Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Using an FPGA to Control the Protection of National Security and Sailor Lives at Sea Brenda G. Martinez, Undergraduate Student K.L. Butler-Purry, Ph.D.,
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
On MICE Coordinate System Yury Ivanyushenkov RAL.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
DAQ Considerations For Increased Rep. Rate J. Leaver 01/12/2009.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
1 SD Recorder OS-TM-V701A for Driving Security Surveillance.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
12/09/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
MOM report – part I Roumen Tsenov as MOM ( )
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
MICE Target Development Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Online Reconstruction 1M.Ellis - CM th October 2008.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Vladimir Sirotenko, Feb FPD: Runs & hisDB Oracle Databases Goal: access information about FPD experimental setup and accelerator conditions which.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Examples of Matlab Controls Software on ALICE Andy Wolski 24 September 2014 Multiknobs: simultaneous control of a set of magnets Undulator Gap Scan ALICE.
Mouse Exercise Monitoring System Erik Lappinen, Brooks Alford, Elizabeth Smith, Matt Gallegly Advisors: Dr. Michael McDonald, Dr. Randall Reiserer Vanderbilt.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Software modifications and reliability
Chapter 8 Data Acquisition
Presentation transcript:

Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels analog Target position is digital so convert to analog to read with card……. Unsatisfactory.

Software Status Two components DAQ code – James Reads raw data from card and dumps into event (individual pulses) files. Monitoring application MAP – Mice Analysis Program EPICS based monitoring - Pierrick

Variables Recorded ISIS beam intensity - analog Target dip depth – digital Beamloss all kinds – analog Frame status raised/lowered - analog Delay Beam Position

P s,T s T Beam on T Beam off P min,T min BL Peak

Integration with Main DAQ J-Ss card installed in target DAQ machine J-S independently producing code to read from target DAQ. Need to ensure we can simultaneously monitor target Need to be able to switch back to own DAQ on demand

What do we want to Display Target depth or distance from beam centre Delay ISIS beam intensity Pulse shape (parameterised ?) Beamloss in various parts of ring What is definition of beamloss ?

Discussion NI have indicated that new drivers “may” be available in December. What do we do if NI cannot supply updated drivers ? Does the EPICS monitoring system meet our requirements ? Can we parameterise the data on the fly for velocity, acceleration etc. ?

Discussion Will new control system (Paul S) need new monitoring software ? Anything I have not thought of ?