Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Spectrometer Solenoid Tech Board Schedule Discussion
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICE Funding Agency Committee Meeting—RAL.
Integration of the Spectrometer Solenoid Magnets
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 2 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 MICE Cooling Channel Layout Spectrometer Solenoid #1 (reassembly under way) Spectrometer Solenoid #2 (final assembly complete, testing under way)

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 3 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Magnet cool down Helium system leak Current progress LN cool down system Temperature logging system Electronics racks Tracker go/no go gauge 2 nd magnet progress Upcoming task schedule Topics

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 4 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Helium Cryostat Leak Magnet had been completely assembled and cooled to 5K (cold mass) and transfer of LHe was under way After an LHe dewar change, the system was not flowing Vendor suspected an ice blockage and attempted to thaw out fill line with heated helium gas Blockage remained, so vendor attempted to transfer LHe through a vent line An internal leak between the cryostat and the insulating vacuum caused the insulating vacuum to fill with helium After some disassembly, a leak was found in one of the vent lines (likely at a Conflat seal) and has been repaired

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 5 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 LN Cooldown of Magnet Cooler He lines Transfer line

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 6 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 LHe Transfer into Cold Mass Fill line turret Transfer line Vent line turret

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 7 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 LN & LHe Dewars for Cooldown

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 8 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Fill and Vent Line Configurations

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 9 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Magnet Cross Section View Fill Vents

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 10 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Fill and Vent Turrets Normal stinger location Leak area 2nd stinger location Vacuum Helium

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 11 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Possible Leak Locations Conflat seal Weld

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 12 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Turret Removal to Access Vent Lines Upper turret weld Vent lines Lower turret weld

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 13 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Exposed Vent Lines after Turret Removal Fill/precool port Vent line with instrumentation (leak location) Added vent line

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 14 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 FNAL LN Cooldown Control System Heaters Thermocouple Control system chassis Flow control valve LN System was successfully operated during cooldown Modifications to control circuitry needed to optimize performance

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 15 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 LN Cooldown Chassis and Heaters

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 16 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Temperature Logging System in Use System now operating 16 channels being logged User can specify logging time increment

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 17 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Temperature Logging System Screen Shot

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 18 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Power Supply Racks Two power supply racks have arrived at Wang NMR from RAL Installation of power supplies and discharge circuits are under way (one rack per magnet) Spec supplied by RAL dictates locations of components First rack expected to be ready for training of first completed magnet

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 19 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Tracker Go/No Go Gauge in Place Gauge

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 20 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Original First Magnet Cold Mass Assembly

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 21 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, K Shield Connections (1 st magnet)

MICE Spectrometer Solenoid Fabrication and Testing UpdatePage 22 Steve Virostek -- Lawrence Berkeley National Laboratory -- June 1, 2009 Magnet leak check and re-welding of the vent line turret are to be completed this week Cooldown of the magnet could start next week FNAL and LBNL are working on a procedure to prevent ice blockages from forming during cooldown Magnet cooldown is ~1.5 week process System to be run at operating temperature for ~24 hours to ensure recondensing system is functional Magnet coils are to be trained prior to warming up for shipping to FNAL (likely mid-July if no other problems) Upcoming Tasks