Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
Electron Model Components and Costing C. Johnstone Summary talk, C. Johnstone FFAG04 Oct 12-16, 2004 KEK, Tsukuba, Japan.
Emittance Measurement: Quadrupole Scan C. Tennant USPAS – January 2011.
Beam-Based Alignment with New Parameters Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
1 Daniel Ratner 1 Gain Length and Taper August, 2009 FEL Gain length and Taper Measurements at LCLS D. Ratner A. Brachmann, F.J.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
1 Heinz-Dieter Nuhn 1 Undulator Commissioning August 2009 FEL2009 Undulator Commissioning, Alignment and Performance Heinz-Dieter.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
27-Nov-2007 SLAC-ILC- AP Meeting Global Design Effort 1 Lucretia Developments PT SLAC.
James Welch August 27,2009 FEL 2009 Undulator K-Parameter Measurements at LCLS J. Welch, SLAC National Accelerator Laboratory Contributors:
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
FEL Spectral Measurements at LCLS J. Welch FEL2011, Shanghai China, Aug. 25 THOB5.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
LCLS Commissioning & Operations High Level Software
Beam Commissioning Adam Bartnik.
Expected hardware status and Priority of the commissioning task
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Beam Optics Set-Up at SLAC End Station A
LCLS Commissioning & Operations High Level Software
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
What am I working on… H. Loos 08/02/2010.
Commissioning Status of the LCLS Accelerator and Undulator Systems
Diagnostics overview and FB for the XFEL bunch compressors
Beam-Based Alignment Results
Recent Activities H. Loos 02/15/2011.
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
FEE Diagnostics and Commissioning
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Introduction [Documents and Parameters]
BEAM REALISTIC ERROR ORBIT IMPACT ON SASE PERFORMANCE
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik Loos

Applications for 11 November 2008 SLAC National Accelerator Laboratory Applications for 2009 Beam-Based Alignment of the FEL Undulator - (Loos) Undulator Steering and re-Pointing - (Nuhn) K-measurement Application - (Welch) Beam-Finder Wire Application - Centering & Emittance - (Loos/Nuhn) LTU Emittance Measurement - (Loos - extension of existing GUI) Beta-Matching into undulator - (Loos - extension of existing GUI) FEL Gain measurement – (Ratner/Huang)

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory HLA Software Upgrade Upgrades to existing software LTU Wire Scanners LTU & DMP Profile Monitors LTU Emittance Measurement WS32/OTR33 Undulator Beam Finder Wires Twiss Matching for LTU & Undulator New applications Undulator Beam based alignment Undulator K-measurement FEL Gain measurement

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Beam Finder Wires In/Out Scan Beam Undulator QuadRF BPM Girder BFW Use Matlab interface for girder motion control (J. Welch) Implement BFW position and beam size measurement in wire scanner application

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Extensions to Wire Scanner Application New LTU Wire Scanners Beam Finder Wires

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory LTU to Dump Beam Line FODO lattice for WS Drift for Slice emittance Undulator Dump LTU Bends

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Extensions to Emittance Application New Measurements EDSYS Matching Config Beam Finder Wires

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory LTU Slice Emittance Measurement EDSYS Matching Config

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Matching of LTU WS32 New Region Select Measurement Screen Select Matching Location(s)

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Matching of LTU OTR33 for Slice Emittance Select Measurement Screen

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Matching of Undulator for GeV New Region Fixed quad strength in Undulator Nominal match for GeV For lower energy, calculate proper Twiss values for undulator and rematch with QUMn quads Use RFBU10 as Matching location. Twiss calculated, not measured

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Matching of Undulator for 7.1 and 4.3 GeV

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Undulator Beam Based Alignment Measurement of undulator orbit at 3+ energies Fit of BPM & quad offsets and orbit Changes BPM offsets Moves quads with undulator girders Launches beam into undulator Integrates simulation Simulation Orbit Offsets Measurement

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Undulator K Measurement Shape of integrated spontaneous spectrum from two undulators depends on difference in K values J. Welch

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Undulator K-Measurement GUI J. Welch Collect spontaneous spectrum by varying electron beam energy and measure intensity through X-ray monochromator Determine ΔK from steepest slope in spectrum

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory K Measurement Setup Screen J. Welch

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory FEL Gain Measurement Application D. Ratner Vary total undulator length by retracting number of undulator segments GENESIS 1.3 Interface Display Simulation & Measurement

Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory Summary Extension of existing software mostly completed New applications for the undulator need to implement and test real hardware control