Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.

Slides:



Advertisements
Similar presentations
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS TROUBLE SHOOTING A NO START CAR.
Advertisements

Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
Numbers
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Recent Result of TOF Monitor System Qian LIU. Outline  Ref-PMT  Barrel TOF  End cap TOF.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
Polishing the Ferrules Howard Budd Aug Looking at the Old Ferrules I found 3 polished ferrules One was shown in the previous ppt file We photographed.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Romans 8:12 – So then, my friends, we have an obligation, but it is not to live as our human nature wants us to. 13 For if you live according to.
Solving Quadratic Equations by Completing the Square
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
AMD Danube Platform Introduction
Chapter 4 – Graphing Linear Equations 4.7 – Solving Linear Equations Using Graphs.
Yesterday I got _____ at 6 o´clock End Choose the correct alternative.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
Unit 3 Sections 1-5 Sentence Frames 2 nd Grade. Unit 3 Section 1 Sentence Frames 2 nd Grade.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
TIP-TILT FIBER INVESTIGATION OF FERRULE BREAKAGE MICHAEL LEFEBVRE / LBTO AO TECHNICIAN NOVEMBER 29, 2014.
Solving Equations with the Variable on Each Side 2.4.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
If you ride your bike everywhere, even during bad weather, the Veltop is for you. It allows you to cycle sheltered from the rain, cold, wind and sun. It.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
ELEMENTS OF ART TODAY WE WILL CREATE AN INFO-GRAPHIC ELEMENTS RESOURSE. THIS WILL HELP YOU IN YOUR EFFORTS TO CREATE A RESOURSE WHEN CREATING ART ACCORDING.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Don’t let them catch your computer!!!!!
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
September 30, 2008 Jim Van Dyke, Web:
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Optoelectronics internal report, 17 August 2007
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
BPMs in the new Dump Line
Integration issues at IHEP
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Nearly the end of a long story...
IFR detector mechanics
Most Effective Methods to Replace a Brake Light Switch.
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Ch. 2.2 Viewing Cells.
Maki KUROSAWA VTX Group 2014 Feb 20
مفاهیم بهره وري.
THANK YOU!.
Thank you.
Urgent Simulator Repairs
Thank you.
Compound Inequalities.
Organization Information
Solving Equations Containing Rational Expressions § 6.5 Solving Equations Containing Rational Expressions.
Fix Brother Printer Issues
Question 1. Question 1 What is 10 x 40? A 40 B 400 C 4000 D 4.0.
Best Deals & Offers- FiOS Plans Call to +1(844) (USA)FiOS Plans.
Presentation transcript:

Bad Fibers LIU Qian

Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into sliced tube

Then we used LED source and test fibers (bundle 45), and checked one by one. Watch from common end barrel Test fibers LED source We found that 62-e, 62-f, 66-a have no light coming out from common end.

According to the database, 62-c, 62-e, 62-f, and 66-a have no data. For 66-a, we know it is broken, and we didn’t install it. For bundle 62. Since 62-c, 62-d, 62-e, 62-f are all bad, Fred suggested us using bundle 46 instead of it. So 46-c, 46-d, 46-e, 46-f are all installed. But maybe 62-e, 62-f are OK, it is the main bundle of these two fibers are broken. or

According to the installation database, in this section, we have 60-h, 61-h as spare fibers. If we want to fix it, we’d better do it ASAP. The MDC group are installing their cables of west side. We use bundle 46 instead of bundle 62, and all of them are installed.

For east side, I’ve checked the database, we won’t have this problem. Thanks! LIU Qian