PROJECT DELIVERY SYSTEMS

Slides:



Advertisements
Similar presentations
Contract CloseOut.
Advertisements

Project Procurement & Contract Administration Jiwei Ma
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Ensure Vendor/Engineer of Choice Product Quality
Session 8 Implementing PPPs
November 19, 2013 Preparing a Successful RFP to get Desired Results.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
CIVL202 Construction Engineering I Tutorial 6 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
CONSTRUCTION CONTRACTS DOCUEMENTS
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Working with internationally oriented contractors Training event on PPP programming and process management 27 May 2008 Twinning Project CZ/2005/IB/FI/04.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Agency Construction Management :CM NOT AT-RISK
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Chapter 11: Alternative Approach - Purchasing Systems.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
12.1 Plan Procurement: Introduction
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Quality Management Systems – Requirements
PROJECT DELIVERY METHODS
CH 3: Selecting the bid and choosing proposal team
MULTISPORTS CENTRE PRESENTATION
Presentation transcript:

PROJECT DELIVERY SYSTEMS

PROJECT DELIVERY SYSTEMS INTRODUCTION OWNER-PROVIDED DELIVERY TRADITIONAL DESIGN BID-BUILD CONSTRUCTION MANAGEMENT DESIGN-BUILD DESIGN-BUILD VARIATIONS FAST TRACKING

INTRODUCTION Owners, designers, and contractors make the decisions, provide the services, and perform the work to deliver constructed projects. These activities are known collectively as project delivery. The generic term “project delivery system” describes how the participants are organized to interact, transforming the owner’s project goals and objectives into a finished facility.

INTRODUCTION (CONT.) The owner usually considers the following factors to decide how project resources are to be organized: Past practices, traditions, and experience; The advice of consultants; Funding sources and constraints; The effective use of staff and working capital; The interests of other project stakeholders.

OWNER-PROVIDED DELIVERY Mostly applicable to projects where the scope of the work is within the owner’s range of skills, experience, and resources. Owners perform some or all of the design services and construction work themselves. E.g. simple modifications to an existing facility, projects with limited cost or complexity, repetitive projects.

TRADITIONAL DESIGN BID-BUILD (DBB) For many years, DBB has been the most common method of project delivery for public projects, and for many private projects as well. Design Bid-Build is effective on projects where the owner needs both professional design services and construction services where the designer does not require detailed knowledge of the means and methods of construction.

TRADITIONAL DBB (cont.) DBB provides the owner with a high degree of control. That’s why it is the preferred project delivery system for owners who: Wish to closely monitor projects Are public owners and must account in detail for expenditures. Are obligated by statute to procure professional design services by qualifications-based selection (QBS) regulations and constructors by competitive bidding.

TRADITIONAL DBB (cont.) The owner defines project goals and objectives, secures the financing, and specifies the standards and contract terms. The owner may perform planning, conceptual design and full design, or may engage an outside design professional (designer) for some or all of these tasks. During this planning and preliminary stage, owner and designer work as a team to obtain required permits and conduct necessary site investigations.

TRADITIONAL DBB (cont.) The designer prepares the construction bid documents to reflect the owner’s project goals and objectives, the project’s site conditions, and sound engineering practices. Prospective contractors prepare their bids from these complete and specific bid documents. The bidders submit their proposals to the owner (often w/ designer) , who determines the most responsive (typically the lowest) bid meeting project requirements. In certain circumstances, owner may be justified in selecting a contractor outright and negotiating contract terms directly.

CONSTRUCTION MANAGEMENT Many owners engage construction managers (CMs) to assist in developing bid documents and overseeing project construction. CM: Is a professional or a firm trained in the management of construction processes. Is generally interposed between the owner and some or all of the other participants. There are two general types of CM: Agency Construction Managers (ACM) Construction managers-at-risk (CM-at-risk)

CONSTRUCTION MANAGEMENT (cont.) ACM acts as an agent of the owner and extends the owner’s internal capabilities in performing traditional owner responsibilities. The level of service by the ACM can range from on-call advice to full project management. In some cases, the owner hires the ACM before design begins and ACM may participate in the selection of and contracting with the designer or might even be the designer.

CONSTRUCTION MANAGEMENT (cont.) CM-at-risk arrangement increases significantly owner’s delegation of control and risk. CM-at-risk typically contracts with the owner in two stages. First, CM-at-risk manages and undertakes services during conceptual & preliminary design phases with the design professional. When design is complete, owner and CM-at-risk then agree on a price and schedule for the completion of the construction work. CM-at-risk is popular for owners of private projects.

DESIGN-BUILD The owner contracts with a single entity to provide the design and to construct the project according to that design. The contract might be negotiated with a single design-builder or result from competitive proposals. The selection can be based on low price or on a set of value criteria (experience, staff, bonding capacity, etc.).

DESIGN-BUILD (cont.) Design-build provides the owner with a single point of contact for project responsibilities, eliminating the need to assist in resolving designer-contractor disputes. With the contractor playing a major role in design, costs are typically defined and maintained to a greater degree, and the coordination of fast-track management to achieve early completion is greatly simplified. The design-builder makes many decisions that owner would make under DBB, due to delegation of greatly increased authority.

DESIGN-BUILD (cont.) For many owners, delegation of responsibilities leads to satisfactory projects. However, if the parties are inexperienced and do not cooperate, the transfer of control and risk can be disappointing. The owner may need to restructure his/her internal procedures to accommodate design-build approach. Compared to DBB, this involves a significantly different set of requirements and expectations for process, timelines and communications. A clear understanding and documentation of design-build processes enhances the quality of design-build projects.

DESIGN-BUILD VARIATIONS Funding Option Variations Turnkey Developer Financed Projects Turnkey Variations

Funding Option Variations Private capital and developer participation offer private owners several variations on design-build. Lease-develop-operate arrangement: The owner gives a private operator a long-term lease to use, operate, and expand an existing facility. Public-private partnership or wrap around: Ownership of or fiduciary responsibility for a project is assigned to a private party. That party designs, builds, and may even own, operate and maintain the new facility.

Turnkey Turnkey adds to the design-builder’s responsibilities the operation and/or maintenance of the completed project. Turnkey delivery has the potential for bringing a new project on line more quickly. Three forms of turnkey project delivery: Design-build-operate-transfer Design-build-operate-maintain Design-build-own-operate-transfer

Developer-Financed Projects For highly specialized projects and circumstances, financing from a private or public developer or other third parties can offer additional variations on design-build and turnkey project delivery, each with new roles for owners, designers, and contractors.

Turnkey Variations Variations on turnkey add financing as a key component. While financing arrangements are unique for each project, developer financed projects generally resemble one of the turnkey delivery methods: FDBT (Finance, design, build, transfer) FDBOT (Finance, design, build, operate, transfer) FDBOOT (Finance, design, build ,own, operate, transfer) In each case, the transfer of the project occurs only after the developer’s interests and financial obligations have been satisfied.

FAST-TRACKING Fast-track approach compresses the schedule by sequencing the start of construction on underlying project elements (e.g. foundation, basic supporting structures) before final design is complete for interior or adjacent elements. Fast-tracking is not a method of delivery, rather, it’s a management strategy within delivery methods. While often successful in achieving schedule reductions, problems on fast-track contracts can create a domino effect on follow-on contracts for the project. Fast-track is more successful on projects that are straightforward and have a high level of predictability.