Chandra Users’ Committee, 15-16 Oct 2008 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 10  639 submitted proposals  *5.6 oversubscribed.

Slides:



Advertisements
Similar presentations
John Cunniffe Dunsink Observatory Dublin Institute for Advanced Studies Evert Meurs (Dunsink Observatory) Aaron Golden (NUI Galway) Aus VO 18/11/03 Efficient.
Advertisements

OPC matters Simon Morris. Topics for possible Discussion Simon Morris is OPC Chair for period 80 and 81 Rapid turnover planned for Panel membership Large.
CUC Oct 2013 Chandra Director’s Office Cycle 15 Peer Review  June 2013, Hilton Logan Airport  No major changes in Cycle 15  13 topical panels,
1 HST Cycle 12 TAC Results Bob Williams TIPS – 17 April 2003.
CXC Response to June 04 Report 1.Bakeout Status: Paul Plucinsky 2.CIAO upgrade information: Jonathan McDowell 3.DS9 and visualization scripts: Jonathan.
Chandra User’s Committee Meeting (6/27/04) P. Slane (Chandra Mission Planning) Constrained and Coordinated Observations Chandra Mission Planning Response.
25 Jan 2005CUC Meeting CXC-Sponsored Workshops & Symposia Paul Green For the Chandra Directors Office.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
CUC, 12 Jan /18/03Belinda Wilkes, CDO Cycle 5 Chair+Pundit Questionaire  Circulation: 15 people (12 chairs, 3 pundits)  Responses: 8 (7 chairs,
Chandra Users’ Committee CXC Manager’s Status Report For the period October 08 – March 09 Roger Brissenden CXC Manager 06 April 2008.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 08 – September 08 Roger Brissenden CXC Manager 15 October 2008.
Chandra Users’ Committee, Apr 2007 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 9  661 submitted proposals  *5.5 oversubscribed.
Cxc CHANDRA X-RAY OBSERVATORY Press Events 39 Press Events 3 Space Science Updates - Perseus Cluster: Chandra "Hears" a Black Hole - RXJ : Star Being.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
Chandra Users’ Committee, Oct 2006 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 8  725 submitted proposals  *6.4 oversubscribed.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 09 – October 09 Edward Mattison CXC Deputy Manager 29 October 2009.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 07 – September 07 Roger Brissenden CXC Manager 19 September 2007.
Users' Committee, 25 Oct 2010 Chandra Director’s Office Cycle 12 Peer Review  June 2010, Hilton, Logan Airport  No major changes in Cycle 12 
Chandra Users’ Committee, 9-10 Apr 2008 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 10  639 submitted proposals  *5.6 oversubscribed.
Director's Office Chandra Users’ Committee, Sept 2007 Chandra Cycle 9  661 submitted proposals  *5.5 oversubscribed (based on time)  48 LP, 10.
Oct. 15, 2008Chandra Users' Committee Fellowships Chandra and Einstein Nancy Evans.
Chandra Users’ Committee, 6-7 Apr 2009 Chandra Director’s Office Cycle 11  CfP Release: Dec  POG, final A Eff : 15 Jan 2009  GTO: 43 proposals.
25 June 2002Chandra Users’ Committee, Belinda Wilkes XMM/Chandra Schedules AO date 15 Dec 2002 Deadline 15 March 2003 Peer Review ~15 June 2002 AO date.
Chandra Director’s Office Chandra’s Second Decade  Lifetime: ≥15-20 years (RJB’s presentation)  Is all key Chandra science enabled by current proposal.
CXC Chandra Users' Committee Chandra Director’s Office Proposal Cycle proposals *6.4 oversubscribed (based on time) GTO for review: due 3 rd April.
COSMOS Team Meeting, Kyoto, 23 May 2005 C-COSMOS The Chandra Cycle 7 COSMOS Proposal Martin Elvis (PI) & 32 others.
Tracking Chandra Science Productivity Publication Metrics special thanks to John Bright, Arnold Rots, and Sherry Winkelman (Archive Group) and Mihoko Yukita.
CUC, 29 June 2004Belinda Wilkes, Assistant Director CXC Response to Jan 2004 CUC Report 1,2: relate to peer review (Belinda) 3: high-risk science category:
CXC Education & Public Outreach (Jan June 2002) CXC CXC EPO Scope EPO Program Scope:  Public Affairs: Space Science Updates, press releases, press.
Astro 101 Slide Set: Multiple Views of an Extremely Distant Galaxy 0 Topic: Distant galaxies Concepts: Galaxy development, Gravitational lensing Missions:
Workshop Purpose Paul Hertz April 25, The Importance of Astronomy Science Centers NASA Astronomy Science Centers provide functions for the community:
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
Cycle19 Statistics Brett Blacker Science Policies Group Science Mission Office March 15, 2011.
Special Evening Session: The Business of NASA Research August 22, 2006 Evening Session.
Dr. Chas Beichman, Executive Director Dr. Rachel Akeson, Deputy Director Dr. Dawn Gelino, Science Community Affairs 25 April 2012.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2010 – September 2011 Edward Mattison CXC Deputy Manager 13 October 2011.
NASA Goddard The Universe Beyond the Solar System… Anita Krishnamurthi Education and Public Outreach Lead.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
1 The VLBA and Fermi Dave Thompson NASA GSFC Fermi Large Area Telescope Multiwavelength Coordinator Julie McEnery NASA GSFC Fermi Project Scientist VLBA.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2009 – April 2010 Roger Brissenden CXC Manager 27 April 2009.
NASA Program Update Presented to the AAAC Dr. Anne L. Kinney Director, Universe Division October 11, 2005.
CUC Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.
Cross-Calibration between XMM-Newton and Chandra Herman L. Marshall Chandra X-ray Center, MIT Kavli Institute.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
ANN HORNSCHEMEIER Chief Scientist, Physics of the Cosmos Program NASA Goddard Space Flight Center.
Toward the Senior Review Rob Petre. Senior Review proposal details Due March 12, 2008 Competing against: XMM, INTEGRAL, RXTE, Swift, Galex, WMAP, Spitzer.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
GO Program: Cycle 1 process, results, and Cycle 2 schedule Koji Mukai Astro-E2 Guest Observer Facility.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
Fermi Users Group Meeting Goddard Space Flight Center, February 6, 2009C. Shrader, NASA/GSFC 1 Fermi Users Group FSSC News Chris Shrader, Fermi Science.
April , 2006 HEASARC Users Group Tom McGlynn The HEASARC On-line Services Tom McGlynn.
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
Fermi Science Support Center September 26, 2008 FUG Face-to-Face Meeting Fermi GI Program Update David Band, FSSC CRESST/GSFC/UMBC.
S cience M ission D irectorate Research Solicitation Overview.
Telescope Access Metrics Presentation to Program Review Panel September 16, 2004.
The Black Hole-Galaxy Evolution Connection Ezequiel Treister Einstein Fellow IfA, Hawaii IfA, Hawaii Credit: ESO/NASA, the AVO project and Paolo Padovani.
GO Program: Past, Present & Future Koji Mukai Suzaku Guest Observer Facility.
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
Telescope Access Metrics
Roger Brissenden CXC Manager 22 October 2013
Proposal Cycle: Updates and Plans
Chandra Users Committee Meeting
Presentation transcript:

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 10  639 submitted proposals  *5.6 oversubscribed (based on time)  64 LP, 8 VLP  More LPs cf Cycle 9 (48)  57 Archive, 41 Theory

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Total Time Request Change from Cycle 9  Time request: -3%  LP request: +18%  VLP request: -40%  Grating request: +36%

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Oversubscription by Category  LP/VLP competed for full 6 Msec  LP/VLP Over-subscription: 6.5  BUT: no VLPs approved

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Allocation by Instrument and Science Category

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Gratings Proposals Success rate back to normal

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Archive/Theory Results  Archive:  Budget: $1100K  Allocated $1340K  Over-subscription: 2.7  Theory:  Budget: $600K  Allocated: $730K  Over-subscription: 4.0  Reason: panels grading and priorities  Increased total GO funds to cover: $410K

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Joint Chandra Proposals  Joint Proposals approved by other TACs  XMM TAC: 2 approved: 220 ksecs  HST TAC: 2 approved: 110 ksecs  Joint Proposals approved by Chandra TAC  HST: 14 proposals; 72 orbits  XMM: 2 proposals; 154 ksec  RXTE: 2 proposals; 420 ksec  NOAO: 7 proposals; 20 nights  NRAO: 8 proposals; 93 hrs  Spitzer: non available  Cycle 11  No RXTE  Suzaku: under negotiation  Spitzer warm – restored up to 100 hrs

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Peer Review  June 2007, Hilton, Logan Airport  13 topical panels, 1 Big Project Panel (BPP)  Program as last year:  Tues, Wed: topical panels  Wed evening: BPP organizational session  Thurs, Frid: BPP  Panels:  1,2: Stars, Planets  3,4: SN, SNR, NS  5,6,7: Binaries, Galaxies: Populations  8,9,10: Clusters, Galaxies: Diffuse  11,12,13: AGN, Extragalactic surveys

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Other Peer Review Results  Constrained Observations:  Same as last year (Easy: 45; Average 35; Diff. 20)  Joint allocated: 5D, 2A  Allocated: Diff: 8/15; A+E: 96/70 (1D=2(A+E))  Keep the same for Cycle 11  Developing Constraint classification tool in RPS  TOOs:  over-subscribed SLOW (12-30 days) for the first time  Cost Review:  External: for proposals asking for > fair share (~15)  Internal: remainder

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Cycle 11 Updates  WebVis : major update:  New Look!  Cursor readout  Zoom capability  Pitch angle observing restrictions  Constraint and Slew Tax Estimator:  In RPS  Constraint class and count for each target  Slew tax for each target  Total for proposal

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Einstein Fellows  NASA HQ mandated: Fellows Programs by SMD Theme Provide stability unrelated to missions and uniformity Retain prestige by stopping proliferation Will build/change #s as missions within themes begin and end SMD THEME Fellowship name Number of Fellowships Program Administered by Old Fellowship Program(s) EXOPLANET EXPLORATION Sagan 5 Exoplanet Science Institute Michelson COSMIC ORIGINSHubble 17STScI Hubble Spitzer PHYSICS OF THE COSMOS Einstein 10 Chandra X-ray Center Chandra GLAST (Fermi)

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Einstein Fellows  CXC directed to issue call for new Einstein Fellows program in place of original Chandra Fellowships in mid July  Einstein Fellowship program was separated from CXC, detailed negotiations over budget and contract were completed at short notice  All material (announcements, advertisements and web pages) were updated to reflect the change  Nancy Evans will provide more details later in the day

Chandra Users’ Committee, Oct 2008 Chandra Director’s Office Response to April 2008 CUC Report 1) Chandra Source Catalog: has been released, demo today (Ian Evans) 2) Gratings Threads, update: Dave H. 3) CIAO Workshop: scheduled for Oct ) Mission Planning, update: Pat S. 5+6) Chandra/Einstein Fellows: Nancy Evans 7) Cross-calibration: memo released, update Larry D. 8) Joint Suzaku/Chandra time: being negotiated 9) CXC Website: new design open for CUC comments