NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

Software Quality Assurance Plan
EQUIPMENT VALIDATION.
NAVAL REACTORS PROGRAM TMDE Status
NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Requirements and Interfaces Erik Johansson and Chris Neyman NGAO PD Team Meeting #6 Thursday, March 19, 2009.
Requirements Specification
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
The Act Tab (Project). Please select a button to learn more. Welcome to the Project Act Tab. Here you can Add Team Members, provide and receive Feedback,
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Project Management Body of Knowledge PMBOK
Introduction to Computer Technology
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
0 Un ited States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Enterprise Architecture Working Group.
Software as a Medical Device (SaMD) Application of Quality Management System IMDRF/WG/N23 Proposed Document (PD1)R3.
Feature Synopsis Multiple incentive groups support. Incentive groups with employees direct or at organization level. Multiple responsibilities support.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
The County of Fresno eContracts System Tracking your contracts is just a few clicks away!
Standard 4 – Inspection Audit Program
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Organizing Your Financial Records
Safety demands strict documentation management (from initial requirements to the final design of the system) Bojan Zalar
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
Timeline and Milestones. The first step to any plan is thinking about a timeline. You want to know what needs to get done and when, to ensure that you.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative IT Governance Subcommittee Working Session.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Software Configuration Management
CMMI Q & A.
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
NGAO System Design Project Plans and Schedule
Connected Vehicle Reference Implementation Architecture (CVRIA)
PSS verification and validation
Presentation transcript:

NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference

2 Outline Interface control process Tracking changes How interfaces are reviewed and approved Interface control documents Timeline Discussion

3 Interface requirements are the basis of the IC process Interfaces “standard section” of all Keck requirements documents –Other sections Overall, Optical, Mechanical, Electrical, Safety, etc. Use Contour data base and interface “field” on existing requirements Build a collection linked to requirements on both sides of interface –i.e. Optical AO  Optical Instrument ( f/# must be that same on both sides) Include explicit “interface” sections and implicit interfaces in other sections (Optical, Mechanical, Electrical, Safety, Software, etc.)

4 Tracking changes to interface requirements “Tags” and notifications for tracking changes to either “side” –Neyman (IC lead) –Design team leads on each side of interface –Set notifications in Contour for yourself (easy Johansson/Neyman help) Already beta tested this process in Contour –Some setup time required –Minimal maintenance afterwards

5 Formal review of interfaces after requirements changes for build to cost Verify that requirements on “both sides” are equivalent Key that design teams communicate Already good across team –Instruments  AO optical  WFS –Laser  Multi command sequencer software –And so forth. Should require minimal work if requirements review is successful Formal procedure same as requirements review –see E. Johansson presentation

6 Interface documents organized from Contour reports Organized into about ~20 documents –First cut in graph at bottom Use MOSFIRE document as template –Keck standard from Sean Adkins Review for Build to Cost changes

7 Time line for ICD process/review March – Middle April (4/14) –Teams review all requirements (see E. Johansson presentation) –Finalize Interface review teams –Finalize N 2 diagrams and number of ICD documents –Create interface collections with links, tags, and notifications Middle April (4/14) – May 1 –Interface teams review interfaces (Design team leads (2) + Sys. Eng. team (1)) May –Produce Draft ICD documents from Contour reports

8 Discussion Any questions?