in absorber. Measure time taken to fill absorber with liquid hydrogen To measure performance of absorber when H2 has been liquefied Safety valve activated 6Shut off H2 gas supplyT will continue to drop until it reaches 15K Control system takes over to maintain the temperature at this level Test automatic control systemControl system in place 7Switch on heater at Absorber, 1 st and 2 nd stage of Cooler Measure temperature responses at various thermometer locations Evaluate response of absorber

Cost and Schedule estimate