GLAST LAT Project Managers F2F 6/15/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project Technical/Cost/Schedule Review 05/24/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Chapter 11: Testing The dynamic verification of the behavior of a program on a finite set of test cases, suitable selected from the usually infinite execution.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
CLEANROOM SOFTWARE ENGINEERING.
GLAST Large Area Telescope:
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
I&T&C Organization Chart
First Look at Housekeeping Data
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Overview Goal Study GEM variables in SVAC ntuple
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
SVAC Configuration Verification
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test June 15, :00 PM Integration and Test 6 Towers Elliott Bloom I&T Manager Ken Fouts I&T Engineering Manager SLAC Eduardo do Couto e Silva SVAC Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project Managers F2F 6/15/ Integration and Test 2 Last Month's Accomplishments (1 of 2) Management –Tracking hardware shortages for LAT integration. –Procedure Status –68 of 70 submitted for sign-off or released IFCT –Completed 4 tower tests. –Completed I&T receiving tests on 3 TKR’s, 3 CAL’s and 3 TEM’s. –Completed assembly and installation of the grid cooler (aka the Chilla from Manila). –Completed installation of 2 additional towers for a total of 6 towers installed in the grid. –Preparations complete for 6 tower tests.

GLAST LAT Project Managers F2F 6/15/ Integration and Test 3 Last Month's Accomplishments (2 of 2) Online –LATTE Supported VSC software Python interface implementation Exploratory work in progress to demonstrate interaction with the VSC and its software interface released –Initiated by ACD-discovered bug –Bug fixes, Trigger GUI, GPIB support –Updated Hippodraw addressing some memory leaks –Updated trigger GUI to address concerns raised in trigger meeting –Bug fix for incorrectly initialized TEM BUSY_LRS_MASK register (measures TEM deadtime) Housekeeping multi-pen strip-chart GUI V2.0 deployed to cleanroom for real-time monitoring. E-logbook Version released (minor bug fixes with corresponding tutorial and documentation updates)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 4 I&T Activities Grid Chiller Unit Installation Grid Cooling Six CAL/TEM’s Installed Six Tower’s Integration

GLAST LAT Project Managers F2F 6/15/ Integration and Test 5 Procedure Status 70 documents total 68 latest versions submitted for sign-off 65 are released

GLAST LAT Project Managers F2F 6/15/ Integration and Test 6 Procedure Status – Management

GLAST LAT Project Managers F2F 6/15/ Integration and Test 7 Procedure Status – IFCT Electrical

GLAST LAT Project Managers F2F 6/15/ Integration and Test 8 I&T NCRs by Month Open/Closed Status Month NCR Opened Current Status As of June 14 th NCR Summary 24 Open 38 Closed

GLAST LAT Project Managers F2F 6/15/ Integration and Test 9 Power Outage Impact on I&T Emergency Generator allowed work to continue in B33. Room 103 circuit breaker/panel fault was resolved by turning off non-essential power. Room 104 was unaffected by the panel fault. TKR 3 was installed on Thursday, June 19. Root cause of the circuit breaker fault was found to be a loose connection on the main power coming into the panel. The building was brought back to 100% with minimal impact to building users.

GLAST LAT Project Managers F2F 6/15/ Integration and Test 10 Online Progress –LATTE 5 Meetings with SE, ISOC and FSW Requirements doc in progress Took delivery of a Dell blade server –Used to develop LATTE 5 concepts –Test mobile rack concepts –Progress on parallelizing the scripts: TKR scripts nearly complete and tested CAL CPT and LPT nearly complete and tested. INT (e2e, SVAC) scripts complete. CalibGen, CalibDac and MuTrg still to go –ACD script preparation and test support ongoing. –Risks to schedule: Continued ACD problems requiring one or more of the Online team to make a site visit LATTE 5 requirements are converging slowly.

GLAST LAT Project Managers F2F 6/15/ Integration and Test 11 I&T Detail Schedule (1 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 12 I&T Detail Schedule (2 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 13 I&T Detail Schedule (3 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 14 I&T Detail Schedule (4 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 15 I&T Detail Schedule (5 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 16 I&T Detail Schedule (6 of 6)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 17 Issues & Concerns ISSUES NCR 497 for connector clips and screws. Availability of flight hardware. –Shortages identified by I&T and being worked with Subsystems. TKR Deliveries SIU, EPU Deliveries from ELX Flight Cables CONCERNS Continued support from subsystems for NCR closure. TPS rework and replacement, availability for future tower installations. Need firm delivery dates for third layer ELX boxes LATTE 5.0 ready Oct. 1 for use in LAT Functional testing due to start 10/14. E2E tests start 11/1.

GLAST LAT Project Managers F2F 6/15/ Integration and Test 18 NCR 497 Summary (1 of 2) Background: An NCR was generated for the orientation of clips and fasteners on incoming cables from Cicon. SLAC specifies 2 Glenair connector types on cables. Thread damage was found on fasteners due to a mismatched clip and fastener configuration. Findings: The Glenair connector drawings are incorrect and confusing. Clips will damage fastener threads if installed incorrectly. Some clips damage fastener threads when installed correctly. Connectors from Glenair delivered to Cicon in wrong configuration. Cicon put clips on the way they were received. Corrective Action: Replace clip and fasteners at SLAC with new hardware and inspect fastener threads per NCR 497 disposition.

GLAST LAT Project Managers F2F 6/15/ Integration and Test 19 NCR 497 Summary Recess in threads should line up with square feature in clip

GLAST LAT Project Managers F2F 6/15/ Integration and Test 20 SAS Interfaces SVAC is happy with CCB process –Thanks Richard Code release is getting more stable and reliable –Working with SAS to sharpen validation procedures –specially calibrations Pipeline issues are more infrequent –We expect to transition into a more robust architecture in a not so distant future –Ought to be tailored to the ISOC needs

GLAST LAT Project Managers F2F 6/15/ Integration and Test 21 Data Analysis Issues (up to 4 tower data) Hardware failures or problems –None so far !!! Kudos to the “royal we” Anomalies in offline distributions –Becoming less frequent and mostly due to –Incorrect configurations (mostly operational procedures) –Mistakes in the offline data analysis codes Understanding how the instrument works –Time sink because it requires a much broader knowledge of –Integrated detector system functions and performance –Details of complex offline software –How the analysis parameter space changes as we add more towers

GLAST LAT Project Managers F2F 6/15/ Integration and Test 22 Feedback to Integration and Test The Instrument Analysis effort has already provided valuable feedback to Integration in several ways –Examples will be provided in the next slides Improving Operations –We provided a cross check to existing procedures –and suggested improvements Understanding Instrument performance –We generated discussions on a particular topic –That led to different operational settings –We generated new tests –To verify functionality at the integrated level

GLAST LAT Project Managers F2F 6/15/ Integration and Test 23 Feedback to Operations: Procedures SVAC automated reports identified that GEM was not reporting trigger information properly for some of the 4 tower tests Action –stopped data taking to investigate root cause (Eduardo) Root cause –incorrect power up of system –found by Horwitz and confirmed by Huffer Recommendation to I&T –Improve procedures –Introduce online control plots during data taking

GLAST LAT Project Managers F2F 6/15/ Integration and Test 24 Understanding Performance: TEM diagnostics We are trying to investigate 1% effects when TEM diagnostics were enabled (Luis) –Mike pointed out that we should be careful –TEM diag disabled in the default for on-orbit operations –System is too complex and more measurements are needed to understand the timing behavior Used trigger group discussions to –Understand timing diagram with TEM diagnostics on –How to quantify effects Thanks for the help –Su Dong and Martin –Mike

GLAST LAT Project Managers F2F 6/15/ Integration and Test 25 Understanding Performance: TKR Settings April 15: Anders looked at the variable GemCondArrivalTimeTkr in the SVAC ntuple and … –he did not understand the spike at 31 Bill asked Anders whether one-shots were used or not Anders checked with Online (Lester) and the answer was no The trigger/ELX group was asked to chime in and investigate with all relevant parties whether we turn the one-shot on or not during data taking –Discussion involved on-orbit operations in the presence of CNO events May 25: Steve chaired a discussion in which we decided to change the way we will configure the TKR for the 4 tower tests –One shots were turned on June: Anders is comparing 2 tower data without one-shots with 4 tower data with one shots –stay tuned!

GLAST LAT Project Managers F2F 6/15/ Integration and Test 26 Understanding Performance: CAL Retriggering CAL FLE Retriggering identified at NRL tests (Sasha) –Need to study what happens to FHE Discussion will be brought up today in the trigger meeting –Benefits from Eric’s presence at SLAC

GLAST LAT Project Managers F2F 6/15/ Integration and Test 27 Understanding the Instrument: Housekeeping Checked temperature differences from CAL to TKR –CAL is 1.5 degrees cooler than top of TKR –Differences can be understood because of convection –Italy checked that thermistors work fine

GLAST LAT Project Managers F2F 6/15/ Integration and Test 28 Understanding Performance: Deadtime Warren Implemented an offline variable to measure time without being affected by roll over of counter Measured deadtime in several configurations –Trying to understand numbers right now Proposed a new test to prescale hits at the GEM level –Similar to on-orbit operations –enable more than one trigger engine –However, it stresses less the TD&F –Therefore keep current prescaling tests

GLAST LAT Project Managers F2F 6/15/ Integration and Test 29 Do we have enough data yet? One tower Two towers –End-to-end cosmic ray data –To exercise trigger and data flow capabilities –SVAC cosmic ray data –To perform calibrations –To do performance studies that require large statistical sample Four towers to Sixteen towers (prior to ACD integration) –Only planned to collect SVAC data –May request some tests (most likely between 6 and 8 towers) to –Configure the instrument to take data with 2 Trigger Engines (simulate on-orbit operation) –Study nominal/high rates with TEM diagnostics OFF –Understand TKR one-shot behavior –Study TKR cable FIFO errors (caused by induced showers)

GLAST LAT Project Managers F2F 6/15/ Integration and Test 30 Number of Talks in the IA meetings Workshop 1 Workshop 2 Workshop 3 Workshop 4 Scheduled for July14-15, 2005 After a year of effort, here we are….

GLAST LAT Project Managers F2F 6/15/ Integration and Test 31 Contributions to Instrument Analysis Effort

GLAST LAT Project Managers F2F 6/15/ Integration and Test 32 Data Analysis Efforts We generated a list of 15 potential topics for –Immediate analysis with data from 1 to 6 towers –Presentations during IA workshop July Working with subsystems (Neil,Dave,Ronaldo,Francesco) to –Sharpen topics and ideas –Identify names for presentations Initiated contacts ACD –Would like to have presentation during IA workshop –If Dave can support that given the ACD schedule –Need to discuss details for ACD tests at SLAC –Test plans –SAS Offline software –Pipeline scripts and related infrastructue