LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 2.0 Dynamics Tests LAT Environmental.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Advertisements

GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 6 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project Integration and Test October 1, Environmental Test Requirements: Structural LAT Structural Tests: There are three environmental.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
LAT-TD GLAST LAT ProjectJune 28, 2006 Mechanical Systems GLAST LAT Mass Properties Test Readiness Review Mechanical Systems GLAST LAT Mass Properties.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
LAT-TD Page 1 GLAST LAT ProjectEnvironmental Test TIM, Day 1: Structural Tests, March 14, 2005 Agenda: LAT Environmental Test TIM, Day 1: Structural.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Gayle K. Martin November 14, 2016
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
GLAST LAT Acoustic Vibration Test Readiness Review
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Environmental Test Planning Meeting
LAT Environmental Test Planning and Design Review
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
Presentation transcript:

LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May Dynamics Tests LAT Environmental Test Planning and Design Review 3-4 May Dynamics Tests John Ku Naval Research Lab Bldg 226 Rm 113 Call-in number: Passcode: 3992 John Ku Naval Research Lab Bldg 226 Rm 113 Call-in number: Passcode: 3992

LAT Environmental Test PDR2 GLAST LAT Project3-4 May 2005 Tue May 3 PM Agenda 2.0 Dynamics Tests (John Ku) –1:00 pm2.1 Sine Vibe 1: Test Plan 1: Test Configuration 2: Test Logistics 2: Open Issues –2:30 pm2.2 Acoustic 2: Test Plan 3: Test Configuration 3: Test Logistics 3: Open Issues –4:00 pm2.3 Weight and CG 4: Test Plan 4: Test Configuration 4: Test Logistics 4: Open Issues –4:30 pm2.4 Open Issues To get through these 57 Slides in 4 hours, we must average 4.2 minutes/slide

LAT Environmental Test PDR3 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Plan Overview Objectives of the test are well understood by all –Verify the strength of the LAT and subsystem interfaces under PFQ loads and durations –Measure primary natural frequencies (f n ) of the primary modes of the LAT –Determine transmissibility (Q) of the LAT –Validate the math model used for coupled loads analysis –Verify the workmanship and processes used in the manufacture and assembly Test Plan –Third draft of test plan is out for review – first major update in over a year –Many technical details have been addressed in previous meetings – the current draft is very mature and should be released in 1-2 weeks First comments in from GSFC mechanical branch have been minor and already incorporated –Instrumentation list is nearing completion, but not finished yet Internal accelerometers defined and CAD layout complete Strain gauges (16 channels) on flexures defined (NRL can accommodate up to 40 channels, ¼ bridge) External accelerometer mathematical positions defined, but CAD layout needed

LAT Environmental Test PDR4 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Plan Overview Test Plan (Continued) –Entrance/Exit Criteria are well understood by all; from the test plan: The sine vibe dynamic test is the first environmental test to be performed after arrival to NRL and the subsequent CPT. Criteria which must be met before this test can be executed are: –LAT mechanical integration is complete—all visual, dimensional, and torque testing has been complete, and all travelers verified to be complete. The LAT is in its flight configuration, except as detailed in Section 8.3. –All subsystem units/modules function—each subsystem has passed its CPT following removal from the shipping container. Any performance discrepancies have been clearly documented. –Ensure all E-GSE needed is installed and functioning. After moving and attaching the LAT to the vibration test equipment, ensure each subsystem has passed its LPT. All E-GSE cable harnesses have been removed from the LAT prior to test. –All test instrumentation is in place and functioning—instrumentation has been verified to be securely mounted in the correct locations and oriented in the correct direction, as defined in the test procedure, and electronics are working correctly, and reading out signals. Cable harnesses for this instrumentation are connected and properly restrained for the test –Pretest analysis which provides predictions for Fn and Q for significant modes at all test accelerometers Following the sine vibration test, an LPT will be performed. Prior to breaking test configuration, the following criteria must be met: –Visual inspection of the LAT indicates that there is no visible damage to the LAT –Successful completion of the LPT verifies that all components and subsystems function properly after testing –Rough analysis of test data shows that all recorded data is useable for analysis purposes –Comparison of pre-test and post-test modal signatures match to within 5%, or at the discretion of the test director, showing that modal frequencies have not changed significantly as a result of the test.

LAT Environmental Test PDR5 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Plan – Requirements Test Requirements –Instrument Verification Plan The tests will be performed to the levels published in the LAT environmental specification document, LAT-SS The dynamics tests are to be performed in the mode in which the equipment will observe the environment –LAT will be launched in a “powered off” mode –The sine vibration tests will be performed with the article powered off

LAT Environmental Test PDR6 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration The LAT is transported and supported on the TIP –TIP is already installed for all handling before and after test –TIP assembly uses SC flexures from Spectrum –TIP is designed to simulate SC flexure/top deck interface, so it provides a nearly flight-like interface for the test Interface to both the slip table and expander head is by way of a simple bolt pattern that fits well with the LAT geometry X/Y-Axis Vibration Configuration Z-Axis Vibration Configuration

LAT Environmental Test PDR7 GLAST LAT Project3-4 May 2005 MGSE Requirements Flowing from Sine Vibe Test Plans See the table, below, for a list of all MGSE/STE that is needed for conducting the sine vibe test Test Interface Plate –TIP and mounting hardware capable of handling inertial loads of LAT during test –TIP bolt pattern and size compatible with expander head and slip table –TIP plate supported adequately to ensure stiff connection to slip table/expander head Dust Tent –Capable of providing clean, dry environment before/during/after vibe testing –Provides clearance around LAT for unrestricted motion during vibe –Capable of being on/off-loaded from GPR to vibe table Heat Pipe Restraining Plates –Supports DSHP/XLHP 3-way joints during vibe since Radiator VCHP’s are not mounted –Provides flight-like interface to simulate VCHP flange Chill Bars –Capable of handling vibration loads (obviates need to de-/re-integrate them) MGSE/STE Needed for Sine Vibe Testing

LAT Environmental Test PDR8 GLAST LAT Project3-4 May 2005 Auxiliary Cooling and Mechanical Handling Auxiliary cooling plans –LAT needs to be cooled during LPT’s between each vibe axis run and before and after Chill Bars: one under each of the two X-wings on the Grid X-LAT Aux Cooling: using fly-away cooling lines already mounted to X-LAT Plate –This is room-temperature cooling to remove LAT process heat –To simplify cooling connections, Chill Bars and X-LAT cooling will be designed to handle vibe loads –Hoses will be disconnected using quick-disconnect fittings Handling and mechanical operating procedures –LAT lifting procedure –TIP mounting procedure –Dust tent handling and operating procedure –LAT auxiliary cooling system operating procedure

LAT Environmental Test PDR9 GLAST LAT Project3-4 May 2005 MGSE Issues for Sine Vibe Testing Dust Tent –This is likely needed for sine vibe, but is still TBR –If needed, how will dust tent be supported off of the slip table/expander head around the LAT, while the LAT is vibed? –How do we access the LAT for electrical and aux. cooling interconnects before/after vibe testing? –How is the Dust Tent handled with the LAT LAT is transported with the Tent hanging from the GPR After integration on the slip table, the Tent will need to be re-positioned onto the vibe table base Logistics in the vibe lab –Space is tight in the vibe lab, and the LAT MGSE is large We will have 4 large-footprint objects in the lab nearly simultaneously –LAT on the TIP –GPR –4 x 4 Lift Fixture –MGSE Cart Vibe lab also has 2 vibe tables and the expander head which will need re-positioning during our test –We will be running through the handling logistics with paper dolls, then with the pathfinder, so we should be able to catch the problem areas early

LAT Environmental Test PDR10 GLAST LAT Project3-4 May 2005 MGSE Structural Analysis Status TIP was analyzed for lift loads and dynamic performance (see FEA Mesh shown at left) –High margins were calculated for both cases Rough calculations for the mounting shoes were performed, with more detailed analysis to follow –Conservative hand calculations show high margins for strength and stiffness Rough calculations for the test stand have been performed, wth more detailed analysis to follow –Concentrated on regions of highest load –Design is extrememly stout, and calculations show corresponding high strength margins

LAT Environmental Test PDR11 GLAST LAT Project3-4 May 2005 MGSE Structural Analysis – TIP – Lift case The TIP is only attached to the mounting shoes by 16 screws, in a thinned section –When lifted, how much will the TIP sag from its own weight?  148 microns (0.6 mils) –How much stress is imparted from the prying loads?  3.02 MPa (241 MPa Yield)

LAT Environmental Test PDR12 GLAST LAT Project3-4 May 2005 MGSE Structural Analysis – TIP – Dynamic Performance Calculated First Mode = 417 Hz Required Performance: >225 Hz (1.5*150 Hz)

LAT Environmental Test PDR13 GLAST LAT Project3-4 May 2005 MGSE Structural Analysis – Mounting Shoes

LAT Environmental Test PDR14 GLAST LAT Project3-4 May 2005 MGSE Structural Analysis – Test Stand Test Stand Radiator SC Strut simulators LAT Test Interface Plate Radiator

LAT Environmental Test PDR15 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Plan – Constraints –EGSE Constraints Cables –Disconnected during vibration –Must be long enough to reach LAT while mounted to either expander head or slip table –Cable trays or protection if laid on floor Cart with EGSE Hardware –Portable, can be rolled out of the way –Power interface to lab?

LAT Environmental Test PDR16 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration Mechanical Configuration –Radiators not attached By agreement with the GPO, no mass simulators are needed –Mounted to GD/Spectrum Astro-provided test flexures Test flexures will be proof tested at SLAC prior to GRID static test TIP to interface test flexures and slip table/expander head –LAT Z-axis is always vertical –Access to connectors needed (scaffold around expander head?) on +X side –Layout needed to check cable run lengths Electrical Configuration –SLAC purchased accelerometers are voltage type and have connectors, with a special proprietary triax connector Adapters will be needed to interface with NRL equipment ACD accelerometer interface to be verified –Strain gauges do not have connectors (open leads) –EGSE needed for LPTs between axes (Rich Baun to define requirements)

LAT Environmental Test PDR17 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration – Instrumentation Test instrumentation by subsystem, total of 57 channels, calibrated and installed by SLAC I&T, final checkout by NRL Anti-Coincidence Detector10 Accel Channels10 Uni (9 Fly-away)0 Tri (0 Fly-away) Trackers7 Accel Channels7 Uni (7 Fly-away)0 Tri (0 Fly-away) Calorimeters6 Accel Channels0 Uni (0 Fly-away)2 Tri (2 Fly-away) Electronic Boxes9 Accel Channels5 Uni (3 Fly-away)2 Tri (2 Fly-away) Mechanical Systems25 Accel Channels1 Uni (1 Fly-away)8 Tri (0 Fly-away)

LAT Environmental Test PDR18 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration – Instrumentation

LAT Environmental Test PDR19 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration – Instrumentation

LAT Environmental Test PDR20 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Configuration – Instrumentation Four strain gauges installed per flexure for a total of 16 strain gauge channels –Assumed to be 120 Ohm, ¼ bridge, GF=2 –Strain gauges should be temperature compensated if possible The gauges and data acquisition equipment should be sized to capture a maximum strain of 2500 microstrain (titanium has a yield strain of 7500 microstrain) and have a 0.25% precision (6 microstrain error) The combination of strain gauges will allow measurement of axial strain and bending strain –Shear strain will not be directly measured, but may be ascertained from the combined strain readings of the two legs and pre-test analysis

LAT Environmental Test PDR21 GLAST LAT Project3-4 May 2005 Sine Vibration Test Planning: Detailed Sequence Pre-test Activities –Move dolly into position in vibration lab and disconnect LAT from dolly (SLAC-IFCT) –Lift LAT and TIP onto expander head, and torque bolts (NRL) –Cable Hook-ups and system checkouts Electrical connections to shaker system and accel tap checks (NRL) Electrical connections to EGSE and perform LPT on expander head (SLAC) Z-Axis Vibration Test –Low-level Signature Sine Sweep to 150 Hz (sweep up and down) Set-up sheet printouts (NRL), verification and approval (SLAC) If LPT results are okay, disconnect EGSE cables Run test Output FRF data (NRL) Review Data (SLAC) –Determine notching, if needed –Provide feedback to test conductor –Check pass/fail criteria for Modal Test requirement Give OK to proceed (SLAC), or decide alternate action is needed –Half-level run to 50 Hz Set-up sheet printouts (NRL), verification and approval (SLAC) Run test Output data hardcopies (NRL) Review Data (SLAC) –Check notching and adjust, if needed –Provide feedback to test conductor Give OK to proceed (SLAC), or decide alternate action is needed

LAT Environmental Test PDR22 GLAST LAT Project3-4 May 2005 Sine Vibration Test Planning: Detailed Sequence (cont.) Z-Axis Vibration Test (continued) –Full-level run to 50 Hz Set-up sheet printouts (NRL), verification and approval (SLAC) Run test Output data hardcopies (NRL) Review Data (SLAC) –Check peak levels –Check pass/fail criteria for Modal Test requirement Give OK to proceed (SLAC), or decide alternate action is needed –Low-level Signature Sine Sweep to 150 Hz Set-up sheet printouts (NRL), verification and approval (SLAC) Run test Output data overlays (NRL) Review Data (SLAC) –Re-Check pass/fail criteria for Modal Test requirement Concurrent with data review, hook-up EGSE and perform LPT If data review and LPT are good, Give OK to break configuration, or decide is alternate action is needed Post- Z-Test / Pre- X-Test Activities –Disconnect all electrical connections –Remove mounting bolts and move LAT from expander head and set on handling dolly –Remove expander head, rotate shaker to horizontal position and attach drive bar to slip table –Lift LAT and TIP onto slip table for X-axis vibration and torque bolts –Hook-up accelerometers only and perform vibration control system checkout (no EGSE hook-up here)

LAT Environmental Test PDR23 GLAST LAT Project3-4 May 2005 Sine Vibration Test Planning: Detailed Sequence (cont.) X-Axis Vibration Test –Low-level Signature Sine Sweep to 150 Hz Same steps as Z-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Half-level run to 50 Hz Same steps as Z-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Full-level run to 50 Hz Same steps as Z-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Low-level Signature Sine Sweep to 150 Hz Same steps as Z-axis test Concurrent with data review, hook-up EGSE and perform LPT If data review and LPT are good, Give OK to break configuration, or decide is alternate action is needed Post- X-Test / Pre- Y-Test Activities –Disconnect EGSE electrical connections, leaving Accel cables connected –Remove mounting bolts, lift and rotate LAT in place –Lower LAT to slip table and torque bolts –Perform vibration control system checkout (no EGSE hook-up here) Shaker Slip Table LAT X Y Shaker Slip Table LAT X Y

LAT Environmental Test PDR24 GLAST LAT Project3-4 May 2005 Sine Vibration Test Planning: Detailed Sequence (cont.) Y-Axis Vibration Test –Low-level Signature Sine Sweep to 150 Hz Same steps as X-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Half-level run to 50 Hz Same steps as X-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Full-level run to 50 Hz Same steps as X-axis test Give OK to proceed (SLAC), or decide alternate action is needed –Low-level Signature Sine Sweep to 150 Hz Same steps as X-axis test Concurrent with data review, hook-up EGSE and perform LPT If data review and LPT are good, Give OK to break configuration, or decide is alternate action is needed Post- Y-Test Activities –Disconnect all electrical connections –Remove mounting bolts, lift and set LAT on handling dolly –Attach LAT to handling dolly

LAT Environmental Test PDR25 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Configurations – Deviations From Flight The Radiators are not integrated to the LAT for this test. –Structural interactions between the Radiators and the Grid are not captured This interface will be strength verified at the subsystem level –Coverplates to constrain the down spout heat pipes (DSHPs) and X-LAT heat pipes (XLHPs) to prevent relative motion to the Grid This interface will be strength verified at the subsystem level The LAT is mounted to STE using test flexures which simulate the flight connection to the SC –The STE and test flexures will be included in the pre-test FEA analysis, so its impact on the response of the LAT will be understood. Since the Radiators and SC are not included in this test, not all flight cable harnesses and supports will be integrated for this test –These cables and their associated support brackets will not be adequately verified by this test –Workmanship for these flight connections and harnesses will be accomplished with the Observatory level sine vibration test.

LAT Environmental Test PDR26 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Document List and Status LAT-MD-00408: LAT Instrument Performance Verification Plan LAT-MD-02717: LAT Environmental Test Sequence LAT-MD-01196: LAT Dynamics Test Plan LAT-MD-01533: LAT EGSE Plan LAT-MD-00649: LAT Transportation and Handling Plan LAT-MD-00404: LAT Contamination Control Plan LAT-SS-00778: LAT Environmental Spec LAT-TD-00890: LAT Instrumentation Plan

LAT Environmental Test PDR27 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Logistics Test Personnel –Test support personnel have been identified (to be verified) Test Director: John Ku (SLAC) Test Conductor: Bob Haynes (NRL) Discipline Lead: Jim Haughton (NRL) Facility Manager:Bill Raynor (NRL) MGSE Lead: Martin Nordby (SLAC) EGSE Lead: Mike Huffer (SLAC) Test Script Lead: Rich Baun (SLAC) High-bay operations: Paul Dizon (NRL) Quality Assurance: Joe Cullinan (or Doug Bartholomew) (SLAC) I&T: Ken Fouts (SLAC) –Subcommittees will be assembled from the appropriate personnel above, with expert consultation brought in if needed Potential Vibration Experts: Paul Baird; Chris Fransen; Bill Haile

LAT Environmental Test PDR28 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Test Logistics Many logistics have already been worked out; these remain: –Complete and release drawings/model of slip table and expander head Verify slip table and expander head size, inserts and pattern Clearance to off-load frame on expander head Verify that Test Interface Plate fits completely on expander head Verify that LAT clears bracket parts on slip table Develop paper doll work-up to verify we have floor space for 2 carts, GPR, and 4x4 Lift Fixture Lay out EGSE cable routing and locate EGSE crates –Identify what contamination and humidity control is needed in vibe facility Is GN2 purge neccesary? Cleanliness (need blanket?) –CG Alignment / sensitivity of equipment to offsets (by analysis TBD) –Instrumentation patch panels and cable supports (ensure all connectors interfaces) –Complete detailed design and analysis of TIP and flexure mount brackets (In-process) –Verify response / control channel capability (NRL) Contingencies –Need to be prepared to perform a modal test if the LAT frequencies do not meet expectations Modal test will not need additional instrumentation May require the use of portable shaker with stinger to RMB or other hardpoint Impact to schedule is not believed to be more than one day of testing (but rigorous post test data reduction will be needed)

LAT Environmental Test PDR29 GLAST LAT Project3-4 May 2005 Sine Vibration Test – Open Issues Complete structural analysis of MSGE Complete pre-test analysis, including a simulation of LAT on fixtures 10 action items are open and being tracked. –9 have clear closure paths and are actively being worked on –1 action not addressed yet is not a high priority, as MGSE has not been designed yet

LAT Environmental Test PDR30 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Plan Overview Objectives of the test are well understood by all –The objective of the acoustic test is to demonstrate that the fully integrated LAT is capable of withstanding acoustic noise loads, simulating launch conditions. –A secondary objective is to verify the acoustic analysis, i.e. that the LAT components were qualified to high enough levels of Random vibration Test Plan –Third draft of test plan is out for review – first major update in over a year –Many technical details have been addressed in previous meetings – the current draft is very mature and should be released in 1-2 weeks First comments in from GSFC mechanical branch have been minor and already incorporated –Instrumentation list is nearing completion, but not finished yet Internal accelerometers defined and CAD layout complete Strain gauges (16 channels) on flexures defined (NRL can accommodate up to 40 channels, ¼ bridge) External accelerometer mathematical positions defined, but CAD layout needed

LAT Environmental Test PDR31 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Plan Overview Test Plan (Continued) –Entrance/Exit Criteria are well understood by all; from the test plan: The LAT acoustic test is performed immediately following the LAT sine vibe test. Criteria which must be met before this test can be executed are: –LAT mechanical integration is complete—all visual, dimensional, and torque testing has been complete, and all travelers verified to be complete. The LAT is in its flight configuration, except as detailed in Section –All subsystem units/modules function—each subsystem has passed its CPT following removal from the shipping container. Any performance discrepancies have been clearly documented. –Ensure all E-GSE needed is installed and functioning. After moving and attaching the LAT to the vibration test equipment, ensure each subsystem has passed its LPT. All E-GSE cable harnesses have been removed from the LAT prior to test. –All test instrumentation is in place and functioning—instrumentation has been verified to be securely mounted in the correct locations and oriented in the correct direction, as defined in the test procedure, and electronics are working correctly, and reading out signals. Cable harnesses for this instrumentation are connected and properly restrained for the test. Following the acoustic test, an LPT will be performed. The criteria for declaring a successful completion of the acoustic test are:: –Visual inspection of the LAT—indicating that there is no visible damage to the LAT –Successful completion of the LPT—verifying that all components and subsystems function properly after testing –Preliminary analysis of test data—verify that all recorded data is useable for analysis purposes –No significant mode shifts—pre- and post-test signatures match within 5% showing modal frequencies have not changed as a result of testing

LAT Environmental Test PDR32 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Plan – Requirements Test Requirements –Instrument Verification Plan The tests will be performed to the levels published in the LAT environmental specification document, LAT-SS The dynamics tests are to be performed in the mode in which the equipment will observe the environment –LAT will be launched in a “powered off” mode –The acoustic test will be performed with the article powered off

LAT Environmental Test PDR33 GLAST LAT Project3-4 May 2005 MGSE/STE for Acoustic Testing LAT (on the TIP) is mounted on the Test Stand for acoustic testing –LAT + TIP mounts to Test Stand then Radiators are integrated –LAT is rolled into the acoustic chamber, then jacked off its casters –Dust Tent remains over the LAT for the entire operation, including during testing (TBR) SC top deck simulator –A circular honeycomb-core panel is mounted in the hole of the TIP –This simulates the acoustic behavior of the SC top deck –There is free access to the underside of the TIP through the Test Stand to integrate and instrument this Acoustic Test Configuration Test Stand Radiator SC Strut simulators LAT Test Interface Plate Radiator

LAT Environmental Test PDR34 GLAST LAT Project3-4 May 2005 MGSE Requirements Flowing from Acoustic Test Plans See the table, below, for a list of all MGSE/STE that is needed for conducting the acoustic test Test Interface Plate –TIP accommodates a top deck acoustic simulator –Top deck acoustic simulator adequately simulates the acoustic behavior of the SC Dust Tent –Capable of providing clean, dry environment before/during/after acoustic testing –Provides clearance around LAT –Does not impact the acoustic response of the LAT or acoustic environment in the chamber during testing SC Strut Simulators –Provides flight-like interface to simulate SC struts that support the Radiators –Interface with Radiator at flight interface, and with Test Stand Chill Bars –Capable of handling acoustic loads (obviates need to de-/re-integrate them) MGSE/STE Needed for Acoustic Testing

LAT Environmental Test PDR35 GLAST LAT Project3-4 May 2005 Auxiliary Cooling and Mechanical Handling Auxiliary cooling plans –LAT needs to be cooled during LPT’s before and after acoustic testing Chill Bars: one under each of the two X-wings on the Grid X-LAT Aux Cooling: using fly-away cooling lines already mounted to X-LAT Plate –This is room-temperature cooling to remove LAT process heat –To simplify cooling connections, Chill Bars and X-LAT cooling will be designed to handle acoustic loads –We may be able to leave all hoses and fittings connected during the test (TBR), otherwise will quick-disconnect them Handling and mechanical operating procedures –LAT lifting procedure –Radiator integration procedure –Test Stand handling and operating procedure –Dust tent handling and operating procedure –LAT auxiliary cooling system operating procedure

LAT Environmental Test PDR36 GLAST LAT Project3-4 May 2005 MGSE Issues for Acoustic Testing Dust Tent –This is likely needed for acoustic testing, but is still TBR –If needed, what is impact of dust tent on acoustic environment in the chamber? –Dust tent will need to be designed to not overly-attenuate sound pressure levels Transportation issues –The acoustic chamber has a ¾” door sill/threshold We plan to build a ramp to roll up and over the sill This will definitely by prototyped with the pathfinder, since the LAT c.g. is moderately high –Test Stand will be moved into the room with an electric forklift We need to verify that it can position the LAT adequately

LAT Environmental Test PDR37 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Plan – Constraints –EGSE Constraints Cables –Disconnected during vibration –Must be long enough to reach LAT while mounted to either expander head or slip table –Cable trays or protection if laid on floor Cart with EGSE Hardware –Portable, can be rolled out of the way –Power interface to lab?

LAT Environmental Test PDR38 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Configuration Mechanical Configuration –Radiators attached (with flight thermal joint) Need to ensure thermal joint has enough time to cure (7 days RT) –Mounted to GD/Spectrum Astro-provided test flexures Test flexures will be proof tested at SLAC prior to GRID static test Mounted on LAT acoustic test stand –LAT Z-axis is vertical –Access to connectors needed (ladder around MGSE) on +X side –Layout needed to check cable run lengths Electrical Configuration –SLAC purchased accelerometers are voltage type and have connectors, with a special proprietary triax connector Adapters will be needed to interface with NRL equipment ACD accelerometer interface to be verified –Strain gauges do not have connectors (open leads) –EGSE needed for LPTs between axes (Rich Baun to define requirements)

LAT Environmental Test PDR39 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Configuration – Instrumentation Test instrumentation by subsystem, total of 57 channels, calibrated and installed by SLAC I&T, final checkout by NRL Anti-Coincidence Detector10 Accel Channels10 Uni (9 Fly-away)0 Tri (0 Fly-away) Trackers7 Accel Channels7 Uni (7 Fly-away)0 Tri (0 Fly-away) Calorimeters6 Accel Channels0 Uni (0 Fly-away)2 Tri (2 Fly-away) Electronic Boxes9 Accel Channels5 Uni (3 Fly-away)2 Tri (2 Fly-away) Mechanical Systems25 Accel Channels1 Uni (1 Fly-away)8 Tri (0 Fly-away)

LAT Environmental Test PDR40 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Configuration – Instrumentation The STE will be centered in the acoustic chamber, rotated to an angle of approximately degrees, as measured between the Radiator surface and chamber sidewall Additionally, there will be a plastic sheet placed under the STE to help identify any items that may come loose as a result of the acoustic vibration. M1, ACD Mid-pnl M2, ACD Mid-pnl M3, ACD Mid-pnl M4, ACD Mid-pnl M5, RAD Mid-pnl M6, RAD Mid-pnl ~36” Acoustic Chamber M7, monitor only LAT

LAT Environmental Test PDR41 GLAST LAT Project3-4 May 2005 Acoustic Test Planning: Detailed Sequence Pre-test Activities –Chamber Setup and empty cell calibration This is needed to verify the test cell is clean and ready to accept the LAT for testing The empty cell calibration will verify that the specified sound pressure levels can be achieved –Move LAT on dolly (radiators already installed) into chamber and set orientation to the appropriate angle –Cable Hook-ups and system checkouts Electrical connections to shaker system and accel tap checks (NRL) Electrical connections to EGSE and perform LPT on expander head (SLAC) –LPT on acoustic test stand Low-Level run at -6 dB for 30 seconds (establish pre-test signature, review data) –Set-up sheet printouts (NRL), verification and approval (SLAC) –If LPT results okay, disconnect EGSE cables and close chamber door –Purge chamber of air –Run Test –Output Data, accel ASD’s and strain gauge SSD’s (NRL) –Review data (SLAC) Check for “dead” channels Review mic average for level and chamber uniformity Review Grms values for obvious anomalies –Give Okay to proceeed (SLAC), or decide if alternate action is needed

LAT Environmental Test PDR42 GLAST LAT Project3-4 May 2005 Acoustic Test Planning: Detailed Sequence (cont.) Full-Level run at -0 dB for 60 seconds (impart full SPL, check SPL, linearity, review data) –Set-up sheet printouts (NRL), verification and approval (SLAC) –Run Full level Test As level steps up to -3dB, check critical channel linearity and record data Hold at full level for 60 seconds –Immediately following full level run, perform low level run Do not review data between full level and post-test low level run –Output Data accel ASD’s and strain gauge SSD’s (NRL) –Review data (SLAC) Check for “dead” channels Review mic average that PFQ level is met and chamber uniformity Review Grms values for linearity –Give Okay to proceeed (SLAC), or decide if alternate action is needed

LAT Environmental Test PDR43 GLAST LAT Project3-4 May 2005 Acoustic Test Planning: Detailed Sequence (cont.) Low-Level run at -6 dB for 30 seconds (Signature check, review data, complete axis) –Output Data (NRL) –Review data (SLAC) Check for “dead” channels Review mic average for level and chamber uniformity Review pre- and post- test overlays for frequency shifts and amplitude changes –Give Okay to proceeed (SLAC), or decide if alternate action is needed Post- Acoustic Test Activities –Fill chamber with air (may be done automatically following final low-level run) –Connect EGSE and perform LPT –Visually inspect plastic sheet under LAT –If everything looks okay, give okay to break configuration –Disconnect all electrical connections –Move LAT out of chamber

LAT Environmental Test PDR44 GLAST LAT Project3-4 May 2005 Acoustic Test – Configurations – Deviations From Flight The LAT is mounted to STE, which is intended to simulate the influence of the SC volume and geometric proximity on acoustic pressures immediately adjacent to significant LAT surfaces, such as the Radiators and XLAT plate –The SC top deck and lower radiator strut mounts were identified as the critical regions for SC simulation The top deck simulator will be of the same construction as the SC top deck and will be attached to the TIP MGSE The lower radiator strut mounts will have a similar interface with the radiators and the stiffnesses will be approximated, but cross-coupling and stiffness differences will not be captured in this test SC-LAT cabling is not connected for this test, so these connections, the cable harnesses, and the attachment methods are not verified as part of this test –These will be verified at the Observatory acoustic test

LAT Environmental Test PDR45 GLAST LAT Project3-4 May 2005 Acoustic Test – Document List and Status LAT-MD-00408: LAT Instrument Performance Verification Plan LAT-MD-02717: LAT Environmental Test Sequence LAT-MD-01196: LAT Dynamics Test Plan LAT-MD-01533: LAT EGSE Plan LAT-MD-00649: LAT Transportation and Handling Plan LAT-MD-00404: LAT Contamination Control Plan LAT-SS-00778: LAT Environmental Spec LAT-TD-00890: LAT Instrumentation Plan

LAT Environmental Test PDR46 GLAST LAT Project3-4 May 2005 Acoustic Test – Test Logistics Test Personnel –Test support personnel have been identified (to be verified) Test Director: John Ku (SLAC) Test Conductor: Bob Haynes (NRL) Discipline Lead: Jim Haughton (NRL) Facility Manager:Bill Raynor (NRL) MGSE Lead: Martin Nordby (SLAC) EGSE Lead: Mike Huffer (SLAC) Test Script Lead: Rich Baun (SLAC) High-bay operations: Paul Dizon (NRL) Quality Assurance: Joe Cullinan (or Doug Bartholomew) (SLAC) I&T: Ken Fouts (SLAC) –Subcommittees will be assembled from the appropriate personnel above, with expert consultation brought in if needed Potential Vibration Experts: Paul Baird; Chris Fransen; Bill Haile

LAT Environmental Test PDR47 GLAST LAT Project3-4 May 2005 Acoustic Test – Open Issues Many logistics have been closed already; the logistics that still need consideration are: –Lip at threshold (how to transport into room) Accommodation for moving Test Stand over ½” door sill Use pneumatic wheels or air bearings? –Cleanliness (need blanket?) – is rating worse than 100K? –Instrumentation feedthrough and cable supports –Is a dust tent needed around LAT in acoustic chamber –What type of panels are needed in/around LAT to simulate SC response Complete structural analysis of MSGE Complete pre-test analysis –Verify top plate simulator attached to TIP MGSE adequately replicates SC response 5 action items are open and being tracked. –All actions have clear closure paths and are actively being worked on

LAT Environmental Test PDR48 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Plan Overview Objectives –The primary objective of this test is to measure and/or calculate the overall mass and CG of the fully integrated LAT, to verify that it meets the IRD [433-IRD-0001] requirements of: Mass is less than 3000 kg Z-cg is a maximum of 185mm above the LAT Interface Plane (LIP) –Because of the difficult involved in measuring Zcg, this requirement will be verified through calculations, based on measurements of all LAT constituents. –From the Xcg and Ycg measurements and comparison with calculated values, an appropriate confidence level can be established and applied to the Zcg calculations. X-cg and Y-cg are within 20mm of LAT Coordinate System (LCS) Z-axis –A secondary objective is to verify measured mass properties match well when compared with the math model mass matrix. Due to the complexity of measuring moments of inertia, only mass and CG properties will be validated. Differences will be reconciled by updating the math model to reflect measured values Since structural dynamics is intimately tied with mass and stiffness, mass property updates are important to preserve the true dynamic behavior of the LAT. Test Plan –This is a new addition to the test plan draft 3 –Many technical details have been addressed in previous meetings – the current draft is very mature and should be released in 1-2 weeks –All needed instrumentation has been identified, but MGSE design is still needed

LAT Environmental Test PDR49 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Plan Overview Test Plan (Continued) –Entrance/Exit Criteria; from the test plan: The LAT mass properties test is performed following the LAT thermal vacuum test and the subsequent CPT and removal of the radiators. Criteria which must be met before this test can be executed are: –LAT Radiators have been removed and the LAT, Flexures and TIP have been moved into the mass properties test area—visual inspection verifies that all the LAT has been re-configured correctly. All travelers verified to be complete. The LAT is in its flight configuration, except as detailed in Section 10.3, below. –All subsystem units/modules function—each subsystem has passed its CPT following TVAC. Any performance discrepancies have been clearly documented. –All non-fly-away accelerometers and other test instrumentation, cables and harnesses are removed. Following the mass properties test, an aliveness will be performed. The criteria for declaring a successful completion of the mass properties test are: –Visual inspection of the LAT—indicating that there is no visible damage to the LAT –Successful completion of the aliveness test—verifying that all components and subsystems are still properly interconnected. –Preliminary analysis of test data—verify that all recorded data is useable for analysis purposes

LAT Environmental Test PDR50 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Plan – Constraints –MGSE Constraints Platform to distribute weight into three load cells –Must be stiff enough to carry load from TIP (four points) to load cells (three points), i.e. to evenly distribute load from the four flexures –Must be light enough to not affect load cell accuracy (use load cells with highest possible accuracy and precision; load cell precision generally goes down with increased capacity) –Must have a way to precicely locate the LAT and TIP with respect to some arbitrary reference coordinate system –Must be able to accommodate the LAT in 0 and 90 degree orientations –EGSE Constraints Cables –Disconnected during vibration Cart with EGSE Hardware –Portable, can be rolled out of the way –Power interface to lab?

LAT Environmental Test PDR51 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Configuration Mechanical Configuration –Radiators not attached MGSE to hold DSHP and XLHP attached –Mounted to GD/Spectrum Astro-provided test flexures Test flexures will be proof tested at SLAC prior to GRID static test TIP to interface test flexures and weight and CG test platform –LAT Z-axis is always vertical –All unnecessary instrumentation removed (such as removable accels) Electrical Configuration –No electrical connections to the LAT –16 Strain gauges and 3 load cells are the only instrumentation needed –EGSE needed to verify “aliveness” after weight and CG test

LAT Environmental Test PDR52 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Configuration – Instrumentation Test instrumentation by intrument type; Load cells installed by NRL; Strain gauges installed by SLAC I&T Load Cells3 Channels3310 lbf peak15 lbf resolution Strain Gauges16 Channels350 ue peak6 ue resolution h aa LAT cg F1F1 F2F2 F3F3 x y W tot =F 1 +F 2 +F 3 X cg = (F 2 -F 3 )*a/W tot Y cg = F 1 *h/W tot

LAT Environmental Test PDR53 GLAST LAT Project3-4 May 2005 Weight and CG Test Planning: Detailed Sequence Weight and CG Run –Instrumentation check—use dummy masses to verify that all instrumentation is operational and taking useful data –Align LAT on test platform –Measure overall mass and centers of gravity –Rotate LAT 90 degrees and align to test platform –Measure overall mass and centers of gravity –Aliveness Test—execute aliveness test after LAT has been packed in shipping container

LAT Environmental Test PDR54 GLAST LAT Project3-4 May 2005 Weight and CG Test – Configurations – Deviations From Flight The LAT is mounted to STE (flexures and TIP), which is not part of the flight LAT structure. Radiators not attached –Radiator mass will be added to the LAT math model MGSE to hold DSHP and XLHP attached –The added weight will be subtracted from the LAT math model –The added weight is insignificant and within the measurement precision of the load cells SC-LAT connector savers are attached during this test –The added weight will be subtracted from the LAT math model –The added weight is insignificant and within the measurement precision of the load cells

LAT Environmental Test PDR55 GLAST LAT Project3-4 May 2005 Weight and CG Test – Document List and Status LAT-MD-00408: LAT Instrument Performance Verification Plan LAT-MD-02717: LAT Environmental Test Sequence LAT-MD-01196: LAT Dynamics Test Plan LAT-MD-01533: LAT EGSE Plan LAT-MD-00649: LAT Transportation and Handling Plan LAT-MD-00404: LAT Contamination Control Plan LAT-SS-00778: LAT Environmental Spec LAT-TD-00890: LAT Instrumentation Plan

LAT Environmental Test PDR56 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Logistics Test Personnel –Test support personnel have been identified (to be verified) Test Director: John Ku (SLAC) Test Conductor: Bob Haynes (NRL) Discipline Lead: Jim Haughton (NRL) Facility Manager:Bill Raynor (NRL) MGSE Lead: Martin Nordby (SLAC) EGSE Lead: Mike Huffer (SLAC) Test Script Lead: Rich Baun (SLAC) High-bay operations: Paul Dizon (NRL) Quality Assurance: Joe Cullinan (or Doug Bartholomew) (SLAC) I&T: Ken Fouts (SLAC) –Subcommittees will be assembled from the appropriate personnel above, with expert consultation brought in if needed Potential Vibration Experts: Paul Baird; Chris Fransen; Bill Haile

LAT Environmental Test PDR57 GLAST LAT Project3-4 May 2005 Weight and CG Test – Test Logistics Many logistics have been worked out already; the remaining logistical issues are: –Where to perform this test –How to precisely align the LAT with respect to the load cells –Finalize load cell selection Ensure load cells availability Ensure load cells meet precision requirements Provide load cell ICD to SLAC for MGSE design Other work to be performed –Design the weight and CG Test platform to the requirements –Perform structural analysis of MGSE and test platform A/I Closure plans –Currently NO OPEN ACTION ITEMS!!!