Engineering 100: Bridge Project Group 6 (Team Bacardi) Jon Honari, Kevin Lam, Otis Chantharangsy, Ivee Ilao Group 6 (Team Bacardi) Jon Honari, Kevin Lam,

Slides:



Advertisements
Similar presentations
BRIDGE BUILDING ASSIGNMENT 1.Work with a partner to construct 1 bridge. 2.Last Module Partner. 3.Draw a full size truss pattern from one of the six truss.
Advertisements

PHYSICS 1401 JEFFERY DING ALAN JONES
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Exploring Engineering Darin Gray Group 5 July 15 th, 2011 Darren Draper Sinem Sargin Ryan Vo Marquel Jones-Francis.
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Popsicle Stick Bridge Challenge Engineering 9
Ch. 8 Whiteboard Review Hypothesis Testing Problems taken from P. 452.
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
The Paper River Chasm Project Team Canada ME104Q University of Rochester The Paper River Chasm is an opening that extends 8.5” over the Paper River. Several.
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
Bridge Report By Jenny. Gina. Eunji. Matt Team 5.
The Incredible Bridge The Incredible Bridge alice yi - collin larson - jason truong - michael lenning Created by Team Incredible.
Bridge Project Presentation Group #2 Alex Odle Matt Simon Salim Hamed Micael Thiodet.
Bridge of Arc’s Design Brief
Critical Load.
Structural Engineering Notes PowerPoint Courtesy of Amherst Middle School Technology Department TMS Technology Education Presents:
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
© 2006 Baylor University EGR 1301 Slide 1 Lab 8 Predicting Strength of Trusses Approximate Running Time – 20 minutes Distance Learning / Online Instructional.
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
Critical Thinking in Engineering Process
Webquest.  Introduction  Roles  Task  Process  Evaluation  Conclusion  credits.
 How can math help me understand my world?  What factors influence bridge strength?
Direct and Inverse Variations Direct Variation Which of these tables models direct variation? If so, write an equation. NO.
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
Elevated Bridge Building New York State Coaches Clinic October th 2009 Fishkill, New York.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
In the above correlation matrix, what is the strongest correlation? What does the sign of the correlation tell us? Does this correlation allow us to say.
Civil Engineering Math Concepts.
Shoe Rack Muntabir Hasan Choudhury, Nathan Copros, David Foery.
PASTA TOWERS. GOAL—Build the most efficient tower.
Structural Engineering Notes Directions: This PowerPoint will enable you to complete your “Structural Engineering Note Packet”. Use the forwards and.
Structural Engineering
Group 6 Casey Ligrano Hampton Brown Nicholas Johnson Xuan Nguyen.
Bridge Construction Project Jennifer Schofield, Kirsten Riggle, Justine Staniszewski
Structural Engineering
Preventing Lifting and Back Injuries. Logistics Restrooms are located... In the event of an emergency...
Unit 91 Week 7 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt October 1, 2008 Final Presentation.
Bridge Building Design Challenge
Clarinet Assembly Best assembly to prevent unnecessary repairs.
WOOD TOWER DESIGNS Objective: Students will be able to construct a tower out of wood in order to investigate the physics of structures.
Bridge Project Summary By : Kourtni Ball & Teara Welsh.
Group members- Maria Reyes Cynthia Herrera Junior Guiterrez POPSICLE STICK BRIDGE TEAM BUILDING CHALLENGE (PHYSICS B PROJECT #1)
Title Science Fair Project Names School Grade Teacher Note: This slide goes on the back of your board on the top right. No names on front so that it is.
+ Structural engineering and How to reinforce the design of a structure to hold more weight Spring Technical English Program Санкт-Петербург, Рассия.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
Unit D Structures and Forces
BRIDGE BUILDING ASSIGNMENT
Design Project #1 Prof. Berezniak Presented to: Spring 2017
Structural drawing.
Popsicle stick bridge Ryan and Simon.
Tim Wyckoff David Cenidoza Sachin Narvekar Felix Liu Weston Wells
BRIDGE BUILDING ASSIGNMENT
POPSICLE STICK BRIDGE PROJECT
Stick Together & Civil Structures
Structural Efficiency
By Savannah and Sophie Block 5
Engineering 9 Including: Popsicle Bridge By: ZK and SO
Bridge Project: Team Truss-Arch
Structures & Buckling Developed by: Lane Azure Bob Pieri Chad Ulven.
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Design Brief Liam and Dorsa.
Replacement of Vehicle Bridge over Spring Creek
Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials. Bridge Project.
Civil Engineering Math Concepts.
Do Not Touch! Group 4 Engineering 100 By : Jonathan Lai Andrew Hsieh Apisada Petchtes Heidi Yee.
John Blair DJ Geoff Morgan Michael Rossol
Do Not Touch! Group 4 Engineering 100 By : Jonathan Lai Andrew Hsieh Apisada Petchtes Heidi Yee.
Presentation transcript:

Engineering 100: Bridge Project Group 6 (Team Bacardi) Jon Honari, Kevin Lam, Otis Chantharangsy, Ivee Ilao Group 6 (Team Bacardi) Jon Honari, Kevin Lam, Otis Chantharangsy, Ivee Ilao

Presentation Outline  Design  Ideas  Prototype Bridge  Process  Testing/Results  Prototype Analysis  Flaws  Improvements  Design  Ideas  Prototype Bridge  Process  Testing/Results  Prototype Analysis  Flaws  Improvements  Final Bridge  Design  Testing/results  Final Results  Graph  Analysis  Failures  Conclusion  Final Bridge  Design  Testing/results  Final Results  Graph  Analysis  Failures  Conclusion

Design  Arch Design  Proved to be strongest structure based on our research  Base  Flat and straight  Supports  Angle supports  Evenly distributed force  Arch Design  Proved to be strongest structure based on our research  Base  Flat and straight  Supports  Angle supports  Evenly distributed force

Prototype Design

Prototype Process  Arch  Supports  Road  Connections  Structural Reinforcements  Arch  Supports  Road  Connections  Structural Reinforcements

Prototype Process

Prototype Testing/Results

Prototype Analysis  Flaws  Uneven weight distribution  Not supported where bridge met jig  Ultimate reason for failure  Weak road  Sloppy design  Unnecessary weight  Flaws  Uneven weight distribution  Not supported where bridge met jig  Ultimate reason for failure  Weak road  Sloppy design  Unnecessary weight

Prototype Flaws Red: Excess WeightGreen: Lack of Support

Final Design  Excess weight was removed  Top section was more reinforced  Used wood glue instead of hot glue for the majority  Made sure weight was distributed evenly  Reinforced the legs where the bridge met the jig  Added more supports  Excess weight was removed  Top section was more reinforced  Used wood glue instead of hot glue for the majority  Made sure weight was distributed evenly  Reinforced the legs where the bridge met the jig  Added more supports

Prototype vs. Final Design Final BridgePrototype

Final Design (Completed)

Final Testing/Results

Final Design Failure Important joints were overlooked and were not supported correctly

Final Analysis  Overall, very good improvement  Bridge weighed 0.59 lbs  Bridge held lbs  Performance = Successful  With more supports in the correct places we believe the bridge could hold much more weight  Overall, very good improvement  Bridge weighed 0.59 lbs  Bridge held lbs  Performance = Successful  With more supports in the correct places we believe the bridge could hold much more weight

We conclude…  Spending more time on the construction yielded better results  About 170% improvement  High efficiency ratio  Endures a high amount of pressure  Lasts under consistent amount of low pressure  First Bridge:.56 pounds, held lb  Final Bridge:.59 pounds, held lb  Spending more time on the construction yielded better results  About 170% improvement  High efficiency ratio  Endures a high amount of pressure  Lasts under consistent amount of low pressure  First Bridge:.56 pounds, held lb  Final Bridge:.59 pounds, held lb