ESTIMATING By Laith Jacob.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Contracting
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Alternative Project Delivery
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
Marcy Mealy Procurement Specialist CDBG Program
The Risks and Rewards of Contractor Bids and Proposals.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Cost Estimating and Bidding.
Construction Contract Documents
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
Construction Engineering Management Project Costing
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
You passed the Bond or secured some funds What do we do now? 2014.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Gloucester Parkway Entrance Enhancements IFB# RAR Pre-Bid Conference & Site Visit August 16, 2016.
FIDIC Tendering Procedures
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Construction Oversight
PROJECT DELIVERY METHODS
CONTRACT DOCUMENTS & CONSTRUCTION
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Financing Land Development Projects
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Design-Build Process Utilizing Negotiated Selection
Manajemen Konstruksi Bidding & Award
ARCH 435 PROJECT MANAGEMENT
Construction Contracts
Presentation transcript:

ESTIMATING By Laith Jacob

INTRODUCTION TO ESTIMATING Estimating is an approximation that defines the Cost of construction Activity or activities prior to commencement of work VS the cost of work during and after construction, which is the Actual cost. Activity Cost in general is basically the cost of material, labor and equipment.

PROCEDURES AND STEPS Advertisement Section 00030 Purchase of Bidding Documents. Site Tour and pre-bid meeting Questions and clarifications – addenda Meet bid date and time dead line – delivery of bid.

SECTION 00030 ADVERTISEMENT Bid date and time Project description Bidding documents Bid Security Any local requirement Contract time

BIDDING DOCUMENTS Specifications Drawings Addenda

SITE TOUR AND PRE-BID MEETING Site Accessibility Temporary construction roads Staging area Storage area Security Site conditions and finishes

QUESTIONS AND CLARIFICATIONS Clarify any existing site condition that we feel could affect the estimate (underground utilities not shown on documents, any dewatering and discharge, construction power and water needs….etc. Any conflict between the drawings and specifications. Ask for any missing detail or specification section.

TYPES OF ESTIMATES Conceptual Estimate Construction Management Estimate GMP (Guaranteed Maximum Price) Estimate Design Build Estimate Lump Sum Estimate Lump Sum Unit Prices

COST ESTIMATING Reading the Front End Documents (Division 0 & 1) Division 0 “Administrative and Advertisement” Instruction to Proposer (Pre-Bid Meeting and Site tour, Questions, Clarifications & Concerns, Delivery of Bids (time & location and number of copies) Information to Bidders Bid Forms Bid Bonds Bidder Qualification for certain type of projects and broker Contractors Form of Agreement General Conditions (Indirect Cost, e.g. Staging area, Access roads, Construction Building Access, Temporary offices, Daily/Weekly and Final Clean up, Temporary Power and Water Utilities, Safety…..etc) Supplementary Conditions

COST ESTIMATING (CONT.) Division 1 “General Requirements” Administrative Provisions (Scope of work, Alternates, Coordination…..) Progress Meeting Construction Schedules and procurement of Equipment Submittals Quality Control (testing for soil, concrete, paving……..etc.) Construction Facilities and Staging area O&M manuals and Training.

COST ESTIMATING (CONT.) Understand the Details of the Drawings and Scopes Generate The Scope of Work for each Trade and coordinate with the project construction schedule. Generate General Conditions Cost. Take off of different trades and price it, as needed. Generate the Bid Day Scope Check Sheets “Green Sheets”. Generate The Posting Sheets. Generate Bid day strategy and responsibilities

COST ESTIMATING (CONT.) Risk Factors Know the Owner Type of work Location of the project Competitive Edge Meetings Know your competitors. Their weaknesses. Educate the market through questions to the Owner/Designer and Subcontractors. Know the Market

COST ESTIMATE AND BID SUMMARY SHEET Direct Cost, Subcontractors bids, self perform work Indirect cost, General Condition (Field cost, Safety, Permits, Clean up…etc) Insurance, Bond cost and Overhead & Fee.