GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
GLAST Large Area Telescope:
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
I&T&C Organization Chart
GLAST Large Area Telescope:
Integration and Test GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
Presentation transcript:

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson NRL Gamma-ray Large Area Space Telescope

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 2 LAT Monthly Agenda 3:30 – 3:45Project Status Overview and PMCS Summary Neil Johnson 3:45 – 4:15System Engineering-VCRM Status, NCR update Pat Hascall 4:15 – 4:45FSW StatusJana Thayer 4:45 – 5:15ISOCRichard Dubois 5:15 – 5:30TVAC at NRL?Neil Johnson Teleconference: Passcode:

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 3 LAT Project Status 6/6 - 28Supported Observatory EMI Test 6/13Radiator Removal MGSE arrived at GD 6/17RS103 sensitivity troubleshooting 6/18-Y Radiator Removal 6/18Watt Rod Cage packed and shipped to SLAC 6/19-Y Radiator Reinstalled 7/6 - 7ETE 1b & ETE 2 7/10Repeat ETE 2 LAT Physics Run 7/10Completion of FSW dFQT – all requirements met 7/11Begin load LAT FSW 1-0-1

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 4 LAT Planned Milestones ActivityECD LAT FSW Install & Regression Testing7/14 Post EMI Observatory move7/14 Post EMI Radiator Removal7/15 Post EMI CPT7/18 LAT Radiator Flight Install7/25

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 5 I&T/Online Progress  EMI test completed with LICOS  No issues (and people say x.0 releases don’t work… hrmph!)  Bent pipe updates  Modified indicators to be clearer about unavailability of command window  Added confirmation dialog to handle accidental reconnect requests (can result in loss of tlm or cmd packets)  Solved long-standing byte swapping bug  Additional LRS strip charts created and installed at GD for EMI testing  Released LICOS 3.1 for compatibility with FSW B1-0-1  Prepared configurations using new configuration generation tool – LPA and LCI configurations built and verified to the extent possible on the various test stands – Some additional configurations generated – Prepared roll-back procedure  T&C DB updated  Script updates – intSeApp, etc. – GRB Handling (completion delayed to tomorrow due to testbed contention) – Science Modes  No significant procedural changes for operators  Verified some Online analyses against B1-0-1 data from the testbed  ACD cable 14 issue found – FSW investigating  Converting Online analyses to process meta event data  Provides robustness against dropped event packets  Handling of non-event science data  Various JIRAed bug fixes

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 6 Online JIRA issues (as of 7/10) Package Issues opened since 6/4 Issues closed since 6/4 Total # of issues currently open LICOS4146 LICOS_Config307 LICOS_ETC82015 LICOS_Scripts61116 INT0415 LDF001 LSF000 E-Logbook0020 Totals214980

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 7 LAT Issues and Concerns  Data Dropouts  Commands – Situation confusing, GD has increased focus – During FSW upload experienced dropped commands on RF and hardline – command decoding errors. Occurred on both A and B sides of S/C.  Science data – Situation also improving with increased GD focus  Engineering Telemetry – Still seeing dropouts induced by routine operations at a rate that could hide an underlying problem – FRB on Tuesday gave the issue more exposure – LAT team can support, but GD must take the lead  LAT Watt-rod Cage Rework  Some minor damage to heater rods in transit.  Shipping container will be improved to prevent damage prior to return.

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 8 Cost Reports for 4.1 LAT May 2007 Month End Gamma-ray Large Area Space Telescope

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 9 Cost Status by Organization

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 10 Cost by Orgs with Variances ≥$100K

GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 11 FTE Report