Introduction SAP Material Planning Dr. Djamal Ziani King Saud University.

Slides:



Advertisements
Similar presentations
Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing.
Advertisements

EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Production Planning & Execution (PP)
Consumption-based Planning
Material Requirements Planning
Managing Production across the Supply Chain
The Production Process
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
Module 11 Configuration for MRP. Semi-finished Materials  Dough is a semi-finished material: ## NRG–A (case) ## Dough NRG–A (lb) ## Oats (lb) ## Wheat.
Material Planning Process
The Production Process
Production and Planning Master Data SAP Implementation
High Lights of SAP Business One for Manufacturing.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Module 10 Setup for Production.
Material Requirements Planning and Enterprise Resource Planning Dr. Ron Lembke.
Production Planning Processes Theories & Concepts
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
MRP: Material Resource Planning
Phase II: Procurement SAP University Alliances Version 2.2
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Operations Management Material Requirements Planning
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
MM Master Data & Records SAP MM Master Data and Records
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Production Planning and Control
Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
TYPES OF DATA IN SAP There are 3 main types of data in SAP arranged in evolutionary aspects Configuration data( Client,Plant etc) Master data (Material,
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
 Tata Consultancy Services CONTENTS PRODUCTION ORDERS METHODS OF CREATING PRODUCTION ORDERS Results of creation and release of production order. Production.
 TATA CONSULTANCY SERVICES MM - Inventory management.
The Material Requirements Planning Process
Master Production Scheduling (MPS)
Material Requirements Planning (MRP)
MRP: Material Resource Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
Dynamics GP Manufacturing
R3 MRP Logic.
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
MATERIAL Requirements planning MRP
The Production Process
Material Requirement Planning (MRP)
Tour - session 2 Bills of materials
MRP and ERP.
14 MRP and ERP.
Chapter 14 Dependent Demand
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Introduction SAP Material Planning Dr. Djamal Ziani King Saud University

Organizational Level in Material Planning Client Company code Plant Storage location

Master Data Used Material Master Bill Of Material (BOM) Routings

Material Master

Material Type Raw materials Operating supplies Semi-finished products Finished products

Bill of Material (BOM) The BOM contains the assemblies or components, to be included in the production of a material. Used in MRP, production, procurement and for product costing

Bill of Material (BOM) The BOM are single level. The items of the BOM can themselves contain further BOM

Bill of Material (BOM) Plant: is the plant for which you wish to create or process the BOM. You can assign more than one plant. Alternative BOM: For distinguish the different BOM for the same material BOM usage: Where you want to use the BOM (production, engineering, costing…)

Routings Routings contain the steps that are necessary for production: – The corresponding operations – The sequence – Work center in which these operations are to be executed – Time elements that are relevant for scheduling the operations

Routings

MRP: Material Requirement Planning The system calculates the quantity required to continue the sales of the final product without any delays, considering the following resources: – Stock on hand. – Receipts: purchase orders, production orders (for the parent item) The system then subtracts the following requirements: – Sales orders – Forecasts – Production orders (for the child items) – A/R reserve invoices The system uses the planning policy to make the production/purchase order recommendations. The planning policy is based on: – Lead time, Minimum amount,, Time intervals Complete production orders for the parent item, quantities of the child items that comprise the BOM are needed. The system calculates the quantity of the child items, taking the MRP-dependent requirements into account. The system then recommends purchase/ production orders for the child items required for producing the parent item.

MRP: Material Requirement Planning

MRP

MRP-Processing Key NEUPL : Regenerative Planning. It will process ALL materials, disregards the fact whether or not planning relevant changes were made to the material. For NETCH and NETPL: the system take into consideration only changes that are relevant for planning a material (like sales order entry, purchase order entry, stock release, etc.). – NETCH : Net Change Planning – NETPL : Net Change Planning within Planning Horizon. if a change occurs outside the planning horizon (e.g. a sales order is entered 2 months away and your planning horizon is 6 weeks), then the material is not included in MRP even though there is a change.