MICE CM15 Alain Blondel 8 June 2006 1 MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

MICE CM15 wrap-up Alain Blondel 11 June MICE CM 15 wrap-up Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. thanks.
12/5/2008NuMu Collaboration Friday Meeting 1 Status Report on MANX Proposal Draft Bob Abrams Muons, Inc.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
CMPB Alain Blondel 14 April STATUS OF MICE.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Project manager report paul drumm CM16 October 2006.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE Phase 1 Koji Yoshimura KEK June
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Accelerator R&D for Future Neutrino Projects
Presentation transcript:

MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and progress -- new collaborators -- goals of the meeting thanks to Alan Bross, Malcolm Ellis, Jean-Sebastien Graulich and Jim Norem for organisation of the meeting and agenda

MICE CM15 Alain Blondel 8 June MICE and the big picture There is a lot of discussion on neutrinos among the highest priorities in particle physics: Neutrino masses ARE new physics and desserve a dedicated programme Both the EP2010 and the CERN Council Strategy Document emphasize the need for 1. a coordinated accelerator neutrino oscillation programme at an intercontinental level. 2. (especially in the CERN report:) high priority for related R&D (i.e. 5th) -- LHC commission to design luminosity -- preparation for LHC upgrade -- CLIC -- high performance magnets -- a strong participation in the R&D towards a high intensity neutrino facility Of Course in MICE we are doing just that: R&D towards a high intensity neutrino facility at an international level.

MICE CM15 Alain Blondel 8 June main news on reviews -- tracker review : 20 April 2006 good progress. Understanding of light loss at  10% level, procedures proposed to fix it and to implement quality control. Will go through construction of scintillating fiber planes and verify quality once the first one is ready (exp date: September) Pointed out the need for a good definition and methodology for MICE alignment. EXPECT TRACKER TO BE WELL ON TIME -- Beam line review: to take place at the MICE collab. meeting Monday 12 June -- Target review: to take place at the MICE collab. meeting Monday 12 June test was delayed to October This is only acceptable because start of MICE slipped… … no more slippage acceptable. -- Spectrometer solenoid review: to take place today SC wire has been purchased. Bids for construction of the magnet have been received. To be chosen by LBNL. Consistency of chosen offer with MICE requirements will be reviewed.

MICE CM15 Alain Blondel 8 June D&S Reviews a very important process in MICE!

MICE CM15 Alain Blondel 8 June PID: Test beam in Frascati July 2006! EMCal Kloe module in construction, more scintillator behind TOF TOF0 BC420 counters and lightguides are ready. (Cheaper Ukrainian scintillator will also be tested) Readout options 1) TDC+CF discriminator, 2) splitter+TDC +ADC ) will be tested. -- PID Downstream PID change request (no more CKOV2 -- size of TOF2/EMCAL?) CKOV1 proposal now ready -- DAQ: Readout in view of Frascati beam test in July 2006 on the longer run: use of ALICE framework (DATE)?

MICE CM15 Alain Blondel 8 June New collaborators and funding news: Japanese bid (by Y. Mori U. Kyoto) was not approved for 2006 (tracker, L.H2 absorber) will re-apply next year. Italy: will be discussed after test beam if that is succesful (TOF, E-M-Cal) UK: MICE phase II bid in preparation

MICE CM15 Alain Blondel 8 June MICE RF power station from CERN Request was submitted to CERN AB division and approved - 170kCHF and 3 man months response from CERN DG: Dear Steve, - MICE: your memo of 13 April 2006 Contribution to the refurbushing and commissioning of two 200 MHz high power RF amplifiers Agreement from the DG to use resources from CERN to the level of 3 man/month of CERN staff and 173 kCHF and only if UK is contributing for CLIC

MICE CM15 Alain Blondel 8 June New collaborators and funding news (ctd): Better news: -- excellent report by MUTAC! -- DOE has agreed to 300k$ of supplemental funds for the MUCOOL Coupling Coil (CC) (still waiting for the answer of NSF on the CC request) New collaborators will apply to join MICE at the CM 15: -- New Hampshire (U. Bravar et al.) simulation, optics, analysis -- Cockcroft Inst.& Lancaster University (R. Seviour) RF cavity surface studies -- ICST Harbin in People’s Republic of China (Lin Jia, Li Wang)

MICE CM15 Alain Blondel 8 June Dr Lin Jia Director Dr Li Wang Associate-Director Dr Lin Jia (also US passport) will be joining the collaboration meeting in Fermilab to apply to the MICE CB great credit to be given to Mike Green(LBNL) !

MICE CM15 Alain Blondel 8 June funding and manpower for engineering is available, funding for construction will need to be submitted to government. expected time to completion ~18-24 mo. If this goes through, one of the main uncertainties for MICE phase II will have a solution in sight.

MICE CM15 Alain Blondel 8 June PHASE II preparation Some key issues are -- LH2 RAL (safety review was passed -- actions pending) -- MUCOOL RF cavity FNAL construction of 200 MHz cavity and power up have been major milestones for MICE Operation of RF cavity in magnetic field is the most wide open scientific question in MICE RF noise, field emission, max field? we will hear more about this and possibly first measurement results? + simulation and analysis work (step III, and following ones)

MICE CM15 Alain Blondel 8 June of MICE and MANX MANX LOI was submitted in may 2006 to Fermilab MANX is a cooling system based on a helicoidal focusing channel a very challenging magnet (3-5m long SC) around L.He. absorbers. Claim of 500% cooling (vs 10% for MICE) incl. long. emittance reduction. It is suggested that MANX can eventually be tested in the RAL muon beam, using the spectrometers and diagnostics of MICE Caveats: -- the matching of all this has not been completely demonstrated -- the gauge ‘how much beam is cooled’ may not be the same between MANX LOI and MICE -- re-acceleration of muons after such cooling requires matching to RF cavity modules such as those of MICE -- not demonstrated either -- MICE is an approved experiment (this was hard enough!) and will be completed as proposed Given these caveats, we certainly support MANX and wish it success, as a possible follow-up on MICE. Looking forward to fruitful collaboration (more on this in this meeting) « PHASE III: »

MICE CM15 Alain Blondel 8 June NEWS since Osaka: The ISIS shut down has been delayed NEW « FIRST BEAM DATE » FOR MICE: 1 October 2007 (this is infortunate for outside university groups for whom summer is ’special’) 15 March: The IMC has agreed yesterday to start the long shutdown in December This means that there will be an extra cycle 2006/5 this year, starting on 14 November and ending on 18 December During the long shutdown, the new EPB to the second target station will be installed and the problems with some of the magnets in EPB1 will be addressed. This work and more will go on from January 2007 to August During September 2007 there will be commissioning of part of the EPB2 and TS1 with beam. The first user cycle 2007/1 is expected to start on 1 October Every effort should be made to carry out all proposals submitted & accepted in the current call before the end of 2006, so that we go with a clean slate into the long shutdown. There will be no Call for Proposals in October The proposal round in April 2007 with FAPs in June 2007 will determine the programme from October 2007 onwards. The user community will be informed of this in the current call for proposals.

MICE CM15 Alain Blondel 8 June Thus we have *480* days to data taking However: this increases the pressure on us to do everyting swiftly once we have the beam: less time for phase I and II! Preparations (DAQ, reconstruction, Software, procedures and detectors) hace to be prepared longer in advance…

MICE CM15 Alain Blondel 8 June STEP I: 1 October 2007 = 480 days away! STEP II: soon after (a few months) PHASE I  MAIN GOAL of meeting: Understand where we stand in our preparations for Steps I and II. -- beam line: target, optics, tuning and correction abilities, diffuser -- TOF, Cherenkov1, EMCAL (size of shield&TOF2&EMCAL must be decided) -- tracker -- spectrometer solenoid -- installation and cabling -- controls and monitoring -- trigger, DAQ and event processing -- software: upstream and downstream particle ID, reconstruction of tracks -- analysis: form run plan, reconstruction of « beam», emittance, transmission