14 July 2003 American Linear Collider Workshop M. Breidenbach 1 SD, an Introduction SD = Silicon Detector –Motivation –Simulation –Description –Status.

Slides:



Advertisements
Similar presentations
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Advertisements

March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
R Frey 9/15/20031 Si/W ECal Update Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4 Ray Frey M. Breidenbach, D. Freytag,
7 June 2006 SLAC DOE Review M. Breidenbach 1 KPiX & EMCal SLAC –D. Freytag –G. Haller –R. Herbst –T. Nelson –mb Oregon –J. Brau –R. Frey –D. Strom BNL.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Design Considerations for a Si/W EM Cal. at a Linear Collider M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator.
M. Woods (SLAC) BI Tests for the Linear Collider Turning the LOI into a Proposal SLAC ALCPG Meeting Jan. 9, 2004 M. Woods, SLAC LC-LEP Beam Tests at SLAC.
Track Timing at e + e - Linear Collider with the Silicon Drift Detector Main Tracker R. Bellwied, D. Cinabro, V. L. Rykov Wayne State University Detroit,
NIU Workshop R. Frey1 Reconstruction Issues for Silicon/Tungsten ECal R. Frey U. Oregon NIU Workshop, Nov 8, 2002.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
1 Benchmarking the SiD Tim Barklow SLAC Sep 27, 2005.
ICLC Paris R. Frey1 Silicon/Tungsten ECal for SiD – Status and Progress Ray Frey University of Oregon ICLC Paris, April 22, 2004 Overview (brief) Current.
LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center.
SiD Cal R. Frey1 Some EGS Studies… Compare with Geant4  Questions of range/cutoff parameters EM Resolution understood? Moliere radius – readout gap relation.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
10 July 2001Snowmass 2001 M. Breidenbach1 This Detector Can’t Be Built without lots of work.
Jim Brau, Amsterdam, April 4, Jim Brau April 4, 2003 The Other Detectors and Associated R&D In addition to the TESLA detector, some other detector.
1 The ILD LoI IDAG Referees for ILD Benchmarking – J.A. Hewett, W.G. Li Tracking – R. Nickerson Calorimetry – D. Green MDI – T. Himmel.
ALCPG Simulation Status and Plans ECFA LC Workshop, Durham Sep. 2, 2004 Norman Graf (SLAC)
Fine Pixel CCD Option for the ILC Vertex Detector
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
1Frank Simon ALCPG11, 20/3/2011 ILD and SiD detectors for 1 TeV ILC some recommendations following experience from the CLIC detector study
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
The Silicon Detector Concept Taipei ACFA Meeting November 9, 2004 John Jaros.
“Huge” Detector Concept 3 Sep 2004 ECFA LC Durham Satoru Yamashita ICEPP, University of Tokyo On behalf of many colleagues Towards our common.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Silicon/Tungsten ECal for the SD Detector – Status and Progress R. Frey U. Oregon UT Arlington, Jan 10, 2003.
Palaiseau, 13/1/ 2005 P. Colas - Optimising tracking 1 Optimising a Detector from the Tracking Point-of-View P.Colas, CEA Saclay constraints role Optimisation.
Oct/12/07 Su DongSiD Tracking Meeting1 Thoughts on VXD Sensor Configuration Su Dong.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
FCAL Krakow meeting, 6. May LumiCal concept including the tracker R. Ingbir, P.Růžička, V. Vrba.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
16 August 2005 SiD Snowmass 05 M. Breidenbach 1 SiD Expectations from the Design Study –Motivation –What We Need! –Technical efforts –Status.
The Other Detectors and Associated R&D
SiD R&D Plan and Opportunities for New Collaborators
SiD Calorimeter R&D Collaboration
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Linear Collider Detector
Report about “Forward Instrumentation” Issues
The LHC collider in Geneva
SiD Electronic Concepts
Linear Collider Simulation Tools
Simulating the Silicon Detector
The Silicon Detector for the LC
SiD Tracker Concepts M. Breidenbach
FPCCD Vertex Detector for ILC
Linear Collider Simulation Tools
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
SVT detector electronics
Presentation transcript:

14 July 2003 American Linear Collider Workshop M. Breidenbach 1 SD, an Introduction SD = Silicon Detector –Motivation –Simulation –Description –Status

14 July 2003 American Linear Collider Workshop M. Breidenbach 2 LC Detector Requirements –a) Two-jet mass resolution comparable to the natural widths of W and Z for an unambiguous identification of the final states. –b) Excellent flavor-tagging efficiency and purity (for both b- and c-quarks, and hopefully also for s-quarks). –c) Momentum resolution capable of reconstructing the recoil- mass to di-muons in Higgs-strahlung with resolution better than beam-energy spread. –d) Hermeticity (both crack-less and coverage to very forward angles) to precisely determine the missing momentum. –e) Timing resolution capable of separating bunch-crossings to suppress overlapping of events.

14 July 2003 American Linear Collider Workshop M. Breidenbach 3 Detector Response Simulation Flexible software framework to study performance as a function of R cal, B, etc. Inclusion of beamline elements, masks,… –All backgrounds included (machine, physics,…) Better detector modeling: –Real geometries, support material, etc. Improved simulation of detector response –digitization, merged hits, “ghost” hits, eff’s SLAC Simulations Group: N. Graf, G. Bower,T. Behnke, R. Cassell, A. Johnson

14 July 2003 American Linear Collider Workshop M. Breidenbach 4 Detector Response Simulation II Determine detector response as a function of basic parameters  “slopes”. Use SD as pivot point from which to extrapolate. Systematic understanding of the complete detector. Ab initio reconstruction: –Track finding & fitting, calorimeter cluster reconstruction from realistic detector hits.

14 July 2003 American Linear Collider Workshop M. Breidenbach 5 International Collaboration Both simulation environments can now model the other’s detectors in Geant4. European and American efforts have converged on common MC data I/O format. –Allows swapping of detectors. Aiming for common reconstruction environment and output format. –Direct reconstruction comparison, code sharing!

14 July 2003 American Linear Collider Workshop M. Breidenbach 6 SD (Silicon Detector) Conceived as a high performance detector for NLC Reasonably uncompromised performance But Constrained & Rational cost –Detectors will get about 10% – of the LC budget: 2 detectors, –so $350 M each Accept the notion that excellent energy flow calorimetry is required, and explore optimization of a Tungsten-Silicon EMCal and the implications for the detector architecture…

14 July 2003 American Linear Collider Workshop M. Breidenbach 7 Architecture arguments Silicon is expensive, so limit area by limiting radius Get back BR 2 by pushing B (~5T) –This argument is very dependent on the cost of Si, which is largely unknown for these quantities….) Maintain tracking resolution by using silicon strips Buy safety margin for VXD with the 5T B-field. Keep (?) track finding by using 5 VXD space points to determine track – tracker measures sagitta.

14 July 2003 American Linear Collider Workshop M. Breidenbach 8 SD Configuration Scale of EMCal & Vertex Detector

14 July 2003 American Linear Collider Workshop M. Breidenbach 9 Vertex Detectors Design CCD’s for –Optimal shape ~2 x 12 cm –Multiple (~18) ReadOut nodes for fast readout –Thin -≤ 100 µ –Improved radiation hardness –Low power Readout ASIC –No connectors, cables, output to F.O. –High reliability –Increased RO speed from SLD VXD3 –Lower power than SLD VXD3 –Detailed (preliminary) spec coming along…

14 July 2003 American Linear Collider Workshop M. Breidenbach 10 Vertex Detectors, continued Mechanical –Eliminate CCD supports, “stretch” Si. –Very thin beampipes?? –Cooling Simulation –Quantify/justify needs SLD VXD3 has been removed from SLD for damage analysis of CCD’s.

14 July 2003 American Linear Collider Workshop M. Breidenbach 11 Silicon Tracker SLC/SLD Prejudice: Silicon is robust against machine mishaps; wires & gas are not. Silicon should be relatively easy to commission – no td relations, easily modeled Lorentz angle, etc. SD as a system should have superb track finding: –5 layers of higly pixellated CCD’s –5 layers of Si strips, outer layer measures 2 coordinates –EMCal provides extra tracking for Vee finding - ~1mm resolution! Mechanical: –Low mass C-Fiber support structure. Goal is support for a 10 cm x 4 m ladder of ~125 grams! –Chirped Interferometry Geodesy (Oxford System) Atlas has developed a beautiful chirped interferometric alignment system – a full geodetic grid tieing together the elements of their tracker. Can such a system reduce requirements on the space frame precision and stability – reducing its mass and cost?

14 July 2003 American Linear Collider Workshop M. Breidenbach 12 Tracker, continued Silicon Development –Build on GLAST development, Utilize GLAST detector style w wire bond pads on both ends, and String 10 cm square detectors to barrel half lengths and readout from ends. Reduce mass, complexity at ends –Tracker Electronics Architecture : Design “end” detectors to route strips to rectangular grid for bump bonding to read out chip (ROC). ROC is ASIC with all preamplification, shaping, discrimination, compression, and transmission functionality. Includes power pulsing. Hasn’t been done!

14 July 2003 American Linear Collider Workshop M. Breidenbach 13 Silicon Tungsten EMCal Figure of merit something like BR 2 /  –where  = r pixel  r Moliere Maintain the great Moliere radius of tungsten (9 mm) by minimizing the gaps between ~2.5 mm tungsten plates. Dilution is (1+R gap /R w ) –Could a layer of silicon/support/readout etc. fit in a 2.5 mm gap? (Very Likely) –Even less?? 1.5 mm goal?? (Dubious) Requires aggressive electronic-mechanical integration!

14 July 2003 American Linear Collider Workshop M. Breidenbach 14 Structure Pixels on 6” Wafer

14 July 2003 American Linear Collider Workshop M. Breidenbach 15 Ramp Thresho ld Ref Mu x 12 bit ADC Log ic 8.3 ms 200 ns High Gain Low Gain Shaper VCal Cf Ccal Charge amplifier and shaper followed by two amplifiers with gains G1,G2 and sample & holds. Comparator logic to select appropriate range Mux and 12 bit ADC Studying options for timing… Electronics Architecture

14 July 2003 American Linear Collider Workshop M. Breidenbach 16 Thermal Management Cooling is a fundamental problem: GLAST system is ~2 mW/channel. Assume 1000 pixels/wafer and power pulsing duty factor for NLC of (10 Hz), for 2 mW average power. Preliminary engineering indicates goal of under 100 mW ok. Assume fixed temperature heat sink (water cooling) at outer edge of an octant, and conduction through a ~1 mm thick Cu plane sandwiched with the W and G10: ΔT~20 0 C. OK, but need power pulsing!!!..and maintaining the noise/resolution is a serious engineering challenge.

14 July 2003 American Linear Collider Workshop M. Breidenbach 17 Hcal assumed to be 4 thick, with 46 layers 5 cm thick alternating with 1.5 cm gaps. Prefer “digital” detectors, e.g. high reliability RPC’s (Have they been invented yet???) Probably glass RPC. Hcal radiator non-magnetic metal – probably copper or stainless –Tungsten much too expensive –Lead possible, but mechanically more painful. Hcal thickness important cost driver, even though Hcal cost small. And where is it relative to coil? HCal

14 July 2003 American Linear Collider Workshop M. Breidenbach 18 HCal Location Comparison Hcal inside coil HCAL outside coil Coil Scale – Relative to 4 Inside!! 80 M$ 60 M$ 40 M$ 20 M$ 0 M$ -10 M$ -20 M$ -30 M$ 2   4 6

14 July 2003 American Linear Collider Workshop M. Breidenbach 19 Solenoid field is 5T – 3 times the field from detector coils that have been used in the detectors. - CMS will be 4T. Coil concept based on CMS 4T design. 4 layers of superconductor about 72 x 22 mm, with pure aluminum stabilizer and aluminum alloy structure. Coil  r about 85 cm Stored energy about 1.5 GJ (for Tracker Cone design, R_Trkr=1.25m, cos  barrel =0.8). (TESLA is about 2.4 GJ) [Aleph is largest existing coil at 130 MJ] Coil and Iron BrBr BzBz

14 July 2003 American Linear Collider Workshop M. Breidenbach 20 Flux Return/Muon Tracker Flux return designed to return the flux! Saturation field assumed to be 1.8 T, perhaps optimistic. Iron made of 5 cm slabs with 1.5 cm gaps for detectors, again “reliable” RPC’s.

14 July 2003 American Linear Collider Workshop M. Breidenbach 21 More Cost trade-offs  $ vs R_Trkr ~1.8M$/cm Delta $, Fixed BR 2 =5x Caveat: Based on $6/cm 2, $100/Kg.

14 July 2003 American Linear Collider Workshop M. Breidenbach 22 Forward Detector ALCPG IR/Backgrounds Working Group: T. Markiewicz, S. Hertzbach

14 July 2003 American Linear Collider Workshop M. Breidenbach 23 Comparison of Detector Configurations    (Ray Frey)

14 July 2003 American Linear Collider Workshop M. Breidenbach 24 Status Serious work beginning on a coherent, optimized design at SLAC & universities. Document (~ old fashioned CDR) in ~2 years.

14 July 2003 American Linear Collider Workshop M. Breidenbach 25 Extras

14 July 2003 American Linear Collider Workshop M. Breidenbach 26 High Priority Items: –dL/dE analysis complete analysis to extract both tail and core understand external inputs (asymmetries, offsets) possible to extract correlations (energy, polarization)? –Extraction line studies expected distributions with disrupted beam expected backgrounds at detectors –Forward Tracking/Calorimetry Realistic conceptual design for NLC detector Expected systematics eg: alignment –Beam Energy Width Understand precision of beam-based techniques Possible with x-line WISRD? Beamline Instrumentation ALCPG Beamline Instrumentation Working Group: M. Woods /E. Torrence/D. Cinabro

14 July 2003 American Linear Collider Workshop M. Breidenbach 27 EMCal Readout Board Silicon Diode Array Readout Chip Network Interconnect ~1m

14 July 2003 American Linear Collider Workshop M. Breidenbach 28 Beam Energy  E beam ~ 200 ppm from TeV Upstream BPM + Downstream WISRD Spect.  in forward detector (~200 mRad) Polarization  P/P ~ 0.25% (P e - only)  P/P ~ 0.10% (P e + also) Downstream Compton polarimeter t-channel WW scattering Absolute Luminosity  L/L ~ 0.2% (adequate, not perfect) Forward calorimeter around mRad Luminosity Spectrum Core width to ~ 0.1%, tail level to 1% e + e - acolinearity (necessary but not sufficient!) Luminosity, Energy, Polarization Strategy document just completed

14 July 2003 American Linear Collider Workshop M. Breidenbach 29 Luminosity Spectrum Acolinearity problems Energy, dL/dE both correlated with position along bunch. Measures boost, not s’ Energy imbalance, width imbalance must be input Independent real-time width measurements? 200 uRad kicks from disruption alone (larger than target accuraccy) Many other offsets/degrees of freedom which must be input. Putting together complete analysis including ‘realistic’ mis-aligned machine decks from TRC report

14 July 2003 American Linear Collider Workshop M. Breidenbach 30 Ongoing R&D Work: –Luminosity dL/dE analysis (SLAC, Wayne St.) Beamstrahlung Monitor (Wayne St.) Pair monitor (Hawaii, in collab. with Tohoku) Forward calorimeter (Iowa St.) –Energy WISRD spectrometer (UMass, Oregon) BPM spectrometer (Notre Dame) –Polarization x-line simulations (SLAC, Tufts) Quartz fiber calorimter (Iowa, Tennessee)  Many important topics uncovered... Beamline Instrumentation

14 July 2003 American Linear Collider Workshop M. Breidenbach 31 2cm radius 12.6cm radius 1cm radius z=3.5m Forward Detector

14 July 2003 American Linear Collider Workshop M. Breidenbach 32 SD Endplate Study