Overview of ILC Plans D.Rubin April 17, 2006. D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

ILC Accelerator School Kyungpook National University
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
ALPHA Storage Ring Indiana University Xiaoying Pang.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
CONVERSION EFFICIENCY AT 250 GeV A.Mikhailichenko Cornell University, LEPP, Ithaca, NY Presented at Positron Source Meeting Daresbury Laboratory,
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
J. Alexander + Cornell accelerator group Cornell University
CLIC Damping ring beam transfer systems
CLIC Undulator Option for Polarised Positrons
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
ERL Main-Linac Cryomodule
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CLIC damping rings working plan towards the CDR
Status of CTC activities for the Damping rings
Physics Design on Injector I
J. Seeman Perugia Super-B Meeting June 2009
Proposal for a CESR Damping Ring Test Facility
Summary and Plan for Electron Polarization Study in the JLEIC
Presentation transcript:

Overview of ILC Plans D.Rubin April 17, 2006

D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping ring to final focus

April 17, 2006D. Rubin3 Positron Source Design, construction and testing of prototype superconducting helical undulator Evaluation of impact of undulator on electron beam (Emittance dilution, depolarization)

April 17, 2006D. Rubin4 Undulator for Polarized Positron Source ILC polarized positron source –High energy electrons/positrons pass through a helical undulator –Circularly polarized photons converted in thin target  polarized positrons DR 5-GeV Linac Electrons Positrons Undulator Main Linac 5-GeV Linac

April 17, 2006D. Rubin5 E166 A. Mikhailchenko

April 17, 2006D. Rubin6 E166 Helical Undulator Undulator Parameters –Length = 1m –Undulator parameter, K= 0.17 –Period, = 0.25 –Inner diameter, 0.88mm –Magnetic field, 0.76T –Pulsed current 2300A –Pulse width, 12  s

April 17, 2006D. Rubin7 E166 Polarization (preliminary) For analyzing power A~17%, P e =7% Asymmetry measured  ~1%  P + = 85%±10% (Simulated P + = 84%) Plot by A. Mikhailichenko Positron asymmetry measured with maximal transmission through spectrometer

April 17, 2006D. Rubin8 Parameters of superconducting helical undulator – = 10mm –Aperture = 8mm –K= eH  u /(2  mc 2 ) = 0.7 –Length ~ 200m –Assembled from 4-m long modules Undulator for Polarized Positron Source

April 17, 2006D. Rubin9 Cryomodule, 4 m—long. Cryostat contains two 2 m–long identical sections having opposite polarity. This delivers zero first integral along this module Superconducting Helical Undulator Outer tube diameter is 5 inch.

April 17, 2006D. Rubin10 Sections installed in series. BPMs, pumps, quads etc installed between sections. Total length of installation ~200 m Superconducting Helical Undulator

April 17, 2006D. Rubin11 0.3m long undulator model –Optimize field quality –Evaluate effects on emittance and polarization of electron beam –Design, assemble and test –Field measurement in vacuum (Collaboration with Daresbury) Undulator for Polarized Positron Source

April 17, 2006D. Rubin12 Damping Ring - Design, construction and test of fast extraction/injection kicker - Design, construction, test of superconducting damping wiggler - Evaluation of design optics, including dynamic aperture - Development of modeling code for investigation of phenomena that limit beam current, bunch charge, emittance, stability. And measurement in CesrTF of the same - Development of beam based algorithms for alignment and low emittance tuning. And test in CesrTF - Development of instrumentation for measuring bunch by bunch beam size. And test in CesrTF R&D is coordinated with the ILC Damping Ring Working Group

April 17, 2006D. Rubin13 Fast Kicker R&D Baseline recommendation for ILC damping ring –6ns bunch spacing in damping ring  kicker rise and fall time and width –Bunch structure, 2820 bunches/train spaced 330ns apart in main linac  pulser burst rate = 3.25MHz –Stability of extraction kicker constrained by resulting jitter at IP –0.6mrad kick to 5GeV beam Kicker length limited to 360mm by rise and fall time requirement 10kV pulse  > 15 kickers in series Testing a conventional stripline kicker, with FID pulser  1 kV fast ionization dynistor (FID Technology, Ltd.) Collaboration with UIUC

April 17, 2006D. Rubin14 As measured after the A0 stripline kicker Fast Kicker R&D

10 pulses Kicker in A0 beam line Fast Kicker R&D

April 17, 2006D. Rubin16 Fast Kicker R&D Plans - Complete testing of 1kV pulser in FNAL A0 test beam - Purchase higher voltage pulser from FID Technology Inc. - Design and construct matched stripline kicker (with INFN?) - Install kicker in linac (CESR injector) including beam position monitors -Test kicker/pulser with MeV electron beam in linac

April 17, 2006D. Rubin17 Superconducting Damping Wiggler Recommendation for baseline configuration -> -> 200m of ~1.6T wiggler -Superferric design (CESR-c wiggler) Design study -> -CESR-c wiggler field quality and physical aperture are more than adequate We propose to design, construct and test a damping wiggler based on CESR-c wiggler and optimized for cost

April 17, 2006D. Rubin18 CESR-c Damping Wiggler

April 17, 2006D. Rubin19 Modeling and numerical evaluation of damping ring properties Development of simulation and modeling tools (BMAD library) Modeling code has been extensively tested in CESR and used to -Design and characterize CESR, CESR-c optics, including effects of wiggler nonlinearities -Evaluate collective effects in CESR/CESR-c -Diagnose and correct guide field errors

April 17, 2006D. Rubin20 Modeling and numerical evaluation of damping ring properties Development of simulation and modeling tools (BMAD library) Modeling code has been extensively tested in CESR and used to -Design and characterize CESR, CESR-c optics, including effects of wiggler nonlinearities -Evaluate collective effects in CESR/CESR-c -Diagnose and correct guide field errors We have extended the code to include –Spin tracking –Touschek effect And work is underway to incorporate –Space charge, intrabeam scattering etc.

April 17, 2006D. Rubin21 Modeling and numerical evaluation of damping ring properties Development of simulation and modeling tools (BMAD library) Modeling code has been extensively tested in CESR and used to -Design and characterize CESR, CESR-c optics, including effects of wiggler nonlinearities -Evaluate collective effects in CESR/CESR-c -Diagnose and correct guide field errors We have extended the code to include –Spin tracking –Touschek effect And work is underway to incorporate –Space charge, intrabeam scattering etc. Used it to evaluate –Dependence of dynamic aperture on wiggler properties –Dynamic aperture of all viable ILC damping ring & wiggler designs for ILC damping ring configuration study (in collaboration with ILC damping ring working group) -Beam-based alignment and emittance correction algorithms for CesrTF

April 17, 2006D. Rubin22 Damping Ring Beam diagnostics –Integrated streak camera into CESR control system –Turn by turn measurement of vertical beam size  radiation damping rate –X-ray imaging beam profile monitor (collaboration with Cal Tech and CHESS)

April 17, 2006D. Rubin23 CESR Damping Ring Test Facility T wigglers, 2GeV/beam  min ~ 2.25nm (  norm ~ 8.8  m)  x = 47ms  E /E = 0.086%  l = 15MV accelerating field

April 17, 2006D. Rubin24 Low Emittance Transport Damping Ring to Final Focus Development of model of transport of phase space and spin vector –Through guide field elements from damping ring to final focus –Including spin rotator, bunch compressor, main linac with charge dependent wakes, nonlinearities, misalignments, … Investigate sources of emittance dilution and depolarization Evaluate beam based correction algorithms Diagnose guide field errors during commissioning –Interpretation of information from BPM, beam size monitors, cavity HOM probes –To extract details of guide field errors and implement corrections (In collaboration with LET working group [SLAC,FNAL,DESY,CERN])

April 17, 2006D. Rubin25 Modeling of beam transport in main linac Spin rotator J.Smith Vertical projected emittance Polarization Spin orientation

April 17, 2006D. Rubin26 Modeling of beam transport in main linac Effectiveness of beam- based alignment in the presence of earth-like magnetic field J.Smith

April 17, 2006D. Rubin27 Summary of ILC R&D Plans (and LEPP qualifications) 1.Helical Undulator for Positron Source [Pulsed undulator for E166, Superconducting wigglers and anti-solenoids for CESR-c] 2.Damping Ring (pulser/kicker, wiggler, instrumentation, modeling, CesrTF) [Pulsed electronics, (gun pulser), CESR stripline feedback kicker, Superconducting magnets, wigglers, quadrupoles, solenoids, Modeling code, extensively tested in application in CESR, Bunch by bunch instrumentation in CESR, (beam size, position, luminosity,tune), Operational experience] 3.Low Emittance Transport - damping ring to final focus [Modeling code extended to include linac elements, Expertise implementing beam-based alignment in CESR]